BLD-Final | 9/27/2018 | 9/28/2018 | 9/28/2018 | P | PASS |
Dave Hannah
|
|
|
30 mins Garrett Phone #: ###-####
|
FIRE-Final Inspection | 9/27/2018 | 9/28/2018 | 9/28/2018 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, no fire alarm modifications, fire extinguishers are in common areas with current inspection tags. Final life fire safety inspection for area of work complete.
30 mins Garrett Phone #: ###-####
|
Inspection Record Card- Bld | | | 9/4/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/4/2018 | | DONE |
|
|
|
|
Plan assigned to (JHB) | 8/23/2018 | 8/23/2018 | 8/29/2018 | | PASS |
Joe Bruce
|
|
|
08/29 L1 Persi ePlan
|
Routing - PLAN CHECK | 8/23/2018 | | 8/29/2018 | | PASS |
Joe Bruce
|
|
|
|
1st review completed | | | 8/29/2018 | | DONE |
Joe Bruce
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/29/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/29/2018 | | DONE |
|
|
|
NEED
GC FORM
REVISED VALUE
|
Routing - Addressing | 8/23/2018 | | 8/23/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/23/2018 | | 8/23/2018 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 8/23/2018 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 8/16/2018 | | FAIL |
Brian McGowan
|
|
|
Please provide the following information:
1. A completed Form #304
2. Stamped and signed Plan Sheet/Sheets.
3. Provide all of the required Code Analysis information.
4. Ceiling notes.
5. Lighting plan and fixture schedule. (Show anything being modified or relocated)
6. Mechanical Plan. (Show anything being modified or relocated)
|
Application received | | | 8/14/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 14 2018 1:08PM
|