BLD-Final | 11/27/2018 | 11/27/2018 | 11/27/2018 | P | PASS |
Brandon Shaw
|
|
|
Solar on Modular building. Installed exactly to approved plans. Modular building located behind Puentes Language School. Please call if you would like me to meet you with approved plans. Phone #: ###-#### Inspection requested via web by Jesse Simpson
|
DOC - Permit Finaled | 11/27/2018 | 11/27/2018 | 11/27/2018 | P | PASS |
Brandon Shaw
|
|
|
|
Issue PAID IN FULL permit | | | 9/21/2018 | | DONE |
|
|
|
|
Plan assigned to (JG) | 8/27/2018 | 8/27/2018 | 9/20/2018 | | PASS |
Javier Guzman
|
|
|
9/12 Puentes Preschool Solar Panels L-3, pend fire
|
Routing - FIRE | 8/27/2018 | 8/27/2018 | 9/20/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
1st review completed | | | 9/20/2018 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/20/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/20/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/27/2018 | | 9/13/2018 | | PASS |
Javier Guzman
|
|
|
|
Routing - ELECTRICAL | 8/27/2018 | | 9/13/2018 | | PASS |
Javier Guzman
|
|
|
|
Routing - Addressing | 8/28/2018 | | 8/28/2018 | | PASS |
Doug Chausow
|
|
|
Applicatin address is correct: 5479 W Overland Rd.
|
Routing - PUBLIC WORKS | 8/28/2018 | | 8/28/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Design Review | 8/27/2018 | | 8/27/2018 | | PASS |
KayCee Babb
|
|
|
per DRH18-00347. Panels located at 5479 W Overland Rd.
|
Intake Approval | | | 8/23/2018 | | PASS |
|
|
|
|
Intake Approval | | | 8/20/2018 | | FAIL |
Michael Hanson
|
|
|
This permit has failed prescreen due to the following:
1. Missing last page of the 520 form with signature and date.
2. All drawings sheets must be individually uploaded.
3. Upload equipment specifications to the documents folder not the drawings folder.
|
Application received | | | 8/16/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 16 2018 2:01PM
|