Print Statement | | | 11/13/2019 | | DONE |
|
|
|
|
Third Notice | | 9/25/2019 | 10/29/2019 | | DONE |
|
|
|
Mailed 11-1 with second follow up
|
Second Follow up | | | 10/29/2019 | | DONE |
|
|
|
|
Third Notice | | 8/18/2019 | 9/20/2019 | | DONE |
|
|
|
mailed 9-23-19 with first follow up letter
|
First Follow up | | | 9/20/2019 | | DONE |
|
|
|
|
Third Notice | | 7/15/2019 | 8/13/2019 | | DONE |
|
|
|
mailed 8-13
|
Third Notice | | 6/15/2019 | 7/10/2019 | | DONE |
|
|
|
mailed 7-11
|
Second Notice | | 5/16/2019 | 6/10/2019 | | DONE |
|
|
|
mailed 6-11
|
Case Summary (BLD) | | | 5/16/2019 | | DONE |
|
|
|
|
First Notice | 5/3/2019 | 5/3/2019 | 5/6/2019 | | DONE |
Brandon Shaw
|
|
|
mailed 5-10-19
|
BLD-Final | 5/2/2019 | 5/3/2019 | 5/3/2019 | A | PASS |
Brandon Shaw
|
|
|
noah Phone #: ###-####
|
DOC - Permit Finaled | 5/3/2019 | 5/3/2019 | 5/3/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Framing/Rough-in | 4/3/2019 | 4/3/2019 | 4/3/2019 | A | PASS |
Brandon Shaw
|
|
|
Footing and framing, good to go...
|
BLD-Final | 4/2/2019 | 4/3/2019 | 4/3/2019 | A | CANC |
Brandon Shaw
|
|
|
Noah Phone #: ###-####
|
Print Occupancy Form | | | 3/12/2019 | | |
|
|
|
|
Telephone call | | | 2/4/2019 | | DONE |
|
|
|
left a message for noah informing that this permit is going to expire at 5pm today and is welcome to send in a request for an extension. showing in the notes anjennett paid for the permit but does not work for RCH so could not issue permit
|
Issue PAID IN FULL permit | | | 2/4/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/1/2019 | | DONE |
|
|
|
|
Telephone call | | | 2/1/2019 | | DONE |
|
|
|
Anjenette came in to pickup permit-she is not the GC so she paid the fees and will send the GC in
|
Routing - PLAN CHECK | 1/16/2019 | | 1/28/2019 | | PASS |
Michael Hanson
|
|
|
|
Routing Off Site - STRUCTURAL | 11/23/2018 | | 1/28/2019 | | PASS |
Michael Hanson
|
|
|
Passed per ePlan D. Haugland. MDH
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/28/2019 | | DONE |
Michael Hanson
|
|
|
|
Plan assigned to (M_H) | 10/23/2018 | | 1/28/2019 | | DONE |
Michael Hanson
|
|
|
11/21 #502 L1 ePlan. 1st review completed - Structural corrections required. MDH
|
Routing - PLAN CHECK | 11/16/2018 | | 1/16/2019 | | FAIL |
Michael Hanson
|
|
|
See changemarks in ePlan. MDH
|
Routing - PLANNING | 1/16/2019 | | 1/16/2019 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - Design Review | 1/16/2019 | | 1/16/2019 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - PLANNING | 12/19/2018 | | 12/19/2018 | | FAIL |
Katelyn Menuge
|
|
|
Please upload Postmaster approval letter
|
Routing - Design Review | 12/19/2018 | | 12/19/2018 | | FAIL |
Katelyn Menuge
|
|
|
Please upload Postmaster approval letter
|
Route to Impact Fee Review | 11/29/2018 | 12/2/2018 | 11/30/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 11/29/2018 | | DONE |
Michael Hanson
|
|
|
|
Routing - FIRE | 10/23/2018 | 10/23/2018 | 11/28/2018 | | PASS |
Erika Akin
|
|
|
No impact to exisitng FD access. No fire life safety inspection required.
|
Routing Off Site - STRUCTURAL | 10/23/2018 | | 11/16/2018 | | FAIL |
Michael Hanson
|
|
|
See changemarks in ePlan per D. Haugland AHJ engineering. MDH
|
Routing - PLAN CHECK | 10/23/2018 | | 11/16/2018 | | FAIL |
Michael Hanson
|
|
|
See changemarks in ePlan. MDH
|
Routing PW Flood Plain | 10/23/2018 | | 10/29/2018 | | PASS |
Jason C. Taylor
|
|
|
Approved LOMR on File. No floodplain review required. If you have any questions, please call Jason Taylor at ###-####.
|
Routing - Erosion and Sediment | 10/23/2018 | | 10/24/2018 | | PASS |
Michael Zawacki
|
|
|
|
Routing - Design Review | 10/23/2018 | | 10/23/2018 | | FAIL |
Katelyn Menuge
|
|
|
Need Postmaster approval letter uploaded.
|
Routing PW Street Lights | 10/23/2018 | | 10/23/2018 | | PASS |
Tom Marshall
|
|
|
|
Routing - PLANNING | 10/23/2018 | | 10/23/2018 | | FAIL |
Katelyn Menuge
|
|
|
Need Postmaster approval letter uploaded.
|
Routing - Addressing | 10/23/2018 | | 10/23/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 10/23/2018 | | 10/23/2018 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 10/18/2018 | | PASS |
|
|
|
|
Intake Approval | | | 9/5/2018 | | FAIL |
Joe Bruce
|
|
|
To complete you prescreen you need to provide all items on the checklist if there is only a "Yes" box listed in the column. See items below that are required:
1) Provide a verification of legal lot or parcel form. This will need to be signed and approved by the PDS Subdivision Staff.
2) Provide site specific fire flow at fire hydrant letter.
3) Permanent O&M Maintenance Agreement form needs to be completed and mailed to public works drainage coordinator. Contact Brian Murphy at (Phone: ###-####) with any questions.
4) Provide a vicinity map, land use zone, table of contents, and code analysis on the plans.
5) Provide a site plan that shows location of structure on the property and relation to existing buildings, structures, fire department access, fire hydrants, etc...
6) On all plan sheets: Reserve the bottom right corner for City approval stamps. (Cover sheet: Leave a blank 4” x 4” space located 3” off the right sheet edge to allow for the title block. Other sheets: Leave a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block.) - See page 6 of Electronic Plan submittal standards.
|
Intake Approval | | | 8/31/2018 | | FAIL |
Joe Bruce
|
|
|
1) Missing form #502 application checklist.
Please fill out and upload "#502 – New Commercial/Commercial Additions Plan Intake Submittal Checklist" with all required items uploaded on EplanReview.
|
Application received | | | 8/8/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 8 2018 1:11PM
|