BLD-Final | 1/22/2020 | 1/22/2020 | 1/22/2020 | P | DONE |
Tony Young
|
|
|
Justin Phone #: ###-####
|
DOC - Permit Finaled | 1/22/2020 | 1/22/2020 | 1/22/2020 | P | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 6/14/2019 | 6/14/2019 | 6/17/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 6/13/2019 | 6/13/2019 | 6/17/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Final | 3/28/2019 | 3/29/2019 | 3/29/2019 | A | NR |
Tony Young
|
|
|
Justin Phone #: ###-####,, needs hand rail,,guard rails per code,, gas line protection,, firewall sealed up
|
PubWorks Occupancy Approval | 3/27/2019 | 3/27/2019 | 3/27/2019 | | DONE |
Melissa Jannusch
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Conference | 3/21/2019 | 3/21/2019 | 3/21/2019 | P | PASS |
Tony Young
|
|
|
exterior step ?s,, landscape steps ok,, main access to home is the driveway
|
BLD-Energy code compliance | 1/29/2019 | 1/30/2019 | 1/30/2019 | A | PASS |
Tony Young
|
|
|
|
BLD-Energy code compliance | 1/28/2019 | 1/29/2019 | 1/29/2019 | A | FAIL |
Brandon Shaw
|
|
|
Need Fire Rough-in approved...
|
BLD-Energy code compliance | 1/28/2019 | 1/29/2019 | 1/29/2019 | A | CANC |
Brandon Shaw
|
|
|
Justion Phone #: ###-####
|
BLD-Energy code compliance | 1/28/2019 | 1/28/2019 | 1/28/2019 | P | NR |
Tony Young
|
|
|
Justion Phone #: ###-####,, c/n posted
|
BLD-Framing/Rough-in | 1/25/2019 | 1/25/2019 | 1/25/2019 | P | PART |
Tony Young
|
|
|
Justin Phone #: ###-####,, ok to insulate,, walked with the framer for corrections,, hangers, girder connections,, straps,, need full sprinkler pass prior to energy pass
|
BLD-Wall Bracing | 1/25/2019 | 1/25/2019 | 1/25/2019 | P | PASS |
Tony Young
|
|
|
Justin Phone #: ###-####
|
BLD-Wall Bracing | 1/24/2019 | 1/25/2019 | 1/25/2019 | A | CANC |
Jim Sly
|
|
|
Justin Phone #: ###-#### Canc. by Contr.
|
BLD-Framing/Rough-in | 1/24/2019 | 1/25/2019 | 1/25/2019 | A | CANC |
Jim Sly
|
|
|
Justin Phone #: ###-#### Canc. by Contr.
|
BLD-Wall Bracing | 1/24/2019 | 1/24/2019 | 1/24/2019 | P | CANC |
Tony Young
|
|
|
Justin Phone #: ###-####
|
BLD-Framing/Rough-in | 1/24/2019 | 1/24/2019 | 1/24/2019 | P | CANC |
Tony Young
|
|
|
Justin Phone #: ###-####
|
BLD-Wall Bracing | 1/8/2019 | 1/8/2019 | 1/8/2019 | P | NR |
Tony Young
|
|
|
shear // Justin Phone #: ###-####,, need portal frames
|
BLD-Footing | 10/11/2018 | 10/12/2018 | 10/12/2018 | A | PASS |
Tony Young
|
|
|
Seigo Phone #: ###-####
|
PubWorks Subgrade Approval | 10/12/2018 | 10/12/2018 | 10/12/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Fees Due Hold | 9/18/2018 | | 10/11/2018 | | DONE |
Tiffany Carson-Herker
|
|
|
|
(F) Reprint permit | | | 10/2/2018 | | DONE |
|
|
|
|
Issue & PRINT to be Invoiced | | | 9/17/2018 | | DONE |
|
|
|
Kristine came in to pay but the checks were over the amount that is due and take 2 weeks to be redone-Rita ok'd permits to be issued so footing/foundation inspections can be done. No other inspections can be done until the new checks have been recieved
|
Inspection Record Card- Bld | | | 9/17/2018 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 9/17/2018 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 9/17/2018 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 9/17/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 9/13/2018 | | |
|
|
|
|
Telephone call | | | 9/13/2018 | | DONE |
|
|
|
Called Kristine to inform her the permit is ready and what fees are due.
|
Case Summary (BLD) | | | 9/13/2018 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/13/2018 | | DONE |
Michael Hanson
|
|
|
|
Inspection Record Card- Bld | | | 9/13/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/13/2018 | | DONE |
|
|
|
met
|
Plan assigned to (M_H) | 8/10/2018 | | 9/13/2018 | | DONE |
Michael Hanson
|
|
|
08/28 sfd L2 Paper. 1st review completed - Energy, building planning, structural corrections required. MDH
|
Routing - PLAN CHECK | 8/29/2018 | | 9/13/2018 | | PASS |
Michael Hanson
|
|
|
|
Plan resubmittals received | | | 9/6/2018 | | DONE |
|
|
|
Received two copies of response, structural calcs and full size plan sheets 0.0, 1.0, A1.0, A1.1, A4.0, A4.1, E1.0, E1.1, S1.0, S1.1, S1.2, S1.3, S1.4, S3.0, S3.1, SD1.0, SD1.1, SD2.0, SD2.1, 1.0 Grading, 2.0 erosion; taken to Michael Hanson
|
Routing - FIRE | 8/30/2018 | 8/30/2018 | 8/30/2018 | | PASS |
Erika Akin
|
|
|
Attached revised comments to case
|
Routing - Erosion and Sediment | 8/29/2018 | | 8/30/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan with narrative and site map approved. Certified stormwater team designated. ESC Site Preparation Inspection is REQUIRED,
|
Routing - PLAN CHECK | | | 8/29/2018 | | FAIL |
Michael Hanson
|
|
|
See attached plan review document. MDH
|
1st review completed | | | 8/28/2018 | | FAIL |
Michael Hanson
|
|
|
Corrections required - Energy, building planning, structural. MDH
|
Routing - FIRE | | 8/10/2018 | 8/24/2018 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and plans
|
Routing - PUBLIC WORKS | 8/10/2018 | | 8/20/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - MECHANICAL | 8/20/2018 | | 8/20/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 8/20/2018 | | 8/20/2018 | | PASS |
Brent Moore
|
|
|
|
Routing PW Grading-Hillside | 8/10/2018 | | 8/17/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Route to Impact Fee Review | 8/10/2018 | 8/13/2018 | 8/13/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing PW Sewer Rating | 8/10/2018 | | 8/10/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Addressing | 8/10/2018 | | 8/10/2018 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/10/2018 | | DONE |
|
|
|
|
Intake Approval | | | 8/10/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/10/2018 | | DONE |
|
|
|
|
Intake Approval | | | 8/9/2018 | | FAIL |
|
|
|
NEED
CROSS SECTION
LIGHT SWITCHES FOR STAIRS
|
Application received | | 8/9/2018 | | | |
|
|
|
|