Letter of compliance/Occupancy | | | 11/1/2018 | | DONE |
|
|
|
|
BLD-Final | 10/23/2018 | 10/25/2018 | 10/25/2018 | P | PASS |
Dave Hannah
|
|
|
Jason'' Phone #: ###-####
|
DOC - Permit Finaled | 10/25/2018 | 10/25/2018 | 10/25/2018 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 9/24/2018 | 9/24/2018 | 9/24/2018 | P | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
Issue PAID IN FULL permit | | | 9/11/2018 | | DONE |
|
|
|
|
Route to Impact Fee Review | 9/5/2018 | 9/8/2018 | 9/6/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Inspection Record Card- Bld | | | 9/6/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/6/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 9/6/2018 | | DONE |
|
|
|
Need
GC form signed by Parcel Owner
Update app to included Parcel Owner and get signature
|
Telephone call | | | 9/6/2018 | | DONE |
|
|
|
Called Jason to advise permit is ready pending application update & 302 form from Parcel Owner
|
Route to Impact Fee Review | 9/5/2018 | 9/10/2018 | 9/5/2018 | | PASS |
Eric Bilimoria
|
|
|
|
Plan assigned to (JAB) Josh | 9/4/2018 | 9/4/2018 | 9/5/2018 | | PASS |
Josh Bogle
|
|
|
08/10 ADU, paper
|
Routing - MECHANICAL | 9/4/2018 | | 9/5/2018 | | PASS |
Troy James
|
|
|
Owner to verify existing fan is energy star rated. If not the owner will replace fan with energy star and install 24 hr time clock
|
Routing - PLAN CHECK | 9/5/2018 | | 9/5/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 9/5/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 9/5/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/5/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/5/2018 | | DONE |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 9/4/2018 | 9/4/2018 | 9/4/2018 | A | DONE |
David Moser
|
|
|
SEE CAA18-00062 approval for ADU, need to removal deck as required by the PZC and comply with conditions of approval from CAA18-00062
|
Routing Walk-In (BLD) | 9/4/2018 | 9/4/2018 | 9/4/2018 | A | PASS |
Josh Bogle
|
|
|
ADU - took in and routed, level two
|
Routing - Addressing | 9/4/2018 | | 9/4/2018 | | PASS |
Doug Chausow
|
|
|
ADU Address: 437 N Riverview Dr
|
Routing - PUBLIC WORKS | 9/4/2018 | | 9/4/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing Walk-In (BLD) | 8/14/2018 | 8/14/2018 | 8/14/2018 | P | FAIL |
Josh Bogle
|
|
|
discussed submittal requirements for converting the space to a legal ADU, with one Jason Williams
|
Meeting | | | 8/14/2018 | | DONE |
|
|
|
Tenat came in to get building permit, we informed them before we can issue the permit we will need a letter from the parcel owner stating they are allowed to act as their own gc.
|
Application received | | 8/14/2018 | | | |
|
|
|
|