Information based on query as of Sunday, June 23, 2024.
Permit Information
Permit NumberBLD18-02912
StatusFinaled
Name STEELBLUE PROS
Site Address 1982 S EAGLESON RD
Project NameEA1982
Customer Number 
ePlanReviewYes
Description
**PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 2575 sq. ft., two story (first story 2197 sq. ft., second story 378 sq. ft.) single family dwelling with 3 bedrooms, 2 bathrooms, approximately 367 sq. ft. of covered patio/porch and a 946 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. JJN
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/11/20205/12/20205/12/2020APASS
DetailsTell Riley
Garage code: 2583 - swapped smoke/co for wired model - step into front door is already width of door, increased the depth to 36” Phone #: ###-#### Inspection requested via web by Braden Holbrook//corrections made//
DOC - Permit Finaled5/12/20205/12/20205/12/2020PPASS
DetailsTell Riley
BLD-Blower Door Test Results5/12/20205/12/20205/12/2020PDONE
DetailsTell Riley
3.9 ACH 50
BLD-Final5/8/20205/11/20205/11/2020AFAIL
DetailsTell Riley
Garage code is 2583 Phone #: ###-#### Inspection requested via web by Braden Holbrook//front entry door (required egress) landing needs to be width of door and 36"//smoke CO combo in bonus room needs to be interconnected//
BLD-Final5/1/20205/1/20205/1/2020PFAIL
DetailsTell Riley
Garage code is 2583 to access house. Phone #: ###-#### Inspection requested via web by Braden Holbrook//CN posted, left on kitchen counter//
BLD-Energy code compliance1/15/20201/16/20201/16/2020APASS
DetailsTell Riley
Braydon Phone #: ###-####//corrections made//
BLD-Framing/Rough-in1/13/20201/14/20201/14/2020APASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Braden Holbrook//ok to insulate//still need to add truss bracing//
BLD-Conference1/8/20201/8/20201/8/2020PPASS
DetailsBrandon Shaw
Corrections SAT...
OK to insulate...
BLD-Framing/Rough-in1/3/20201/3/20201/3/2020PFAIL
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Braden Holbrook//CN posted onsite//
Plan Modification Accepted  12/23/2019 DONE
new hvac system
Routing - MECHANICAL12/23/2019 12/23/2019 PASS
DetailsTroy James
manual J plan mod
Telephone call  12/23/2019 DONE
could not assigned case in Eplan, Brittany will be assigning to Troy MEC
BLD-Wall Bracing11/14/201911/14/201911/14/2019PPASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Braden Holbrook//corrections made//
BLD-Wall Bracing11/7/201911/8/201911/8/2019APART
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Braden Holbrook//add nails to portal frame westside--add approved nails to sill plate//leave access to verify nails at framing//
BLD-Wall Bracing11/1/201911/1/201911/1/2019PCANC
DetailsTell Riley
Phone #: ###-#### >> Inspection requested via web by Braden Holbrook Inspection cancelled from web by: Braden Holbrook
BLD-Foundation7/2/20197/3/20197/3/2019APASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Braden Holbrook//pulled set backs from back pins ok per plans//sides ok per plans//foundation ok per plans//
BLD-Footing6/28/20196/28/20196/28/2019PPART
DetailsTell Riley
Plans should be in the restroom across from the property if you need them. Phone #: ###-#### Inspection requested via web by Braden Holbrook//setbacks verified//work in progress//
Issue PAID IN FULL permit  6/7/2019 DONE
email permits to-braden@steelbluepros.com
Inspection Record Card- Bld  6/7/2019 DONE
Telephone call  6/7/2019 DONE
ALL MET- email permits tobraden@steelbluepros.com waiting to release epaln
OVERRIDE  5/16/2019  
Plan assigned to (J_N)2/21/20192/21/20195/16/2019 DONE
DetailsJenny Nelson
03/01 sfd L1 ePlan. 4th review, failed fire. 3rd review failed fire and planning. 2nd review, failed fire and planning. 1st complete 2/22, waiting for fire review (flag lot). Spread footings, wall bracing calculations, wall bracing offsets, bracing end conditions, anchot bolts, attic access, crawl space pony wall access.
PLANS/APPL TAKEN TO FRONT DESK  5/16/2019 DONE
DetailsJenny Nelson
Permit Ready to Issue  5/16/2019 DONE
met
Routing - FIRE5/15/20195/15/20195/15/2019 PASS
DetailsLee G Meredith
Sprinklers are not required based on a site review from assistant fire marshal Ron Johnson.
Routing - PLANNING5/14/2019 5/14/2019 PASS
DetailsSue Cummings
Routing - PLANNING5/7/2019 5/7/2019 FAIL
DetailsSue Cummings
Driveway setback still not correct. See notes on site plan
Routing - FIRE4/25/20194/25/20194/26/2019 FAIL
DetailsLee G Meredith
05/08 1982 S Eagleson LM Resubmittal.

Previous comments not addressed. Still requires fire flow report from SUEZ and access distance still exceeds 150 feet. Resubmittal required.
Routing - PLAN CHECK4/26/2019 4/26/2019 PASS
DetailsJenny Nelson
Extend Review Timeline  3/15/2019 DONE
1st approved 180 day extension per adele. see documents
1st review completed  2/26/2019 DONE
DetailsJenny Nelson
Route to Impact Fee Review2/22/20192/25/20192/25/2019 PASS
DetailsKarina Myles
Initial residential review of new SFD permits requested for now.
Routing - FIRE2/22/20192/22/20192/25/2019 FAIL
DetailsLee G Meredith
Fire flow availability no provided. Fire aparatus distance exceeded. Emailed Braden Holbrook a copy of the review comments.
CHANGE STATUS TO (REV)  2/22/2019 DONE
Should not have been put in RDY status. still in review
Routing - PLAN CHECK2/21/2019 2/22/2019 FAIL
DetailsJenny Nelson
Routing - Addressing2/21/2019 2/22/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS2/21/2019 2/22/2019 PASS
DetailsMorgan Webb
OVERRIDE  2/21/2019  
Permit Ready to Issue  2/21/2019 DONE
Need GC
Need RV
Need ACHD
Routing - MECHANICAL2/21/2019 2/21/2019 PASS
DetailsTroy James
Routing - PLANNING2/21/2019 2/21/2019 FAIL
DetailsSue Cummings
The garage must be setback 20 ft, from edge of asphalt of driveway essement for shared driveways
Meeting  2/21/2019 DONE
sent in request for extension
Telephone call  2/21/2019 DONE
left a message for braden to see if this project is going to continue. informed him he can send in a request for an extension and would need to pay the intake fees to get the permit routing. Or if the project is no longer would need to send in written documentation to have the permit voided.
Intake Approval  2/21/2019 PASS
Plans ACCEPTED BY PLAN TECH  2/21/2019 DONE
Recd Pcfee & Taken To Pln CK  2/21/2019 DONE
Intake Approval  8/29/2018 FAIL
NEED
ANCHOR BOLTS
FULL HEIGHT OF HOME
DOCUMENTS IN CORRECT FOLDER
Intake Approval  8/29/2018 FAIL
MISSING
ANCHOR BOLTS
DOCUMENTS IN WRONG FOLDER
Application received  8/13/2018 DONE
Application submitted via PDS Online on Aug 13 2018 8:48AM
Routing - PLANNING4/25/2019    
Setback for garage is 20 ft. from the edge of a common driveway.11-07-03-C(8)