Third Notice | | 11/3/2019 | 11/26/2019 | | DONE |
|
|
|
mailed 12-2-19
|
Second Notice | | 9/30/2019 | 10/29/2019 | | DONE |
|
|
|
mailed 11-1
|
First Notice | | 8/26/2019 | 9/20/2019 | | DONE |
|
|
|
mailed 9-23-19
|
Telephone call | | | 8/16/2019 | | DONE |
|
|
|
emailed perm c of o to scottydm3@hotmail.com
|
Permanent Occupancy | | | 8/16/2019 | | DONE |
|
|
|
|
BLD-Final | 8/9/2019 | 8/9/2019 | 8/9/2019 | P | PASS |
Tell Riley
|
|
|
Scott Phone #: ###-####//landing at bottom of ramp is now installed and is 5x5// final is complete//
|
Temporary Occupancy | 7/5/2019 | 10/3/2019 | 7/5/2019 | | DONE |
Candy A. Nichols
|
|
|
as per Jason Blais-ext req granted from 6/24/19 for 90 days
|
BLD-Conference | 7/2/2019 | 7/2/2019 | 7/2/2019 | P | DONE |
Tell Riley
|
|
|
Scott Phone #: ###-####//discussed 5x5 landing//will be geting it fixed//
|
Telephone call | | | 7/2/2019 | | DONE |
|
|
|
called Scott again about temp c of o being expired-he said he emailed Jason Blais but is calling in the final today or tomorrow
|
Telephone call | | | 6/21/2019 | | DONE |
|
|
|
called Scott about the temp c of o that's about to expire-he will email Jason Blais for an extension
|
BLD-Conference | 5/17/2019 | 5/24/2019 | 5/24/2019 | A | DONE |
Jim Sly
|
|
|
Scott Phone #: ###-####
|
Temporary Occupancy | 3/26/2019 | 6/24/2019 | 3/26/2019 | | DONE |
Candy A. Nichols
|
|
|
Jason Blais ok'd 90 day extension good from 3-24-19
|
Telephone call | | | 3/20/2019 | | DONE |
|
|
|
called Scott to let know temp c of o is about to expire-he will email Jason Blais
|
BLD-Conference | 2/21/2019 | 2/21/2019 | 2/21/2019 | P | DONE |
Jim Sly
|
|
|
|
BLD-Aging Inspection | 2/20/2019 | 2/20/2019 | 2/21/2019 | | CANC |
Jim Sly
|
|
|
|
BLD-Final | 12/19/2018 | 12/24/2018 | 12/24/2018 | P | PART |
Jim Sly
|
|
|
Scott Phone #: ###-#### OK for Temp Occ. OK for Perm Occ. when Code complying Landing installed at bottom of ADA ramp.
|
FIRE-Final Inspection | 12/21/2018 | 12/24/2018 | 12/24/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
Scott Phone #: ###-####
|
Temporary Occupancy | 12/24/2018 | 3/24/2019 | 12/24/2018 | | DONE |
Brittany Hill
|
|
|
|
FIRE-Final Inspection | 12/19/2018 | 12/20/2018 | 12/20/2018 | A | FAIL |
Mike Jordan
|
|
|
Scott Phone #: ###-####. Provide address, provide the missing exit sign at west door and provide ADA hardware at restroom.
|
PubWorks Occupancy Approval | 12/20/2018 | 12/20/2018 | 12/20/2018 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 12/12/2018 | 12/13/2018 | 12/13/2018 | A | FAIL |
Jim Page
|
|
|
City approved drawings and small documents were not onsite, need city approved drawings to perform official life fire safety inspection. Performed courtesy inspection with non-stamped drawings on site, need to add emergency egress lighting per plans, install exit sign on west door as shown on drawings. Restroom door hardware on southside will not operate when locked, need to install code compliant door hardware. Round type door hardware needs to be changed to lever type door hardware. Thumbturn deadbolt on west exterior door needs to be removed and code compliant hardware needs to be installed.
