Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-03025
StatusFinaled
Name ELECTRIC AUTHORITY INC
Site Address 4790 N MIRTH PL
Project NameSpence PV
Customer Number 
ePlanReviewYes
Description
Permit for 160sq' of roof-mounted, grid-tied Photo-voltaic panels with optimizers; 9 panels in 1 array. No work needed to the existing roof structure per engineer’s roof evaluation. All work per plans, engineering, manufacturer’s specs, & local code. Separate electrical permit required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/11/20189/12/20189/12/2018APASS
DetailsJim Sly
Call Jay ###-#### Phone #: ###-#### Inspection requested via web by Seth Stears
DOC - Permit Finaled9/12/20189/12/20189/12/2018PPASS
DetailsJim Sly
BLD-Framing/Rough-in9/11/20189/11/20189/11/2018PPASS
DetailsJim Sly
Call Jay @ ###-#### solar rough-in Phone #: ###-#### Inspection requested via web by Seth Stears
Issue PAID IN FULL permit  8/27/2018 DONE
Inspection Record Card- Bld  8/27/2018 DONE
Plan assigned to (JAB) Josh8/21/20188/21/20188/24/2018 PASS
DetailsJosh Bogle
08/27 PV, ePlan
Routing - PLAN CHECK8/21/2018 8/24/2018 PASS
DetailsJosh Bogle
1st review completed  8/24/2018 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  8/24/2018 DONE
DetailsJosh Bogle
ESC no - Energy no
Permit Ready to Issue  8/24/2018 DONE
Routing - PLANNING8/21/2018 8/21/2018 PASS
DetailsColleen T Carroll
Intake Approval  8/21/2018 FAIL
Please upload all plans in correct orientation for which they are formatted (landscape vs. portrait).(Please name them the same so, they can version over).
Plans ACCEPTED BY PLAN TECH  8/21/2018 DONE
Recd Pcfee & Taken To Pln CK  8/21/2018 DONE
no fee taken at intake, 406
Intake Approval  8/21/2018 PASS
Application received  8/20/2018 DONE
Application submitted via PDS Online on Aug 20 2018 4:29PM
Intake Approval  8/20/2018 FAIL
Please upload all sheets separately and in correct orientation for which they are formatted (landscape vs. portrait).
Plans need to be uploaded in the drawings folder as individual sheets and the documents in the documents folder (do not need to be individual sheets)