BLD-Final | 6/12/2019 | 6/13/2019 | 6/13/2019 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by anthony boyd. All isues have been resolved.
|
DOC - Permit Finaled | 6/13/2019 | 6/13/2019 | 6/13/2019 | P | PASS |
Mike Jordan
|
|
|
|
Elevation Cert Rec'd-Final | | | 3/8/2019 | | DONE |
|
|
|
Received revised Elevation Certificate #3 and approved permit for final occupancy. Jason Taylor ###-####.
|
BLD-Final | 2/21/2019 | 2/21/2019 | 2/21/2019 | P | FAIL |
Mike Jordan
|
|
|
Plans are in shop in front of electrical panel. Call for code to get into shop. Phone #: ###-#### Inspection requested via web by anthony boyd. Needs mech. final inspections and provide landings on exteior side of man doors. Also submit final elevation cert. to public works.
|
Routing Walk-In (BLD) | 11/7/2018 | 11/7/2018 | 11/7/2018 | A | FAIL |
Michael Hanson
|
|
|
Applicant wanted to change the 3 foot buffer met with Colleen and was advised that a variance would be required. Applicant decided not to go forward with variance.
|
BLD-Framing/Rough-in | 10/19/2018 | 10/22/2018 | 10/22/2018 | A | PART |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by anthony boyd. Ok to insulate pending mech. rough in inspection.
|
BLD-Framing/Rough-in | 10/19/2018 | 10/19/2018 | 10/19/2018 | P | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by anthony boyd Inspection cancelled from web by: anthony boyd
|
BLD-Wall Bracing | 10/15/2018 | 10/15/2018 | 10/15/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by anthony boyd
|
Elevation Cert Rec'd-Midconst | | | 10/15/2018 | | DONE |
|
|
|
|
BLD-Wall Bracing | 10/9/2018 | 10/10/2018 | 10/10/2018 | P | NR |
Mike Jordan
|
|
|
Inspection requested via web by anthony boyd. Needs to submit elevation cert. to public works.
|
BLD-Wall Bracing | 10/8/2018 | 10/9/2018 | 10/9/2018 | P | CANC |
Mike Jordan
|
|
|
Plans under home depot bucket in shop being inspected Phone #: ###-#### >> Inspection requested via web by anthony boyd Inspection cancelled from web by: anthony boyd
|
BLD-Wall Bracing | 10/8/2018 | 10/9/2018 | 10/8/2018 | A | CANC |
Mike Jordan
|
|
|
Plans are under a home depot bucket in the shop you are inspecting Phone #: ###-#### >> Inspection requested via web by anthony boyd Inspection cancelled from web by: anthony boyd
|
BLD-Foundation | 8/21/2018 | 8/22/2018 | 8/22/2018 | P | PART |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
BLD-Foundation | 8/20/2018 | 8/21/2018 | 8/21/2018 | P | PEND |
Brandon Shaw
|
|
|
Work in progress
*SEE NOTE ON FLOODPLAIN*
|
BLD-Footing | 8/17/2018 | 8/20/2018 | 8/20/2018 | P | PASS |
Jim Sly
|
|
|
Dane Phone #: ###-#### SEE NOTE ON FLOODPLAIN
|
OVERRIDE | | | 8/16/2018 | | |
|
|
|
|
Routing Walk-In (BLD) | 8/16/2018 | 8/16/2018 | 8/16/2018 | A | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 8/13/2018 | 8/13/2018 | 8/16/2018 | | PASS |
Josh Bogle
|
|
|
08/17 paper plan - L2 detached shop, routed to floodplain - 1st done
|
Routing - PLAN CHECK | 8/16/2018 | | 8/16/2018 | | FAIL |
Josh Bogle
|
|
|
no enineering calcs - foundation section doesn't match elevation cert.
|
Routing - PLAN CHECK | 8/16/2018 | | 8/16/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 8/16/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 8/16/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/16/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 8/16/2018 | | DONE |
|
|
|
|
Routing PW Flood Plain | 8/15/2018 | | 8/16/2018 | | PASS |
Jason C. Taylor
|
|
|
Two Elevation Certificates will be required; one prior to any vertical construction, and one based upon finished construction. These certificates will need to be reviewed and approved by Public Works staff prior to framing/occupancy approval. Jason Taylor ###-####
|
Routing - PUBLIC WORKS | 8/16/2018 | | 8/16/2018 | | PASS |
Morgan Webb
|
|
|
|
1st review completed | | | 8/16/2018 | | FAIL |
Josh Bogle
|
|
|
|
Issue PAID IN FULL permit | | | 8/16/2018 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 8/15/2018 | 8/15/2018 | 8/15/2018 | A | PASS |
Josh Bogle
|
|
|
applicant added info to plans - routed back to Floodplain
|
Routing PW Flood Plain | 8/13/2018 | | 8/14/2018 | | FAIL |
Melissa Jannusch
|
|
|
Plans need to have elevation of finish floor placed on foundation plans and cross section plans so Elevation Certificate and plans match. Revise and resubmit plans. Jason Taylor ###-####
|
Routing - PUBLIC WORKS | | | 8/14/2018 | | FAIL |
Rachael Beierle
|
|
|
floodplain
|
Routing Walk-In (Zoning) | 8/13/2018 | 8/13/2018 | 8/13/2018 | A | PASS |
Celine Acord
|
|
|
|
Routing Walk-In (BLD) | 8/13/2018 | 8/13/2018 | 8/13/2018 | A | PASS |
Josh Bogle
|
|
|
took in as level 2
|
Plans ACCEPTED BY PLAN TECH | | | 8/13/2018 | | DONE |
|
|
|
|
Intake Approval | | | 8/13/2018 | | PASS |
|
|
|
|
Routing - Addressing | 8/13/2018 | | 8/13/2018 | | PASS |
Doug Chausow
|
|
|
|
BLD-Final | 3/5/2019 | 3/6/2019 | | A | |
Mike Jordan
|
|
|
please call for garage code Phone #: ###-#### >> Inspection requested via web by anthony boyd
|
Application received | | 8/13/2018 | | | |
|
|
|
|