BLD-Blower Door Test Results | 3/25/2020 | 3/25/2020 | 3/26/2020 | P | DONE |
Tell Riley
|
|
|
4.72 ACH 50
|
BLD-Final | 3/24/2020 | 3/25/2020 | 3/25/2020 | P | DONE |
Tell Riley
|
|
|
Erikc Phone #: ###-####//corrections made//waiting for blower door test ACH, test was completed , ACH was not calculated, will record when ACH is recieved//
|
DOC - Permit Finaled | 3/25/2020 | 3/25/2020 | 3/25/2020 | P | PASS |
Tell Riley
|
|
|
corections made///
|
BLD-Aging Inspection | 12/11/2019 | 12/11/2019 | 12/11/2019 | | DONE |
Tell Riley
|
|
|
Expires: 01/25/20
|
BLD-Aging Inspection | 12/10/2019 | 12/10/2019 | 12/10/2019 | | DONE |
Tell Riley
|
|
|
Expires: 01/25/20
|
BLD-Final | 7/26/2019 | 7/29/2019 | 7/29/2019 | A | FAIL |
Tell Riley
|
|
|
call for garage code- Eric Phone #: ###-####//correction notice issued//need blower door test//window fall protection at windows on second story under 24 inch sill height//need landing at egress door 36''//
|
BLD-Final | 5/30/2019 | 5/31/2019 | 5/30/2019 | P | PEND |
Jim Sly
|
|
|
call for access- Eric Phone #: ###-#### Work in progress
|
BLD-Energy code compliance | 11/13/2018 | 11/15/2018 | 11/15/2018 | A | PASS |
Jim Sly
|
|
|
Eric Phone #: ###-####
|
BLD-Framing/Rough-in | 11/8/2018 | 11/13/2018 | 11/13/2018 | A | PASS |
Jim Sly
|
|
|
Eric Phone #: ###-####
|
BLD-Wall Bracing | 10/16/2018 | 10/22/2018 | 10/22/2018 | A | PART |
Jim Sly
|
|
|
Eric Phone #: ###-#### Missing 2 H D garage 2 H D 4 foot interior brace wall panel.........straps at garage front portal. Exterior nailing......OK
|
BLD-Foundation | 9/24/2018 | 9/24/2018 | 9/24/2018 | P | PART |
Mike Jordan
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 9/20/2018 | 9/21/2018 | 9/21/2018 | A | PASS |
Jim Sly
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
Issue PAID IN FULL permit | | | 9/20/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 9/7/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 8/17/2018 | 8/17/2018 | 9/7/2018 | | DONE |
Rob Patrick
|
|
|
08/30 sfd L1 Paper...8/23 Failed: Braced Wall & Tall Wall Engineering
|
Inspection Record Card- Bld | | | 9/7/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (FEE) | | | 9/7/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (RDY) | | | 9/7/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/7/2018 | | DONE |
|
|
|
|
Telephone call | | | 9/7/2018 | | DONE |
|
|
|
called applicant and left vm permit is ready and fee due
|
Routing - PLAN CHECK | 9/4/2018 | | 9/7/2018 | | PASS |
Rob Patrick
|
|
|
Delivered to Jeff for another Planning Review
|
Case Summary (BLD) | | | 9/7/2018 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/7/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 9/7/2018 | | DONE |
|
|
|
|
Routing - PLANNING | 9/4/2018 | | 9/4/2018 | | PASS |
Jeff Lowe
|
|
|
revised plans of 8/31/2018
|
Plan resubmittals received | | | 8/31/2018 | | DONE |
|
|
|
Two copies of sheets A1, A2, A3, A4, A5, A6, A7, A8, A9, A10 and A11. Taken to Rob
|
1st review completed | | | 8/24/2018 | | FAIL |
Rob Patrick
|
|
|
8/23 Failed: Wall Bracing & Tall Wall Engineering
|
Routing - PLAN CHECK | | | 8/24/2018 | | FAIL |
Rob Patrick
|
|
|
8/23 Failed: Wall Bracing & Tall Wall Engineering
|
Routing - MECHANICAL | 8/20/2018 | | 8/21/2018 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 8/17/2018 | 8/20/2018 | 8/20/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 8/20/2018 | | 8/20/2018 | | PASS |
Sue Cummings
|
|
|
max driveway width is 33 ft.
|
Routing - PUBLIC WORKS | 8/17/2018 | | 8/20/2018 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/17/2018 | | DONE |
|
|
|
|
Intake Approval | | | 8/17/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/17/2018 | | DONE |
|
|
|
|
Routing - Addressing | 8/17/2018 | | 8/17/2018 | | PASS |
Doug Chausow
|
|
|
New address 4525 W Rim St
|
Application received | | 8/16/2018 | | | |
|
|
|
|