BLD-Final | 6/6/2019 | 6/7/2019 | 6/7/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 6/7/2019 | 6/7/2019 | 6/7/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Blower Door Test Results | 6/6/2019 | 6/7/2019 | 6/7/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall 4.11
|
BLD-Energy code compliance | 4/1/2019 | 4/4/2019 | 4/4/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 4/2/2019 | 4/2/2019 | 4/2/2019 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 4/1/2019 | 4/2/2019 | 4/2/2019 | A | NR |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall needs mec rough in
|
BLD-Other | 3/12/2019 | 3/14/2019 | 3/14/2019 | A | PASS |
Dave Hannah
|
|
|
sheet rock sofits
|
BLD-Wall Bracing | 3/12/2019 | 3/12/2019 | 3/12/2019 | P | PASS |
Dave Hannah
|
|
|
Jorge Phone #: ###-####
|
Plan Modification Accepted | | | 1/10/2019 | | DONE |
|
|
|
New manual j report
|
Routing - MECHANICAL | 1/10/2019 | | 1/10/2019 | | PASS |
Troy James
|
|
|
Resubmitted manual j report
|
BLD-Foundation | 10/25/2018 | 10/25/2018 | 10/25/2018 | P | PASS |
Dave Hannah
|
|
|
Matt Phone #: ###-####
|
BLD-Footing | 10/25/2018 | 10/25/2018 | 10/25/2018 | A | PASS |
Dave Hannah
|
|
|
Matt Phone #: ###-####
|
BLD-Footing | 10/24/2018 | 10/24/2018 | 10/25/2018 | P | PASS |
Dave Hannah
|
|
|
Matt Phone #: ###-####
|
PubWorks Subgrade Approval | 10/24/2018 | 10/24/2018 | 10/24/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 10/10/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/10/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 10/9/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 10/3/2018 | 10/3/2018 | 10/9/2018 | | DONE |
Brian McGowan
|
|
|
10/10 - Plan Mod
|
Routing - PLAN CHECK | 10/9/2018 | | 10/9/2018 | | PASS |
Brian McGowan
|
|
|
|
Plan Reviewer's activity | | | 10/9/2018 | | DONE |
Brian McGowan
|
|
|
Please add (1) hour of Plan Review to this permit for the Plan Modification. The square footage of this permit was increased by (1) square foot by the applicant. I did not add anything to the Value, I am not sure what the cost basis for this home was set for.
|
Permit Ready to Issue | | | 10/9/2018 | | DONE |
|
|
|
resubmittals approved
all requirements met
|
CHANGE STATUS TO (REV) | | | 10/3/2018 | | DONE |
|
|
|
Plan Mod
|
Plan Modification Accepted | | | 10/3/2018 | | DONE |
|
|
|
Plan Mod/Resubmittal - change from slab on grade to crawl foundation
|
OVERRIDE | | | 9/27/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 9/10/2018 | 9/10/2018 | 9/27/2018 | | DONE |
Brian McGowan
|
|
|
09/10 sfd L2 ePlan- 1st Review Complete - Corrections Required
|
Routing - PLAN CHECK | 9/27/2018 | | 9/27/2018 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/27/2018 | | DONE |
Brian McGowan
|
|
|
|
Override - Parcel Holds | | | 9/27/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 9/27/2018 | | DONE |
|
|
|
met
|
1st review completed | | | 9/10/2018 | | FAIL |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 8/22/2018 | | 9/10/2018 | | FAIL |
Brian McGowan
|
|
|
|
Routing - FIRE | 8/22/2018 | 8/22/2018 | 8/28/2018 | | PASS |
Erika Akin
|
|
|
Fire area 3443, fire flow 1000 gpm. Plans were reviewed for FD access, availability of hydrants and defensible space.
|
Route to Impact Fee Review | 8/22/2018 | 8/25/2018 | 8/23/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 8/22/2018 | | 8/22/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - PLANNING | 8/22/2018 | | 8/22/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 8/22/2018 | | 8/22/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/22/2018 | | 8/22/2018 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/22/2018 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 8/22/2018 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/22/2018 | | DONE |
|
|
|
|
Intake Approval | | | 8/22/2018 | | PASS |
|
|
|
|
Plan assigned to (M_H) | 8/22/2018 | | 8/22/2018 | | DEFR |
Michael Hanson
|
|
|
09/10 sfd L2 ePlan
|
Application received | | | 8/20/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 20 2018 3:10PM
|