BLD-Final | 7/12/2019 | 7/15/2019 | 7/15/2019 | P | PASS |
Jim Storey
|
|
|
Garage code 0609 Phone #: ###-#### Inspection requested via web by Elena Stephens
|
DOC - Permit Finaled | 7/15/2019 | 7/15/2019 | 7/15/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Blower Door Test Results | 7/15/2019 | 7/15/2019 | 7/15/2019 | P | DONE |
Jim Storey
|
|
|
Garage code 0609 Phone #: ###-#### Inspection requested via web by Elena Stephens 3.87
|
BLD-Final | 7/12/2019 | 7/12/2019 | 7/12/2019 | P | CANC |
Jim Storey
|
|
|
Garage code 0609 Phone #: ###-#### >> Inspection requested via web by Elena Stephens Inspection cancelled from web by: Elena Stephens
|
BLD-Energy code compliance | 4/22/2019 | 4/22/2019 | 4/22/2019 | P | PASS |
Jim Storey
|
|
|
Inspection requested via web by Marc Foote
|
BLD-Energy code compliance | 4/19/2019 | 4/22/2019 | 4/22/2019 | A | PASS |
Jim Storey
|
|
|
Inspection requested via web by Marc Foote
|
BLD-Energy code compliance | 4/19/2019 | 4/19/2019 | 4/19/2019 | P | CANC |
Jim Storey
|
|
|
Inside of girder is sheeted. Cancel if attic side is what you want sheetedplease Inspection requested via web by Marc Foote
|
BLD-Framing/Rough-in | 4/19/2019 | 4/19/2019 | 4/19/2019 | P | PASS |
Jim Storey
|
|
|
Inspection requested via web by Marc Foote
|
BLD-Energy code compliance | 4/18/2019 | 4/18/2019 | 4/18/2019 | P | FAIL |
Jim Storey
|
|
|
Inspection requested via web by Marc Foote previous c/n not done// insulation at girder not incapsulated in attic.
|
BLD-Framing/Rough-in | 4/15/2019 | 4/16/2019 | 4/16/2019 | P | DONE |
Jim Storey
|
|
|
Inspection requested via web by Marc Foote
|
BLD-Framing/Rough-in | 4/12/2019 | 4/16/2019 | 4/16/2019 | A | PART |
Brandon Shaw
|
|
|
Portal framing anchor bolts to secured- 2 locations; front bedroom and Family room- fingure tight + 1/4 turn...
|
BLD-Framing/Rough-in | 4/1/2019 | 4/1/2019 | 4/1/2019 | P | CANC |
Jim Storey
|
|
|
Plans by fireplace Phone #: ###-#### >> Inspection requested via web by Marc Foote Inspection cancelled from web by: Marc Foote
|
BLD-Wall Bracing | 3/28/2019 | 3/28/2019 | 3/28/2019 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Marc Foote
|
BLD-Footing | 1/22/2019 | 1/23/2019 | 1/23/2019 | A | PASS |
Jim Storey
|
|
|
Jared Phone #: ###-####
|
Issue PAID IN FULL permit | | | 1/15/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/15/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 9/4/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 8/20/2018 | 8/20/2018 | 9/4/2018 | | DONE |
Brian McGowan
|
|
|
08/31 sfd L1 ePlan - Corrections Required
|
Routing - PLAN CHECK | 9/4/2018 | | 9/4/2018 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/4/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 9/4/2018 | | DONE |
|
|
|
|
1st review completed | | | 8/30/2018 | | FAIL |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 8/20/2018 | | 8/30/2018 | | FAIL |
Brian McGowan
|
|
|
|
Route to Impact Fee Review | 8/20/2018 | 8/23/2018 | 8/21/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 8/20/2018 | | 8/21/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/20/2018 | | 8/20/2018 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/20/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/20/2018 | | DONE |
|
|
|
|
Intake Approval | | | 8/20/2018 | | PASS |
|
|
|
|
Routing - MECHANICAL | 8/20/2018 | | 8/20/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 8/20/2018 | | 8/20/2018 | | PASS |
Sue Cummings
|
|
|
|
Application received | | | 8/17/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 17 2018 9:36AM
|