BLD-Final | 9/19/2018 | 9/20/2018 | 9/21/2018 | A | NR |
Dave Hannah
|
|
|
Mike Phone #: ###-####
|
BLD-Footing | 9/7/2018 | 9/10/2018 | 9/12/2018 | A | PASS |
Dave Hannah
|
|
|
Andy Phone #: ###-####
|
BLD-Foundation | 9/10/2018 | 9/11/2018 | 9/11/2018 | P | PASS |
Dave Hannah
|
|
|
WALL // Andy Phone #: ###-####
|
PubWorks Subgrade Approval | 9/11/2018 | 9/11/2018 | 9/11/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 9/6/2018 | 9/7/2018 | 9/7/2018 | P | NR |
Brandon Shaw
|
|
|
Need subgrade soil and PW approval
|
BLD-Footing | 9/5/2018 | 9/6/2018 | 9/6/2018 | A | NR |
Dave Hannah
|
|
|
Andy Phone #: ###-#### needs geo
|
Routing Walk-In (BLD) | 8/21/2018 | 8/21/2018 | 8/21/2018 | A | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 8/20/2018 | 8/20/2018 | 8/21/2018 | | PASS |
Josh Bogle
|
|
|
08/24 retaining wall, paper - Hillside
|
Routing - Erosion and Sediment | 8/20/2018 | | 8/21/2018 | | PASS |
Andy J. Long
|
|
|
work to be under existing ESC permit per AJL -
|
Routing - PLAN CHECK | 8/20/2018 | | 8/21/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 8/21/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 8/21/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 8/21/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/21/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 8/21/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/21/2018 | | DONE |
|
|
|
|
Routing Walk-In (PW Hillside) | 8/20/2018 | 8/20/2018 | 8/20/2018 | | DONE |
Ted Vanegas
|
|
|
|
Routing Walk-In (Zoning) | 8/20/2018 | 8/20/2018 | 8/20/2018 | A | PASS |
Nicolette Womack
|
|
|
Retaining Walls shall not exceed 6' in exposed height within the setbacks.
|
Routing Walk-In (BLD) | 8/20/2018 | 8/20/2018 | 8/20/2018 | A | PASS |
Josh Bogle
|
|
|
took in as a level 2
|
Routing PW Grading-Hillside | 8/20/2018 | | 8/20/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Routing - PUBLIC WORKS | 8/20/2018 | | 8/20/2018 | | PASS |
Morgan Webb
|
|
|
|
Application received | | 8/20/2018 | | | |
|
|
|
|