BLD-Final | 5/11/2020 | 5/12/2020 | 5/12/2020 | A | PASS |
Tell Riley
|
|
|
Garage code: 2583 - swapped smoke/co for wired model - step into front door is already width of door, increased the depth to 36” Phone #: ###-#### Inspection requested via web by Braden Holbrook//corrections made//
|
DOC - Permit Finaled | 5/12/2020 | 5/12/2020 | 5/12/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Blower Door Test Results | 5/12/2020 | 5/12/2020 | 5/12/2020 | P | DONE |
Tell Riley
|
|
|
3.9 ACH 50
|
BLD-Final | 5/8/2020 | 5/11/2020 | 5/11/2020 | A | FAIL |
Tell Riley
|
|
|
Garage code is 2583 Phone #: ###-#### Inspection requested via web by Braden Holbrook//front entry door (required egress) landing needs to be width of door and 36"//smoke CO combo in bonus room needs to be interconnected//
|
BLD-Final | 5/1/2020 | 5/1/2020 | 5/1/2020 | P | FAIL |
Tell Riley
|
|
|
Garage code is 2583 to access house. Phone #: ###-#### Inspection requested via web by Braden Holbrook//CN posted, left on kitchen counter//
|
BLD-Energy code compliance | 1/15/2020 | 1/16/2020 | 1/16/2020 | A | PASS |
Tell Riley
|
|
|
Braydon Phone #: ###-####//corrections made//
|
BLD-Framing/Rough-in | 1/13/2020 | 1/14/2020 | 1/14/2020 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Braden Holbrook//ok to insulate//still need to add truss bracing//
|
BLD-Conference | 1/8/2020 | 1/8/2020 | 1/8/2020 | P | PASS |
Brandon Shaw
|
|
|
Corrections SAT... OK to insulate...
|
BLD-Framing/Rough-in | 1/3/2020 | 1/3/2020 | 1/3/2020 | P | FAIL |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Braden Holbrook//CN posted onsite//
|
Plan Modification Accepted | | | 12/23/2019 | | DONE |
|
|
|
new hvac system
|
Routing - MECHANICAL | 12/23/2019 | | 12/23/2019 | | PASS |
Troy James
|
|
|
manual J plan mod
|
Telephone call | | | 12/23/2019 | | DONE |
|
|
|
could not assigned case in Eplan, Brittany will be assigning to Troy MEC
|
BLD-Wall Bracing | 11/14/2019 | 11/14/2019 | 11/14/2019 | P | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Braden Holbrook//corrections made//
|
BLD-Wall Bracing | 11/7/2019 | 11/8/2019 | 11/8/2019 | A | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Braden Holbrook//add nails to portal frame westside--add approved nails to sill plate//leave access to verify nails at framing//
|
BLD-Wall Bracing | 11/1/2019 | 11/1/2019 | 11/1/2019 | P | CANC |
Tell Riley
|
|
|
Phone #: ###-#### >> Inspection requested via web by Braden Holbrook Inspection cancelled from web by: Braden Holbrook
|
BLD-Foundation | 7/2/2019 | 7/3/2019 | 7/3/2019 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Braden Holbrook//pulled set backs from back pins ok per plans//sides ok per plans//foundation ok per plans//
|
BLD-Footing | 6/28/2019 | 6/28/2019 | 6/28/2019 | P | PART |
Tell Riley
|
|
|
Plans should be in the restroom across from the property if you need them. Phone #: ###-#### Inspection requested via web by Braden Holbrook//setbacks verified//work in progress//
|
Issue PAID IN FULL permit | | | 6/7/2019 | | DONE |
|
|
|
email permits to-braden@steelbluepros.com
|
Inspection Record Card- Bld | | | 6/7/2019 | | DONE |
|
|
|
|
Telephone call | | | 6/7/2019 | | DONE |
|
|
|
ALL MET- email permits tobraden@steelbluepros.com waiting to release epaln
|
OVERRIDE | | | 5/16/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 2/21/2019 | 2/21/2019 | 5/16/2019 | | DONE |
Jenny Nelson
|
|
|
03/01 sfd L1 ePlan. 4th review, failed fire. 3rd review failed fire and planning. 2nd review, failed fire and planning. 1st complete 2/22, waiting for fire review (flag lot). Spread footings, wall bracing calculations, wall bracing offsets, bracing end conditions, anchot bolts, attic access, crawl space pony wall access.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/16/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 5/16/2019 | | DONE |
|
|
|
met
|
Routing - FIRE | 5/15/2019 | 5/15/2019 | 5/15/2019 | | PASS |
Lee G Meredith
|
|
|
Sprinklers are not required based on a site review from assistant fire marshal Ron Johnson.