Scott Phone #: ###-####
|
BLD-Final | 12/6/2018 | 12/12/2018 | 12/12/2018 | P | NR |
Jim Sly
|
|
|
Scott Phone #: ###-#### Need Fire/Life and Public Works. Alarm signed off on alarm permit.
|
BLD-Conference | 11/29/2018 | 11/30/2018 | 11/30/2018 | P | DONE |
Brandon Shaw
|
|
|
Scott Phone #: ###-####
|
FIRE-Final Inspection | 11/28/2018 | 11/29/2018 | 11/29/2018 | P | CANC |
Troy Cobbley
|
|
|
Owner was not ready for a final yet. The project related fire alarm permit has not been scheduled for an inspection either.
call half hour before// Scott Phone #: ###-####
|
Print Occupancy Form | | | 11/21/2018 | | DONE |
|
|
|
|
BLD-Other | 10/3/2018 | 10/3/2018 | 10/3/2018 | P | PASS |
Jim Sly
|
|
|
block and tie- Scott Phone #: ###-####
|
BLD-Foundation | 10/2/2018 | 10/2/2018 | 10/2/2018 | P | FAIL |
Jim Sly
|
|
|
Call to meet // Scott Phone #: ###-#### Block and tie C/N cross type anchor can only be used in solid rock.
|
OVERRIDE | | | 9/18/2018 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/18/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/18/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/18/2018 | | DONE |
|
|
|
ALL MET
|
Plan assigned to (JHB) | 8/17/2018 | 8/17/2018 | 9/17/2018 | | PASS |
Joe Bruce
|
|
|
(1st Rev Comp) - 09/06 (L2) - Puentes Pre-School
|
Routing - PLANNING | 9/17/2018 | | 9/17/2018 | | PASS |
David Moser
|
|
|
|
Routing - PLAN CHECK | 9/17/2018 | | 9/17/2018 | | PASS |
Julie Romig
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/17/2018 | | DONE |
|
|
|
|
Route to Impact Fee Review | 9/6/2018 | 9/9/2018 | 9/7/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 8/17/2018 | | 9/6/2018 | | FAIL |
Joe Bruce
|
|
|
|
1st review completed | | | 9/6/2018 | | FAIL |
Joe Bruce
|
|
|
|
Routing - FIRE | 8/21/2018 | 8/21/2018 | 9/5/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing PW Drainage | 8/22/2018 | | 8/30/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Solid Waste | 8/22/2018 | | 8/22/2018 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Sewer Design | 8/22/2018 | | 8/22/2018 | | PASS |
DeAnn Brown
|
|
|
|
Routing PW Street Lights | 8/22/2018 | | 8/22/2018 | | PASS |
Tom Marshall
|
|
|
|
Routing - Design Review | 8/21/2018 | | 8/22/2018 | | PASS |
Katelyn Menuge
|
|
|
DRH18-00262 Okay pending Idaho Power approval.
|
Routing - PLANNING | 8/21/2018 | | 8/22/2018 | | FAIL |
David Moser
|
|
|
CUP18-00005 - Need a letter from Idaho Power due to their underground power line which is next to the building.
|
Routing - Addressing | 8/21/2018 | | 8/22/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/21/2018 | | 8/22/2018 | | PASS |
Rachael Beierle
|
|
|
CONTACT MIKE SHEPPARD FOR SERVICE INFO
|
Routing - Erosion and Sediment | 8/21/2018 | | 8/21/2018 | | PASS |
Michael Zawacki
|
|
|
RP needed prior to ground disturbances.
|
Plans ACCEPTED BY PLAN TECH | | | 8/21/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/21/2018 | | DONE |
|
|
|
|
Intake Approval | | | 8/17/2018 | | PASS |
|
|
|
|
Application received | | | 8/13/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 13 2018 2:22PM
|