BLD-Final | 10/19/2018 | 10/25/2018 | 10/25/2018 | A | PASS |
Dave Hannah
|
|
|
Call Brad Hallman (Foreman) with any questions: ###-#### Phone #: ###-#### Inspection requested via web by Rob Maes
|
DOC - Permit Finaled | 10/25/2018 | 10/25/2018 | 10/25/2018 | P | PASS |
Dave Hannah
|
|
|
|
Zoning Approval | 10/24/2018 | 10/24/2018 | 10/24/2018 | | DONE |
Ted Vanegas
|
|
|
|
BLD-Final | 10/19/2018 | 10/23/2018 | 10/19/2018 | A | CANC |
Tony Young
|
|
|
Call Brad Hallman (Foreman) with any questions: ###-#### Phone #: ###-#### >> Inspection requested via web by Rob Maes Inspection cancelled from web by: Rob Maes
|
BLD-Framing/Rough-in | 10/16/2018 | 10/17/2018 | 10/17/2018 | A | PASS |
Dave Hannah
|
|
|
Call Foreman 30-60 min. prior to arrival: Brad Hallman Phone #: ###-#### Inspection requested via web by Rob Maes
|
Issue PAID IN FULL permit | | | 10/1/2018 | | DONE |
|
|
|
|
Routing - FIRE | 9/3/2018 | 9/3/2018 | 9/27/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Plan assigned to (JG) | 9/3/2018 | 9/3/2018 | 9/27/2018 | | PASS |
Javier Guzman
|
|
|
9/19 Hyde Parkins Solar Panels L-3, pend fire
|
1st review completed | | | 9/27/2018 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/27/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/27/2018 | | DONE |
|
|
|
Need GC FORM
|
Routing - PLAN CHECK | 9/3/2018 | | 9/19/2018 | | PASS |
Javier Guzman
|
|
|
|
Routing - ELECTRICAL | 9/3/2018 | | 9/19/2018 | | PASS |
Javier Guzman
|
|
|
|
Routing - Design Review | 9/3/2018 | | 9/5/2018 | | PASS |
Ted Vanegas
|
|
|
|
Intake Approval | | | 8/30/2018 | | PASS |
|
|
|
|
Intake Approval | | | 8/14/2018 | | FAIL |
Michael Hanson
|
|
|
This permit has failed prescreen due to the following:
1. Missing #520 Commercial Photovoltaic and Solar Thermal Systems submittal checklist completed and signed. - COMPLETED
2. Any additional information required during review of the checklist required above. - COMPLETED
3. Minimum sheet size for construction drawings is 18" x 24". SHEET MUST BE INDIVIDUALLY UPLOADED
4. Missing #304 form completed and signed. - COMPLETED
|
Intake Approval | | | 8/13/2018 | | FAIL |
Michael Hanson
|
|
|
This permit has failed prescreen due to the following:
1. Missing #520 Commercial Photovoltaic and Solar Thermal Systems submittal checklist completed and signed.
2. Any additional information required during review of the checklist required above.
3. Minimum sheet size for construction drawings is 18" x 24".
4. Missing #304 form completed and signed.
|
Application received | | | 8/10/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 10 2018 11:14AM
|