First Notice | | 1/21/2019 | 2/7/2019 | | DONE |
|
|
|
mailed 2-11-19
|
Permanent Occupancy | | | 1/11/2019 | | DONE |
|
|
|
|
BLD-Final | 1/7/2019 | 1/8/2019 | 1/8/2019 | A | PASS |
Mike Jordan
|
|
|
Eric Phone #: ###-####. Ok for perm occ.
|
FIRE-Final Inspection | 1/7/2019 | 1/7/2019 | 1/7/2019 | P | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarms, fire extinguishers are placed with current inspection tags, other address on building that is not 6434 to be removed before building final. Final life fire safety inspection for area of work complete.
Eric Phone #: ###-####
|
BLD-Final | 1/2/2019 | 1/7/2019 | 1/7/2019 | A | NR |
Mike Jordan
|
|
|
Eric Phone #: ###-####. Needs fire/life/safety final.
|
BLD-Framing/Rough-in | 12/6/2018 | 12/7/2018 | 12/7/2018 | P | PASS |
Mike Jordan
|
|
|
Eric Phone #: ###-####
|
Print Occupancy Form | | | 10/30/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/30/2018 | | DONE |
|
|
|
|
Plan assigned to (JG) | 10/16/2018 | 10/16/2018 | 10/19/2018 | | PASS |
Javier Guzman
|
|
|
10/22 L1 RED MOUNTAIN NATURAL MEDICINE ePlan**
|
Routing - PLAN CHECK | 10/16/2018 | | 10/19/2018 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 10/19/2018 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/19/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/19/2018 | | DONE |
|
|
|
AALIYAH@HELLMANNCONSTRUCTION.COM
all met
GC FORM (SIGNATURE)
MET
REVISED VALUE
|
Intake Approval | | | 10/16/2018 | | PASS |
Javier Guzman
|
|
|
|
Routing - Addressing | 10/16/2018 | | 10/16/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 10/16/2018 | | 10/16/2018 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 9/27/2018 | | FAIL |
Brian McGowan
|
|
|
Please provide the following:
1. Please provide the Building Data. I emailed you items from the previously mentioned Building Permits that need to be on the plans.
2. Please rename the resubmitted drawings exactly as originally named. This allows the plans to "version" over each other. I renamed and uploaded the last floor plan you resubmitted and will delete the 9/24 submittal once you upload the next version.
|
Intake Approval | | | 9/6/2018 | | FAIL |
Brian McGowan
|
|
|
Please provide the following:
1. Please provide the Code Analysis and Building Data. This information can be found by researching previous Building Permits through our Records Department by calling ###-####. You will need to request a copy. The cover sheets, Plan Review Report or actual Permit would contain the needed info. (new shell building permitted under BLD07-0155, Tenant Improvement under BLD08-00240).
2. Vicinity Map - This is similar to a Site Plan, which you provided, but on a larger view. It would show major streets and intersections for several blocks and have your project marked on the pdf.
3. Door hardware Schedule. Please specify the type of hardware to be installed (you can google 1010.1.9.1 of the 2015 IBC and see what to write on the drawings to show compliance).
You may need to hire an Architect if you cannot provide this information. I am limited in what I can do to help.
I rotated and uploaded the drawings as requested. I deleted the previous files as requested as well. I moved the Survey into the Document File since it was a small sheet. Please review the drawings to verify I acted correctly.
|
Intake Approval | | | 8/22/2018 | | FAIL |
Brian McGowan
|
|
|
Please provide the following:
1. Form 518 must be completed and uploaded with your submittal. This is the checklist for what is required.
2. All Drawings must be a minimum 18"x24".
3. Provide any additional drawings or documents as required.
|
Application received | | | 8/11/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 11 2018 11:53AM
|