BLD-Final | 4/8/2019 | 4/8/2019 | 4/8/2019 | A | PASS |
Brandon Shaw
|
|
|
|
DOC - Permit Finaled | 4/8/2019 | 4/8/2019 | 4/8/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 3/28/2019 | 3/29/2019 | 3/29/2019 | P | PEND |
Brandon Shaw
|
|
|
Install smoke alarms per R314.3 and interconnected per R314.4... Install Carbon monoxide per R315.3...
|
BLD-Energy code compliance | 11/15/2018 | 11/16/2018 | 11/16/2018 | A | PASS |
Jim Storey
|
|
|
Eric Phone #: ###-####
|
BLD-Framing/Rough-in | 11/8/2018 | 11/9/2018 | 11/9/2018 | A | PASS |
Jim Storey
|
|
|
Eric Phone #: ###-####
|
BLD-Framing/Rough-in | 10/25/2018 | 10/26/2018 | 10/26/2018 | P | PASS |
Jim Storey
|
|
|
Eric Phone #: ###-#### Frame and foam seal
|
BLD-Conference | 9/26/2018 | 9/26/2018 | 9/27/2018 | P | PASS |
Jim Storey
|
|
|
call 15 mins ahead-Richard Phone #: ###-####
|
Routing Walk-In (BLD) | 8/14/2018 | 8/14/2018 | 8/14/2018 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 8/14/2018 | | 8/14/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 8/14/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 8/14/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 8/14/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/14/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 8/14/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/14/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 8/14/2018 | | DONE |
|
|
|
|
Application received | | 8/14/2018 | | | |
|
|
|
|