BLD-Final | 3/8/2019 | 3/8/2019 | 3/9/2019 | P | PASS |
Jim Sly
|
|
|
Les Phone #: ###-####
|
DOC - Permit Finaled | 3/9/2019 | 3/9/2019 | 3/9/2019 | P | PASS |
Jim Sly
|
|
|
|
PubWorks Occupancy Approval | 1/9/2019 | 1/9/2019 | 1/9/2019 | | DONE |
Melissa Jannusch
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Energy code compliance | 12/13/2018 | 12/13/2018 | 12/13/2018 | P | PASS |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
BLD-Framing/Rough-in | 12/10/2018 | 12/11/2018 | 12/11/2018 | A | PART |
Brandon Shaw
|
|
|
Per plans- (2) 2x8 header needed at suite/bathroom pocket door... Per plans- HDU5 (2) at interior shear not installed... Missing nut and washer at hold down, right side of tall wall... See red paint... OK to insulate...
|
BLD-Energy code compliance | 12/10/2018 | 12/11/2018 | 12/11/2018 | A | PART |
Brandon Shaw
|
|
|
Air/foam seal
|
BLD-Framing/Rough-in | 12/3/2018 | 12/4/2018 | 12/4/2018 | A | PASS |
Brandon Shaw
|
|
|
Soffits...
|
OVERRIDE | | | 11/30/2018 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/30/2018 | | DONE |
|
|
|
plan mod
|
Routing PW Grading-Hillside | 11/28/2018 | | 11/30/2018 | | PASS |
Melissa Jannusch
|
|
|
Plan modification approved.
|
Permit Ready to Issue | | | 11/30/2018 | | DONE |
|
|
|
PLAN MOD
|
Plan assigned to (M_H) | 11/27/2018 | | 11/30/2018 | | DONE |
Michael Hanson
|
|
|
11/28 #404 plan mod ePlan
|
Routing - PLAN CHECK | 11/27/2018 | | 11/30/2018 | | PASS |
Michael Hanson
|
|
|
|
Routing - PUBLIC WORKS | 11/27/2018 | | 11/30/2018 | | PASS |
Angela Hardy
|
|
|
|
Routing - PLANNING | 11/27/2018 | | 11/27/2018 | | PASS |
Sue Cummings
|
|
|
Make sure the driveway does not exceed 33 ft. in width in the front setback, please.
|
Plan Modification Accepted | | | 11/27/2018 | | DONE |
|
|
|
plan mod accepted in e plan-changing the site plan, grading and draingage plan, sheets A0.1, grading & drainagepln L1.1
|
BLD-Wall Bracing | 11/14/2018 | 11/14/2018 | 11/14/2018 | P | PART |
Brandon Shaw
|
|
|
Work in progress... Garage PHF hold downs in place... Tall wall and interior hold downs to be in place by framing rough-in...
|
BLD-Foundation | 9/28/2018 | 9/28/2018 | 9/28/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 9/26/2018 | 9/26/2018 | 9/26/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
PubWorks Subgrade Approval | 9/25/2018 | 9/25/2018 | 9/25/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 9/10/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/10/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 9/7/2018 | | |
|
|
|
|
Routing - FIRE | 9/7/2018 | 9/7/2018 | 9/7/2018 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/7/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 9/7/2018 | | DONE |
|
|
|
|
Plan assigned to (M_H) | 8/16/2018 | | 9/7/2018 | | DONE |
Michael Hanson
|
|
|
09/04 #402 L2 ePlan. 1st review completed - Fire corrections required. MDH
|
Routing - PLAN CHECK | 8/16/2018 | | 9/4/2018 | | PASS |
Michael Hanson
|
|
|
|
1st review completed | | | 9/4/2018 | | PASS |
Michael Hanson
|
|
|
|
Routing PW Grading-Hillside | 8/16/2018 | | 8/20/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Route to Impact Fee Review | 8/16/2018 | 8/19/2018 | 8/17/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 8/16/2018 | 8/16/2018 | 8/17/2018 | | FAIL |
Tim Frost
|
|
|
New SFH
See attached review
|
Routing - MECHANICAL | 8/16/2018 | | 8/17/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 8/16/2018 | | 8/17/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 8/16/2018 | | 8/16/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/16/2018 | | 8/16/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 8/16/2018 | | 8/16/2018 | | PASS |
Michael Zawacki
|
|
|
Foothills home. Site prep inspection required.
|
Plans ACCEPTED BY PLAN TECH | | | 8/16/2018 | | DONE |
|
|
|
|
Intake Approval | | | 8/16/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/16/2018 | | DONE |
|
|
|
|
Application received | | | 8/13/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 13 2018 3:55PM
|