BLD-Final | 6/4/2019 | 6/5/2019 | 6/5/2019 | A | PASS |
Jim Storey
|
|
|
Kate-please call Kate for access info-NO ONE can cancel this inspection but Kate (current parcel owner/general contractor) Phone #: ###-####
|
BLD-Blower Door Test Results | 6/5/2019 | 6/5/2019 | 6/5/2019 | P | DONE |
Jim Storey
|
|
|
Kate-please call Kate for access info-NO ONE can cancel this inspection but Kate (current parcel owner/general contractor) Phone #: ###-#### 3.98
|
DOC - Permit Finaled | | | 6/5/2019 | | DONE |
|
|
|
|
Letter of compliance/Occupancy | | | 6/5/2019 | | DONE |
|
|
|
|
Meeting | | | 6/5/2019 | | DONE |
|
|
|
Permit transfered from General Contractor, Berlum Development Company, to parcel owner GC. See attached letter from parcel owner Kate Kennedy and revised GC form.
|
BLD-Final | 6/3/2019 | 6/4/2019 | 6/4/2019 | A | CANC |
Jim Storey
|
|
|
Per Arrow with Berlum Development Co, not ready for final inspection
Call for garage code Phone #: ###-#### >> Inspection requested via web by Kate Kennedy
|
Meeting | | | 6/4/2019 | | DONE |
|
|
|
parcel owner Kate Kenndy came in and signed the GC form to be her own GC-BERLUM DEVELOPMENT CO was the GC but not longer is-now its Kate (the parcel owner)
|
BLD-Aging Inspection | 5/30/2019 | 5/30/2019 | 5/30/2019 | | NR |
Jim Storey
|
|
|
per 480 Need blower door...
|
BLD-Final | 5/24/2019 | 5/28/2019 | 5/29/2019 | P | NR |
Brandon Shaw
|
|
|
Need blower door...
|
BLD-Framing/Rough-in | 1/14/2019 | 1/15/2019 | 1/15/2019 | A | PASS |
Jim Storey
|
|
|
James Phone #: ###-####
|
BLD-Energy code compliance | 1/15/2019 | 1/15/2019 | 1/15/2019 | A | PASS |
Jim Storey
|
|
|
James Phone #: ###-####
|
BLD-Framing/Rough-in | 1/11/2019 | 1/14/2019 | 1/14/2019 | A | PART |
Jim Storey
|
|
|
James Phone #: ###-####
|
BLD-Framing/Rough-in | 1/10/2019 | 1/11/2019 | 1/11/2019 | A | PART |
Jim Storey
|
|
|
James Phone #: ###-#### c/n posted// bolts for 4 ply mlb/calk for 2-2x6 header 51 inch supporting 4 ply mlb./ finsh hardware and nailling/fireblk unsuable spaces. ok to insulate.
|
Plan Modification Accepted | | | 1/7/2019 | | DONE |
|
|
|
New manual j report
|
Routing - MECHANICAL | 1/7/2019 | | 1/7/2019 | | PASS |
Troy James
|
|
|
Resubmitted manual j report
|
BLD-Wall Bracing | 11/26/2018 | 11/26/2018 | 11/26/2018 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Arrow Tallman
|
BLD-Wall Bracing | 11/21/2018 | 11/26/2018 | 11/26/2018 | A | NR |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Arrow Tallman
|
BLD-Footing | 10/3/2018 | 10/4/2018 | 10/4/2018 | A | PASS |
Jim Sly
|
|
|
Pouring at 2:30, requesting late morning - Rowdy Phone #: ###-####
|
Issue PAID IN FULL permit | | | 9/26/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/26/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 9/25/2018 | | |
|
|
|
|
Plan assigned to (J_N) | 9/5/2018 | 9/5/2018 | 9/25/2018 | | DONE |
|
|
|
09/12 sfd L1 ePlan.2nd review 9/18 PFH length too short, end condition braced wall line 4. 1st review complete 9/12, patio beams, WUI soffit detail and materials, pier footings, bracing end conditions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/25/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/25/2018 | | DONE |
|
|
|
Need
RP (emailed GC)
|
Routing - PLAN CHECK | 9/24/2018 | | 9/24/2018 | | PASS |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 9/18/2018 | | 9/18/2018 | | FAIL |
Brian McGowan
|
|
|
As per Jenny, more wall bracing info required.
|
1st review completed | | | 9/12/2018 | | FAIL |
|
|
|
Patio beams, WUI soffit detail, WUI materials, pier footing, bracing end conditions
|
Routing - PLAN CHECK | 8/30/2018 | | 9/12/2018 | | FAIL |
Brian McGowan
|
|
|
|
Plan assigned to (BJM) | 8/30/2018 | 8/30/2018 | 9/5/2018 | | DEFR |
Brian McGowan
|
|
|
09/12 sfd L1 ePlan
|
Routing - MECHANICAL | 8/30/2018 | | 9/4/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Route to Impact Fee Review | 8/30/2018 | 9/2/2018 | 8/31/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 8/30/2018 | | 8/30/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 8/30/2018 | | 8/30/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/30/2018 | | 8/30/2018 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/30/2018 | | DONE |
|
|
|
|
Intake Approval | | | 8/30/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/30/2018 | | DONE |
|
|
|
|
Application received | | | 8/21/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 21 2018 2:21PM
|