BLD-Final | 6/24/2019 | 6/25/2019 | 6/25/2019 | A | PASS |
Jim Storey
|
|
|
Garage code 0607 or 0706 Phone #: ###-#### Inspection requested via web by Elena Stephens
|
DOC - Permit Finaled | 6/25/2019 | 6/25/2019 | 6/25/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Blower Door Test Results | 6/25/2019 | 6/25/2019 | 6/25/2019 | P | DONE |
Jim Storey
|
|
|
Garage code 0607 or 0706 Phone #: ###-#### Inspection requested via web by Elena Stephens 4.27
|
BLD-Energy code compliance | 4/8/2019 | 4/9/2019 | 4/9/2019 | A | PASS |
Brandon Shaw
|
|
|
Inspection requested via web by Marc Foote
|
BLD-Framing/Rough-in | 4/8/2019 | 4/9/2019 | 4/9/2019 | A | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Framing/Rough-in | 4/4/2019 | 4/5/2019 | 4/5/2019 | A | PART |
Jim Storey
|
|
|
Inspection requested via web by Marc Foote replace all hangers where nailling was outside of mfg. holes.
|
BLD-Wall Bracing | 3/21/2019 | 3/28/2019 | 3/28/2019 | A | CANC |
Brandon Shaw
|
|
|
>> Inspection requested via web by Marc Foote Inspection cancelled from web by: Marc Foote
|
BLD-Wall Bracing | 3/19/2019 | 3/20/2019 | 3/20/2019 | A | PASS |
Jim Storey
|
|
|
Inspection requested via web by Marc Foote
|
BLD-Wall Bracing | 3/18/2019 | 3/19/2019 | 3/19/2019 | A | CANC |
Jim Storey
|
|
|
>> Inspection requested via web by Marc Foote Inspection cancelled from web by: Marc Foote
|
BLD-Footing | 12/28/2018 | 12/28/2018 | 12/28/2018 | P | PASS |
Jim Storey
|
|
|
Jared Phone #: ###-####
|
Inspection Record Card- Bld | | | 12/18/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/18/2018 | | DONE |
|
|
|
|
Telephone call | | | 12/18/2018 | | DONE |
|
|
|
emailed Bryan permit to be signed
|
OVERRIDE | | | 8/24/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 8/8/2018 | 8/8/2018 | 8/24/2018 | | DONE |
Brian McGowan
|
|
|
08/21 sfd L1 ePlan - Corrections Required
|
Routing - PLAN CHECK | 8/24/2018 | | 8/24/2018 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/24/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 8/24/2018 | | DONE |
|
|
|
met
|
1st review completed | | | 8/21/2018 | | FAIL |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 8/8/2018 | | 8/21/2018 | | FAIL |
Brian McGowan
|
|
|
|
Routing - MECHANICAL | 8/8/2018 | | 8/14/2018 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 8/8/2018 | 8/11/2018 | 8/9/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Application received | | | 8/8/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 8 2018 9:23AM
|
Plans ACCEPTED BY PLAN TECH | | | 8/8/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/8/2018 | | DONE |
|
|
|
|
Intake Approval | | | 8/8/2018 | | PASS |
|
|
|
|
Routing - PLANNING | 8/8/2018 | | 8/8/2018 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - Addressing | 8/8/2018 | | 8/8/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/8/2018 | | 8/8/2018 | | PASS |
Rachael Beierle
|
|
|
|