Third Notice | | 8/18/2019 | 9/16/2019 | | DONE |
|
|
|
Hold on company for final values
|
Third Notice | | 7/15/2019 | 8/13/2019 | | DONE |
|
|
|
mailed 8-13 with third and final follow up letter
|
Third Follow up | | | 8/13/2019 | | DONE |
|
|
|
|
Third Notice | | 6/12/2019 | 7/10/2019 | | DONE |
|
|
|
mailed 7-11 with second follow up
|
Second Follow up | | | 7/10/2019 | | DONE |
|
|
|
|
Third Notice | | 5/11/2019 | 6/7/2019 | | DONE |
|
|
|
mailed 6-10 with first follow up letter
|
First Follow up | | | 6/7/2019 | | DONE |
|
|
|
|
Third Notice | | 4/13/2019 | 5/6/2019 | | DONE |
|
|
|
mailed 5-10-19
|
Third Notice | | 3/16/2019 | 4/8/2019 | | DONE |
|
|
|
mailed 4-11-19
|
Second Notice | | 2/17/2019 | 3/11/2019 | | DONE |
|
|
|
mailed 3-12-19
|
First Notice | | 1/19/2019 | 2/7/2019 | | DONE |
|
|
|
mailed 2-11-19
|
Permanent Occupancy | | | 1/9/2019 | | DONE |
|
|
|
|
BLD-Final | 1/3/2019 | 1/4/2019 | 1/4/2019 | A | PASS |
Mike Jordan
|
|
|
Marvin Phone #: ###-####. Ok for perm occ.
|
BLD-Final | 12/24/2018 | 12/24/2018 | 12/24/2018 | A | CANC |
Jim Sly
|
|
|
Marvin 208 573 6361 Will call for final when Mike returns........
|
BLD-Final | 12/20/2018 | 12/21/2018 | 12/24/2018 | A | PEND |
Jim Sly
|
|
|
Marvin Phone #: ###-#### Re-scheduled for12/24/18........
|
BLD-Final | 12/12/2018 | 12/14/2018 | 12/14/2018 | P | PART |
Mike Jordan
|
|
|
Marvin Phone #: ###-####. OK for temp oc. Pending mech. and locking hardware at swinging door.
|
FIRE-Final Inspection | 12/12/2018 | 12/14/2018 | 12/14/2018 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
Marvin Phone #: ###-####
|
Temporary Occupancy | 12/14/2018 | 3/14/2019 | 12/14/2018 | | DONE |
Candy A. Nichols
|
|
|
|
BLD-Framing/Rough-in | 12/12/2018 | 12/13/2018 | 12/13/2018 | A | PASS |
Brandon Shaw
|
|
|
Ceiling grid
|
BLD-Framing/Rough-in | 12/5/2018 | 12/6/2018 | 12/6/2018 | A | PART |
Jim Sly
|
|
|
Marvin Phone #: ###-#### Hard lid.......OK
|
BLD-Framing/Rough-in | 11/26/2018 | 11/26/2018 | 11/27/2018 | P | PASS |
Mike Jordan
|
|
|
Marin Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/25/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/25/2018 | | DONE |
|
|
|
|
Plan assigned to (JG) | 9/6/2018 | 9/6/2018 | 10/23/2018 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 09/26 L3 Wetzel's Pretzels ePlan
|
Routing - PLAN CHECK | 10/17/2018 | | 10/23/2018 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/23/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/23/2018 | | DONE |
|
|
|
NEED (marvjennings@gmail.com)
GC- met
Rev cert of val-met
please final the early start BLD18-03812
|
Routing - MECHANICAL | 10/17/2018 | | 10/18/2018 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 10/9/2018 | 10/12/2018 | 10/11/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 9/6/2018 | 9/6/2018 | 10/3/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
1st review completed | | | 10/3/2018 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 9/6/2018 | | 9/26/2018 | | FAIL |
Javier Guzman
|
|
|
|
Routing - MECHANICAL | 9/6/2018 | | 9/10/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 9/6/2018 | | 9/6/2018 | | PASS |
Bill VanDegrift
|
|
|
See redline notes.
|
Routing - Addressing | 9/6/2018 | | 9/6/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 9/6/2018 | | 9/6/2018 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 9/5/2018 | | PASS |
|
|
|
|
Intake Approval | | | 8/23/2018 | | FAIL |
Javier Guzman
|
|
|
Provide and upload the following:
• Form 304 is required to be completely filled out, provide owner information and signature
• Provide Central District Health Department (CDHD) completed Food Establishment License application for any building where food is prepared, manufactured or stored. Form found at http://www.cdhd.idaho.gov/eh-food-forms.php
• Provide Central District Health Department (CDHD) completed Food Establishment Plan Review and Approval form for any building where food is prepared, manufactured or stored. Form found at http://www.cdhd.idaho.gov/eh-food-forms.php
• Provide new acoustic suspended ceiling details
• New mechanical work is being performed in a food service area and due to the smoke control system within the mall requires mechanical plans stamped and signed by an Idaho licensed engineer
• New plumbing work is being performed in a food service area and requires plumbing plans stamped and signed by an Idaho licensed engineer or provide an email from the plumbing plan review that states no engineered plumbing plans required (contact Ed Ediger ###-####)
|
Application received | | | 8/8/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 8 2018 2:05PM
|