|
Routing - PLANNING | 5/14/2019 | | 5/14/2019 | | PASS |
Sue Cummings
|
|
|
|
Routing - PLANNING | 5/7/2019 | | 5/7/2019 | | FAIL |
Sue Cummings
|
|
|
Driveway setback still not correct. See notes on site plan
|
Routing - FIRE | 4/25/2019 | 4/25/2019 | 4/26/2019 | | FAIL |
Lee G Meredith
|
|
|
05/08 1982 S Eagleson LM Resubmittal.
Previous comments not addressed. Still requires fire flow report from SUEZ and access distance still exceeds 150 feet. Resubmittal required.
|
Routing - PLAN CHECK | 4/26/2019 | | 4/26/2019 | | PASS |
Jenny Nelson
|
|
|
|
Extend Review Timeline | | | 3/15/2019 | | DONE |
|
|
|
1st approved 180 day extension per adele. see documents
|
1st review completed | | | 2/26/2019 | | DONE |
Jenny Nelson
|
|
|
|
Route to Impact Fee Review | 2/22/2019 | 2/25/2019 | 2/25/2019 | | PASS |
Karina Myles
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 2/22/2019 | 2/22/2019 | 2/25/2019 | | FAIL |
Lee G Meredith
|
|
|
Fire flow availability no provided. Fire aparatus distance exceeded. Emailed Braden Holbrook a copy of the review comments.
|
CHANGE STATUS TO (REV) | | | 2/22/2019 | | DONE |
|
|
|
Should not have been put in RDY status. still in review
|
Routing - PLAN CHECK | 2/21/2019 | | 2/22/2019 | | FAIL |
Jenny Nelson
|
|
|
|
Routing - Addressing | 2/21/2019 | | 2/22/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 2/21/2019 | | 2/22/2019 | | PASS |
Morgan Webb
|
|
|
|
OVERRIDE | | | 2/21/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 2/21/2019 | | DONE |
|
|
|
Need GC
Need RV
Need ACHD
|
Routing - MECHANICAL | 2/21/2019 | | 2/21/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 2/21/2019 | | 2/21/2019 | | FAIL |
Sue Cummings
|
|
|
The garage must be setback 20 ft, from edge of asphalt of driveway essement for shared driveways
|
Meeting | | | 2/21/2019 | | DONE |
|
|
|
sent in request for extension
|
Telephone call | | | 2/21/2019 | | DONE |
|
|
|
left a message for braden to see if this project is going to continue. informed him he can send in a request for an extension and would need to pay the intake fees to get the permit routing. Or if the project is no longer would need to send in written documentation to have the permit voided.
|
Intake Approval | | | 2/21/2019 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/21/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/21/2019 | | DONE |
|
|
|
|
Intake Approval | | | 8/29/2018 | | FAIL |
|
|
|
NEED
ANCHOR BOLTS
FULL HEIGHT OF HOME
DOCUMENTS IN CORRECT FOLDER
|
Intake Approval | | | 8/29/2018 | | FAIL |
|
|
|
MISSING
ANCHOR BOLTS
DOCUMENTS IN WRONG FOLDER
|
Application received | | | 8/13/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 13 2018 8:48AM
|
Routing - PLANNING | 4/25/2019 | | | | |
|
|
|
Setback for garage is 20 ft. from the edge of a common driveway.11-07-03-C(8)
|