Permit Information
Permit NumberBLD18-02948
StatusFinaled
Name ST LUKES HEALTH SYSTEM LTD
Site Address 190 E BANNOCK ST
Project NameSt. Lukes Bi-Plane Imaging Rm
Customer Number 
ePlanReviewYes
Description
(ST. LUKE’S – BI-PLANE IMAGING AREA – GROUND STORY [BELOW 1ST STORY] – NEAR CENTER OF BUILDING) The fire sprinkler system is used for high rise and for occupancy. To convert an existing 1,765 area used for the Men’s and Women’s locker room and part of the corridor into a Bi-plane imaging room with ancillary spaces and equipment. Work to include: demolition of existing interior non-bearing walls and removing a portion of the concrete floor slab; new interior nonbearing walls; new rated interior walls for care suite; new concrete floor slab with ramps to existing floor; new imaging equipment and related work; electrical, plumbing, and mechanical work; suspended acoustical ceilings, and interior finishes in compliance with Ch. 8 of the 2015 IBC. 2-hr shaft enclosures for stairways, 2-hr mechanical shafts, 1-hr smoke barriers creating smoke compartments, smoke partitions creating I-2 rated corridors, and smoke partitions creating care suites are required to be maintained. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. Specials Inspections required per attached Form 310. The fire sprinkler system is required to comply with NFPA 13 (including quick-response heads installed within the remodeled areas) and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 9/25/20199/23/2019 DONE
This permit finaled on the web by Curtis Weedop
Third Notice 8/18/20199/20/2019 DONE
emailed curtis with first follow up letter
First Follow up  9/20/2019 DONE
Third Notice 7/23/20198/13/2019 DONE
emailed curtis 8-13
Telephone call  7/23/2019 DONE
Received call from Victoria from St. Lukes indicating that they are still receiving bills for this project, don't know final values yets.
Third Notice 6/15/20197/18/2019 DONE
emailed curtis
Second Notice 5/16/20196/10/2019 DONE
emailed to curtis
Meeting  6/10/2019 DONE
emailed curtis
First Notice 3/25/20195/6/2019 DONE
emailed to curtis and vira 5-6-19
BLD-Final3/14/20193/14/20193/15/2019PPASS
DetailsDave Hannah
kelly Phone #: ###-####
Print Occupancy Form  3/15/2019 DONE
Permanent Occupancy  3/15/2019 DONE
FIRE-Final Inspection3/14/20193/14/20193/14/2019PPASS
DetailsJim Page
Final life fire safety inspection for area of work complete.

kelly Phone #: ###-####
BLD-Ceiling Grid Inspection3/7/20193/7/20193/7/2019PPASS
DetailsDave Hannah
Kelly Phone #: ###-####
BLD-Ceiling Grid Inspection3/6/20193/6/20193/7/2019PPEND
DetailsDave Hannah
Kelly Phone #: ###-#### fire stopping on ceiling
BLD-Ceiling Grid Inspection2/28/20192/28/20192/28/2019PCANC
DetailsBrandon Shaw
Kelly Phone #: ###-####
BLD-Ceiling Grid Inspection2/20/20192/21/20192/21/2019APART
DetailsDave Hannah
Stan Phone #: ###-#### hard lid ok grid still needs elec
BLD-Wall cover1/22/20191/22/20191/22/2019PPASS
DetailsDave Hannah
Kelly Phone #: ###-####
Issue PAID IN FULL permit  10/29/2018 DONE
Print Occupancy Form  10/29/2018 DONE
Permit Ready to Issue  10/15/2018 DONE
Need
GC Form
Revised Cert of Value
Plan assigned to (JAR)8/22/20188/22/201810/12/2018 DONE
DetailsJulie Romig
10/11 - 2nd Rev - 1st Rev Comp - 520 St. Lukes Regional Med
Routing Off Site - STRUCTURAL10/6/2018 10/12/2018 PASS
DetailsJulie Romig
PLANS/APPL TAKEN TO FRONT DESK  10/12/2018 DONE
Routing - PLAN CHECK10/6/2018 10/10/2018 PASS
DetailsJulie Romig
Route to Impact Fee Review9/27/20189/30/20189/28/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - PLAN CHECK8/22/2018 9/27/2018 FAIL
DetailsJulie Romig
1st review completed  9/27/2018 DONE
DetailsJulie Romig
Routing - FIRE8/22/20188/22/20189/18/2018 PASS
DetailsErika Akin
Attached comments to case
Routing Off Site - STRUCTURAL8/22/2018 9/6/2018 PASS
DetailsJulie Romig
Corrections required per ePlan Review. Structural report emailed to architect 9/7/18.
Routing PW Environmental8/22/2018 8/29/2018 PASS
DetailsRick Christenson
Routing - MECHANICAL8/22/2018 8/23/2018 PASS
DetailsTroy James
Routing - PLUMBING8/22/2018 8/22/2018 PASS
DetailsBill VanDegrift
Per plan and ISPC and NFPA 99.
Routing - Addressing8/22/2018 8/22/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS8/22/2018 8/22/2018 PASS
DetailsRachael Beierle
Intake Approval  8/17/2018 PASS
Intake Approval  8/16/2018 FAIL
DetailsJavier Guzman
Provide and upload the following:
• Structural engineering calculations stamped and signed by an Idaho licensed engineer
Application received  8/14/2018 DONE
Application submitted via PDS Online on Aug 14 2018 2:36PM