BLD-Final | 9/4/2018 | 9/5/2018 | 9/5/2018 | A | PASS |
Mike Jordan
|
|
|
Clarisse Phone #: ###-####
|
DOC - Permit Finaled | 9/5/2018 | 9/5/2018 | 9/5/2018 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 8/23/2018 | 8/24/2018 | 8/24/2018 | P | FAIL |
Mike Jordan
|
|
|
Call ahead for access - Randy Phone #: ###-####. Provide code compliant handrail and 20 min door.
|
Route to Impact Fee Review | 8/23/2018 | 8/26/2018 | 8/24/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Route to Impact Fee Review | 8/23/2018 | 8/28/2018 | 8/23/2018 | | PASS |
Eric Bilimoria
|
|
|
|
Routing Walk-In (BLD) | 8/23/2018 | 8/23/2018 | 8/23/2018 | A | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 8/14/2018 | 8/14/2018 | 8/23/2018 | | PASS |
Josh Bogle
|
|
|
08/20 ADU (already built), paper - 1st done
|
Routing - PLAN CHECK | 8/23/2018 | | 8/23/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 8/23/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 8/23/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/23/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 8/23/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/23/2018 | | DONE |
|
|
|
|
Routing - PLANNING | 8/22/2018 | | 8/22/2018 | | PASS |
Jeff Lowe
|
|
|
appeal period over. plans approved.
|
Plan Reviewer's activity | | | 8/22/2018 | | FAIL |
Josh Bogle
|
|
|
replied to applicant e-mail
|
1st review completed | | | 8/17/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | | | 8/17/2018 | | FAIL |
Josh Bogle
|
|
|
missing details
|
Routing - MECHANICAL | 8/14/2018 | | 8/15/2018 | | PASS |
Troy James
|
|
|
Mechanical inspector to verify system meets code and installation is safe to the occupant. Manual j not required. Existing system is 1.5 ton cooling.
|
Routing - PLANNING | 8/14/2018 | | 8/14/2018 | | FAIL |
Nicolette Womack
|
|
|
Fail until August 20, 2018, when appeal period ends. Plans approved.
|
Routing - Addressing | 8/14/2018 | | 8/14/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/14/2018 | | 8/14/2018 | | PASS |
Rachael Beierle
|
|
|
SWR18-00850 SEWER PERMIT PAYED AND ISSUED 08-03-2018
|
Plans ACCEPTED BY PLAN TECH | | | 8/14/2018 | | DONE |
|
|
|
|
Intake Approval | | | 8/14/2018 | | PASS |
|
|
|
|
Override - Parcel Holds | | | 8/14/2018 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/14/2018 | | DONE |
|
|
|
|
Application received | | 8/14/2018 | | | |
|
|
|
|