BLD-Final | 2/20/2019 | 2/21/2019 | 2/21/2019 | A | PASS |
Jim Storey
|
|
|
CALL TO BE LET IN // TIM Phone #: ###-####
|
DOC - Permit Finaled | 2/21/2019 | 2/21/2019 | 2/21/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 2/19/2019 | 2/19/2019 | 2/19/2019 | P | NR |
Mike Jordan
|
|
|
call for access- Tim Phone #: ###-####. Needs mech. final.
|
BLD-Ceiling Grid Inspection | 1/24/2019 | 1/25/2019 | 1/25/2019 | A | PASS |
Jim Storey
|
|
|
Tim Phone #: ###-#### mlb ok to cover
|
BLD-Energy code compliance | 1/15/2019 | 1/16/2019 | 1/16/2019 | A | PASS |
Jim Storey
|
|
|
Tim Phone #: ###-####
|
BLD-Framing/Rough-in | 12/20/2018 | 12/21/2018 | 12/21/2018 | A | PART |
Jim Storey
|
|
|
Tim Phone #: ###-#### ok pending trades
|
BLD-Framing/Rough-in | 12/13/2018 | 12/14/2018 | 12/14/2018 | A | PART |
Jim Sly
|
|
|
Tim Phone #: ###-#### Called for frame....should have been shear.....shear insp. OK.
|
BLD-Footing | 8/28/2018 | 8/29/2018 | 8/29/2018 | A | PASS |
Brandon Shaw
|
|
|
As per plans- 2 #4 rebar in stem wall
|
BLD-Footing | 8/23/2018 | 8/24/2018 | 8/24/2018 | A | PART |
Jim Storey
|
|
|
Dan Phone #: ###-#### need plans/ no ft at front of garage/ set back ok
|
Issue PAID IN FULL permit | | | 8/10/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 8/8/2018 | | |
|
|
|
|
Routing Walk-In (Zoning) | 8/8/2018 | 8/8/2018 | 8/8/2018 | A | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 8/8/2018 | 8/8/2018 | 8/8/2018 | A | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 8/8/2018 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 8/8/2018 | | 8/8/2018 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 8/8/2018 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 8/8/2018 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/8/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 8/8/2018 | | DONE |
|
|
|
Need
RP
|
Application received | | 8/8/2018 | | | |
|
|
|
|