BLD-Conference | 9/25/2019 | 9/26/2019 | 9/26/2019 | A | FAIL |
Tell Riley
|
|
|
Eric Phone #: ###-####//need to add smoke and carbon monoxide detectors to all bedrooms and outside all bedrooms--including bedrooms upstairs//called permit holder and message box is full//
|
BLD-Energy code compliance | 10/30/2018 | 10/30/2018 | 10/30/2018 | P | PASS |
Jim Sly
|
|
|
Eric Phone #: ###-####
|
BLD-Framing/Rough-in | 10/25/2018 | 10/25/2018 | 10/25/2018 | P | PASS |
Jim Sly
|
|
|
Eric Phone #: ###-####
|
BLD-Wall Bracing | 10/8/2018 | 10/8/2018 | 10/8/2018 | P | PASS |
Brandon Shaw
|
|
|
Eric Phone #: ###-####
|
BLD-Foundation | 9/10/2018 | 9/10/2018 | 9/10/2018 | P | PASS |
Jim Sly
|
|
|
steam wall // Eric Phone #: ###-####
|
BLD-Footing | 8/31/2018 | 8/31/2018 | 8/31/2018 | P | PASS |
Brandon Shaw
|
|
|
Eric Phone #: ###-####
|
OVERRIDE | | | 8/14/2018 | | |
|
|
|
|
Routing Walk-In (Zoning) | 8/14/2018 | 8/14/2018 | 8/14/2018 | A | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 8/14/2018 | 8/14/2018 | 8/14/2018 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 8/14/2018 | | 8/14/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 8/14/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 8/14/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 8/14/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/14/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 8/14/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/14/2018 | | DONE |
|
|
|
|
Application received | | 8/14/2018 | | | |
|
|
|
|