BLD-Final | 11/7/2019 | 11/12/2019 | 11/12/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 11/12/2019 | 11/12/2019 | 11/12/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 11/7/2019 | 11/12/2019 | 11/12/2019 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 4.6
|
BLD-Energy code compliance | 9/3/2019 | 9/10/2019 | 9/10/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 9/3/2019 | 9/6/2019 | 9/6/2019 | A | PASS |
Brandon Shaw
|
|
|
Ok to insulate...
|
BLD-Wall Bracing | 8/14/2019 | 8/15/2019 | 8/15/2019 | P | PASS |
Brandon Shaw
|
|
|
Shear // Jorge Phone #: ###-####
|
Routing - MECHANICAL | 6/12/2019 | | 6/12/2019 | | PASS |
Troy James
|
|
|
Resubmitted manual j report
|
BLD-Conference | 4/10/2019 | 4/11/2019 | 4/11/2019 | A | DONE |
Dave Hannah
|
|
|
As late as possible Phone #: 2084078920 >> Inspection requested via mobile web by Juan
|
BLD-Foundation | 4/11/2019 | 4/11/2019 | 4/11/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Footing | 4/9/2019 | 4/9/2019 | 4/10/2019 | P | PASS |
Dave Hannah
|
|
|
As late as possible Phone #: 2084078920 >> Inspection requested via mobile web by Juan
|
PubWorks Subgrade Approval | 4/9/2019 | 4/9/2019 | 4/9/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 12/21/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/21/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 11/6/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 9/10/2018 | 9/10/2018 | 11/6/2018 | | DONE |
Brian McGowan
|
|
|
09/10 sfd L2 ePlan- 2nd Review Complete - Corrections Required
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/6/2018 | | DONE |
Brian McGowan
|
|
|
|
Override - Parcel Holds | | | 11/6/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 11/6/2018 | | DONE |
|
|
|
met
|
Routing - PLAN CHECK | 11/1/2018 | | 11/1/2018 | | PASS |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 9/10/2018 | | 9/10/2018 | | FAIL |
Brian McGowan
|
|
|
|
1st review completed | | | 9/10/2018 | | FAIL |
Brian McGowan
|
|
|
|
Routing - FIRE | 8/22/2018 | 8/22/2018 | 8/28/2018 | | PASS |
Erika Akin
|
|
|
Fire Area 3443, fire flow 1000 gpm. Plans were reviewed for FD access, availability of hydrants and defensible space.
|
Route to Impact Fee Review | 8/22/2018 | 8/25/2018 | 8/23/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Plans ACCEPTED BY PLAN TECH | | | 8/22/2018 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 8/22/2018 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/22/2018 | | DONE |
|
|
|
|
Intake Approval | | | 8/22/2018 | | PASS |
|
|
|
|
Plan assigned to (M_H) | 8/22/2018 | | 8/22/2018 | | DEFR |
Michael Hanson
|
|
|
09/10 sfd L2 ePlan
|
Routing - MECHANICAL | 8/22/2018 | | 8/22/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - PLANNING | 8/22/2018 | | 8/22/2018 | | PASS |
Sue Cummings
|
|
|
Concrete patio not to cross property line.
|
Routing - Addressing | 8/22/2018 | | 8/22/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/22/2018 | | 8/22/2018 | | PASS |
Morgan Webb
|
|
|
|
Application received | | | 8/20/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 20 2018 3:16PM
|