Permit Information
Permit NumberBLD18-02868
StatusFinaled
Name RCH CONSTRUCTION
Site Address 3735 S MILLBROOK WAY
Project NameDHE #16 Postal Structure
Customer Number 
ePlanReviewYes
Description
(DALLAS HARRIS POSTAL PAVILION) Permit for the construction of an open aired 120 sq. ft. postal structure. Approved LOMR on file for floodplain. Structural engineering provided. Concrete foundation and 6-6" tall retaining wall with rebar. All work per approved plans, notes, engineering, code, and city ordinances. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  11/13/2019 DONE
Third Notice 9/25/201910/29/2019 DONE
Mailed 11-1 with second follow up
Second Follow up  10/29/2019 DONE
Third Notice 8/18/20199/20/2019 DONE
mailed 9-23-19 with first follow up letter
First Follow up  9/20/2019 DONE
Third Notice 7/15/20198/13/2019 DONE
mailed 8-13
Third Notice 6/15/20197/10/2019 DONE
mailed 7-11
Second Notice 5/16/20196/10/2019 DONE
mailed 6-11
Case Summary (BLD)  5/16/2019 DONE
First Notice5/3/20195/3/20195/6/2019 DONE
DetailsBrandon Shaw
mailed 5-10-19
BLD-Final5/2/20195/3/20195/3/2019APASS
DetailsBrandon Shaw
noah Phone #: ###-####
DOC - Permit Finaled5/3/20195/3/20195/3/2019PPASS
DetailsBrandon Shaw
BLD-Framing/Rough-in4/3/20194/3/20194/3/2019APASS
DetailsBrandon Shaw
Footing and framing, good to go...
BLD-Final4/2/20194/3/20194/3/2019ACANC
DetailsBrandon Shaw
Noah Phone #: ###-####
Print Occupancy Form  3/12/2019  
Telephone call  2/4/2019 DONE
left a message for noah informing that this permit is going to expire at 5pm today and is welcome to send in a request for an extension. showing in the notes anjennett paid for the permit but does not work for RCH so could not issue permit
Issue PAID IN FULL permit  2/4/2019 DONE
Permit Ready to Issue  2/1/2019 DONE
Telephone call  2/1/2019 DONE
Anjenette came in to pickup permit-she is not the GC so she paid the fees and will send the GC in
Routing - PLAN CHECK1/16/2019 1/28/2019 PASS
DetailsMichael Hanson
Routing Off Site - STRUCTURAL11/23/2018 1/28/2019 PASS
DetailsMichael Hanson
Passed per ePlan D. Haugland. MDH
PLANS/APPL TAKEN TO FRONT DESK  1/28/2019 DONE
DetailsMichael Hanson
Plan assigned to (M_H)10/23/2018 1/28/2019 DONE
DetailsMichael Hanson
11/21 #502 L1 ePlan. 1st review completed - Structural corrections required. MDH
Routing - PLAN CHECK11/16/2018 1/16/2019 FAIL
DetailsMichael Hanson
See changemarks in ePlan. MDH
Routing - PLANNING1/16/2019 1/16/2019 PASS
DetailsKatelyn Menuge
Routing - Design Review1/16/2019 1/16/2019 PASS
DetailsKatelyn Menuge
Routing - PLANNING12/19/2018 12/19/2018 FAIL
DetailsKatelyn Menuge
Please upload Postmaster approval letter
Routing - Design Review12/19/2018 12/19/2018 FAIL
DetailsKatelyn Menuge
Please upload Postmaster approval letter
Route to Impact Fee Review11/29/201812/2/201811/30/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  11/29/2018 DONE
DetailsMichael Hanson
Routing - FIRE10/23/201810/23/201811/28/2018 PASS
DetailsErika Akin
No impact to exisitng FD access. No fire life safety inspection required.
Routing Off Site - STRUCTURAL10/23/2018 11/16/2018 FAIL
DetailsMichael Hanson
See changemarks in ePlan per D. Haugland AHJ engineering. MDH
Routing - PLAN CHECK10/23/2018 11/16/2018 FAIL
DetailsMichael Hanson
See changemarks in ePlan. MDH
Routing PW Flood Plain10/23/2018 10/29/2018 PASS
DetailsJason C. Taylor
Approved LOMR on File. No floodplain review required. If you have any questions, please call Jason Taylor at ###-####.
Routing - Erosion and Sediment10/23/2018 10/24/2018 PASS
DetailsMichael Zawacki
Routing - Design Review10/23/2018 10/23/2018 FAIL
DetailsKatelyn Menuge
Need Postmaster approval letter uploaded.
Routing PW Street Lights10/23/2018 10/23/2018 PASS
DetailsTom Marshall
Routing - PLANNING10/23/2018 10/23/2018 FAIL
DetailsKatelyn Menuge
Need Postmaster approval letter uploaded.
Routing - Addressing10/23/2018 10/23/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS10/23/2018 10/23/2018 PASS
DetailsMorgan Webb
Intake Approval  10/18/2018 PASS
Intake Approval  9/5/2018 FAIL
DetailsJoe Bruce
To complete you prescreen you need to provide all items on the checklist if there is only a "Yes" box listed in the column. See items below that are required:
1) Provide a verification of legal lot or parcel form. This will need to be signed and approved by the PDS Subdivision Staff.
2) Provide site specific fire flow at fire hydrant letter.
3) Permanent O&M Maintenance Agreement form needs to be completed and mailed to public works drainage coordinator. Contact Brian Murphy at (Phone: ###-####) with any questions.
4) Provide a vicinity map, land use zone, table of contents, and code analysis on the plans.
5) Provide a site plan that shows location of structure on the property and relation to existing buildings, structures, fire department access, fire hydrants, etc...
6) On all plan sheets: Reserve the bottom right corner for City approval stamps. (Cover sheet: Leave a blank 4” x 4” space located 3” off the right sheet edge to allow for the title block. Other sheets: Leave a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block.) - See page 6 of Electronic Plan submittal standards.
Intake Approval  8/31/2018 FAIL
DetailsJoe Bruce
1) Missing form #502 application checklist.
Please fill out and upload "#502 – New Commercial/Commercial Additions Plan Intake Submittal Checklist" with all required items uploaded on EplanReview.
Application received  8/8/2018 DONE
Application submitted via PDS Online on Aug 8 2018 1:11PM