Permit Information
Permit NumberBLD18-03017
StatusFinaled
Name BLACKROCK HOMES LLC
Site Address 2520 E WARM SPRINGS AVE
Project NameWayne B
Customer Number 
ePlanReviewYes
Description
(PLAN RESUBMITTAL) - MODIFYING SLAB FLOOR TO CRAWL SPACE - 10-9-18 - BJM) WUI FOOTHILLS, ZONE "A" REQUIREMENTS, CLASS "A" ROOF REQUIRED. Permit for the construction of a new 2,546 sq. ft., two story (first story 1,665sq. ft., second story 881sq. ft.) single family dwelling with 3 bedrooms, 3 bathrooms, approximately 157 sq. ft. of covered patio/porch and a 741 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. REScheck provided. ***BJM***
Removed from hillside layer. Subgrade required
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/6/20196/7/20196/7/2019APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Clint Wall
DOC - Permit Finaled6/7/20196/7/20196/7/2019PPASS
DetailsDave Hannah
BLD-Blower Door Test Results6/6/20196/7/20196/7/2019APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Clint Wall 4.11
BLD-Energy code compliance4/1/20194/4/20194/4/2019APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Framing/Rough-in4/2/20194/2/20194/2/2019PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Framing/Rough-in4/1/20194/2/20194/2/2019ANR
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Clint Wall needs mec rough in
BLD-Other3/12/20193/14/20193/14/2019APASS
DetailsDave Hannah
sheet rock sofits
BLD-Wall Bracing3/12/20193/12/20193/12/2019PPASS
DetailsDave Hannah
Jorge Phone #: ###-####
Plan Modification Accepted  1/10/2019 DONE
New manual j report
Routing - MECHANICAL1/10/2019 1/10/2019 PASS
DetailsTroy James
Resubmitted manual j report
BLD-Foundation10/25/201810/25/201810/25/2018PPASS
DetailsDave Hannah
Matt Phone #: ###-####
BLD-Footing10/25/201810/25/201810/25/2018APASS
DetailsDave Hannah
Matt Phone #: ###-####
BLD-Footing10/24/201810/24/201810/25/2018PPASS
DetailsDave Hannah
Matt Phone #: ###-####
PubWorks Subgrade Approval10/24/201810/24/201810/24/2018 DONE
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

Issue PAID IN FULL permit  10/10/2018 DONE
Inspection Record Card- Bld  10/10/2018 DONE
OVERRIDE  10/9/2018  
Plan assigned to (BJM)10/3/201810/3/201810/9/2018 DONE
DetailsBrian McGowan
10/10 - Plan Mod
Routing - PLAN CHECK10/9/2018 10/9/2018 PASS
DetailsBrian McGowan
Plan Reviewer's activity  10/9/2018 DONE
DetailsBrian McGowan
Please add (1) hour of Plan Review to this permit for the Plan Modification. The square footage of this permit was increased by (1) square foot by the applicant. I did not add anything to the Value, I am not sure what the cost basis for this home was set for.
Permit Ready to Issue  10/9/2018 DONE
resubmittals approved
all requirements met
CHANGE STATUS TO (REV)  10/3/2018 DONE
Plan Mod
Plan Modification Accepted  10/3/2018 DONE
Plan Mod/Resubmittal - change from slab on grade to crawl foundation
OVERRIDE  9/27/2018  
Plan assigned to (BJM)9/10/20189/10/20189/27/2018 DONE
DetailsBrian McGowan
09/10 sfd L2 ePlan- 1st Review Complete - Corrections Required
Routing - PLAN CHECK9/27/2018 9/27/2018 PASS
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  9/27/2018 DONE
DetailsBrian McGowan
Override - Parcel Holds  9/27/2018  
Permit Ready to Issue  9/27/2018 DONE
met
1st review completed  9/10/2018 FAIL
DetailsBrian McGowan
Routing - PLAN CHECK8/22/2018 9/10/2018 FAIL
DetailsBrian McGowan
Routing - FIRE8/22/20188/22/20188/28/2018 PASS
DetailsErika Akin
Fire area 3443, fire flow 1000 gpm. Plans were reviewed for FD access, availability of hydrants and defensible space.
Route to Impact Fee Review8/22/20188/25/20188/23/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL8/22/2018 8/22/2018 PASS
DetailsChad Schwendiman
Routing - PLANNING8/22/2018 8/22/2018 PASS
DetailsSue Cummings
Routing - Addressing8/22/2018 8/22/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS8/22/2018 8/22/2018 PASS
DetailsMorgan Webb
Plans ACCEPTED BY PLAN TECH  8/22/2018 DONE
Override - Parcel Holds  8/22/2018  
Recd Pcfee & Taken To Pln CK  8/22/2018 DONE
Intake Approval  8/22/2018 PASS
Plan assigned to (M_H)8/22/2018 8/22/2018 DEFR
DetailsMichael Hanson
09/10 sfd L2 ePlan
Application received  8/20/2018 DONE
Application submitted via PDS Online on Aug 20 2018 3:10PM