Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD18-03036
StatusFinaled
Name PURE DESIGN + BUILD LLC
Site Address 1309 N 20TH ST
Project NameTitus garage
Customer NumberDRH18-00362
ePlanReviewNo
Description
Permit to build a 529sq' garage with 127sq' attached office in the location of an existing 385sq' garage (to be removed). Heat is via ductless heat-pump. Fresh air supply via fan that also conditions the crawl. All work per plans, notations, local codes & ordinances. Separate electrical & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  8/13/2019 DONE
per David H. this is okay to Doc Final
Zoning Approval8/8/20198/8/20198/8/2019 PASS
DetailsKayCee Babb
Per DRH18-00362. Removal of post approved.
BLD-Final6/18/20196/18/20196/18/2019PPEND
DetailsDave Hannah
John Phone #: ###-#### ok to final after zoning finals
BLD-Framing/Rough-in1/10/20191/11/20191/11/2019APASS
DetailsDave Hannah
Deanna Phone #: ###-####
BLD-Framing/Rough-in11/2/201811/5/201811/5/2018APASS
DetailsDave Hannah
John Phone #: ###-####
BLD-Energy code compliance11/2/201811/5/201811/5/2018APASS
DetailsDave Hannah
John Phone #: ###-####
Meeting  11/5/2018 DONE
Okayed not using originally proposed window.
BLD-Wall Bracing10/25/201810/25/201810/25/2018PPASS
DetailsDave Hannah
John Phone #: ###-####
BLD-Foundation10/10/201810/11/201810/11/2018PPASS
DetailsDave Hannah
Dane Phone #: ###-####
BLD-Footing10/9/201810/10/201810/10/2018PPASS
DetailsDave Hannah
Dane Phone #: ###-####
BLD-Footing10/8/201810/9/201810/9/2018PCANC
DetailsDave Hannah
Dane Phone #: ###-####
BLD-Footing10/5/201810/8/201810/8/2018PCANC
DetailsDave Hannah
Dane Phone #: ###-####
BLD-Conference10/3/201810/4/201810/4/2018PCANC
DetailsBrandon Shaw
Dane Phone #: ###-####
Issue PAID IN FULL permit  9/7/2018 DONE
OVERRIDE  9/6/2018  
Plan assigned to (JAB) Josh9/5/20189/5/20189/6/2018 PASS
DetailsJosh Bogle
09/10 garage, paper
Routing - PLAN CHECK9/5/2018 9/6/2018 PASS
DetailsJosh Bogle
1st review completed  9/6/2018 DONE
DetailsJosh Bogle
Inspection Record Card- Bld  9/6/2018 DONE
DetailsJosh Bogle
Case Summary (BLD)  9/6/2018 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  9/6/2018 DONE
DetailsJosh Bogle
Permit Ready to Issue  9/6/2018 DONE
NEED
SIGN APPLICATION
Routing Walk-In (Zoning)9/4/20189/4/20189/4/2018PPASS
DetailsTed Vanegas
Routing Walk-In (BLD)9/4/20189/4/20189/4/2018PPASS
DetailsJosh Bogle
took in as a level 2
Routing Walk-In (Zoning)8/21/20188/21/20188/21/2018PPASS
DetailsJosh Bogle
no zoning sign-off pending 10 day wait period
Routing Walk-In (BLD)8/21/20188/21/20188/21/2018PFAIL
DetailsJosh Bogle
Routing - PLAN CHECK8/21/2018 8/21/2018 FAIL
DetailsJosh Bogle
still in 10 day waiting period
1st review completed  8/21/2018 FAIL
DetailsJosh Bogle
Application received 8/21/2018