BLD-Final | 8/20/2019 | 8/20/2019 | 8/20/2019 | A | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 8/20/2019 | 8/20/2019 | 8/20/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/16/2019 | 8/16/2019 | 8/20/2019 | | PEND |
Dave Hannah
|
|
|
|
Plan assigned to (JG) | 9/10/2018 | 9/10/2018 | 10/1/2018 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 9/21 L2 ATT Antenna ePlan, pend DR
|
Routing - PLAN CHECK | 9/29/2018 | | 10/1/2018 | | PASS |
Javier Guzman
|
|
|
|
Routing - Design Review | 9/29/2018 | | 10/1/2018 | | PASS |
KayCee Babb
|
|
|
Due to low visual impact, DR manager has approved project without Design Review being required.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/1/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/1/2018 | | DONE |
|
|
|
Need - all met 10/1/18 C_P
GC Form
Revised Cert of Value
email to Lorelei - lforonda@md7.com
|
Issue PAID IN FULL permit | | | 10/1/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/1/2018 | | DONE |
|
|
|
|
Routing - Design Review | 9/26/2018 | | 9/26/2018 | | PASS |
KayCee Babb
|
|
|
Alteration does not cause significant visual changes and does not require DR approval, per Design Review Manager.
|
Route to Impact Fee Review | 9/19/2018 | 9/22/2018 | 9/20/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 9/19/2018 | | DONE |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 9/10/2018 | | 9/19/2018 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLANNING | 9/10/2018 | | 9/11/2018 | | PASS |
Nicolette Womack
|
|
|
|
Routing - Design Review | 9/10/2018 | | 9/11/2018 | | FAIL |
KayCee Babb
|
|
|
Design Review required for proposed project due to exterior alterations and addition of antennas.
|
Intake Approval | | | 9/10/2018 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 9/5/2018 | | FAIL |
Brian McGowan
|
|
|
1. Engineering must be updated to current Boise City Codes. See Sheet 1 of the SSOE documents under Analysis Criteria. This is the Engineering in the Document Folder. Analysis Criteria must be done under the 2015 IBC, not the 2012 IBC.
|
Intake Approval | | | 8/29/2018 | | FAIL |
Brian McGowan
|
|
|
Please correct the following items :
1. Engineering must be updated to current Boise City Codes. See Sheet 1 of the SSOE documents under Analysis Criteria.
2. The sheets uploaded should be named exactly as the sheet it is replacing so it will "Version" over, replace, that sheet as V2.
3. Several sheets are numbered the same ( A0.4, A0.5....) They should be numbered differently. You can use the actual sheet number if you wish with a description behind it (E-101 RF Plumbing Diagrams for example). I can delete files you specify once it comes back to me if needed.
|
Intake Approval | | | 8/22/2018 | | FAIL |
Brian McGowan
|
|
|
Please correct the following items :
1. Add the Page numbers where the items can be located on the submittal checklist.
2. Code Analysis needs to be updated to current Boise City Codes.
3. Verify the site address- Address on the application is for E. Park Boulevard. The Site Plan and Vicinity map show W. Caesar Chavez Lane. Update plans to match.
4. Site Plan needs to show building, Streets and location on the property (see checklist).
5. Engineering must be updated to current Boise City Codes.
|
Application received | | | 8/21/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 21 2018 2:42PM
|
First Notice | 8/20/2019 | 8/20/2019 | | | |
Dave Hannah
|
|
|
|