BLD-Final | 12/10/2018 | 12/10/2018 | 12/10/2018 | P | PASS |
Jim Sly
|
|
|
Call 20 mins ahead- Larry Phone #: ###-####
|
DOC - Permit Finaled | 12/10/2018 | 12/10/2018 | 12/10/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 10/3/2018 | 10/3/2018 | 10/3/2018 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by larry mcgouran
|
BLD-Wall Bracing | 9/14/2018 | 9/17/2018 | 9/17/2018 | A | PASS |
Jim Sly
|
|
|
Larry Phone #: ###-####
|
BLD-Footing | 8/24/2018 | 8/27/2018 | 8/27/2018 | P | PASS |
Jim Sly
|
|
|
Larry Phone #: ###-#### Footing And Wall........OK
|
BLD-Footing | 8/22/2018 | 8/22/2018 | 8/22/2018 | P | PART |
Jim Sly
|
|
|
Larry Phone #: ###-#### Pour at own risk. Property lines not pulled. location of garage is approx. 10 feet from East property line.....in lieu of 15 feet as shown on approved plan. may not make any difference if Min setback is 5 Ft from side property line. plans do not show Min. setback requirements.
|
PubWorks Subgrade Approval | 8/22/2018 | 8/22/2018 | 8/22/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Routing Walk-In (Zoning) | 8/16/2018 | 8/16/2018 | 8/16/2018 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (PW Hillside) | 8/16/2018 | 8/16/2018 | 8/16/2018 | P | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Routing Walk-In (BLD) | 8/16/2018 | 8/16/2018 | 8/16/2018 | P | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 8/16/2018 | | 8/16/2018 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/16/2018 | | DONE |
Brian McGowan
|
|
|
Minimal time to check for signatures on Site Plan. No additional fee.
|
Case Summary (BLD) | | | 8/16/2018 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 8/16/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 8/16/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/16/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 8/16/2018 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 8/13/2018 | 8/13/2018 | 8/13/2018 | P | DONE |
Rob Patrick
|
|
|
|
Routing Walk-In (Zoning) | 8/13/2018 | 8/13/2018 | 8/13/2018 | A | DONE |
Jeff Lowe
|
|
|
|
Plan assigned to (JAB) Josh | 8/13/2018 | 8/13/2018 | 8/13/2018 | | PASS |
Josh Bogle
|
|
|
|
Routing - PLANNING | 8/13/2018 | | 8/13/2018 | | PASS |
Jeff Lowe
|
|
|
per CUP18-00033
|
Routing PW Grading-Hillside | | | 8/13/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Routing - PLAN CHECK | 8/13/2018 | | 8/13/2018 | | PASS |
Rob Patrick
|
|
|
|
1st review completed | | | 8/13/2018 | | DONE |
Rob Patrick
|
|
|
|
Inspection Record Card- Bld | | | 8/13/2018 | | DONE |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 8/13/2018 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/13/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 8/13/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/13/2018 | | DONE |
|
|
|
|
Application received | | 8/13/2018 | | | |
|
|
|
|