Permit Information
Permit NumberBLD18-03041
StatusFinaled
Name WRIGHT BROTHERS THE BLDG CO EAGLE
Site Address 3930 W STATE ST
Project NameEinstein's Oilery
Customer Number 
ePlanReviewYes
Description
(EINSTEIN’S OILERY) Permit to construct a new single story 1,439 sq. ft. building (with a 368 sq. ft. mezzanine and a 1,299 sq. ft. basement) for auto repair use and related site improvements. Approval is contingent upon adhering to the approved plans on file, attached engineering and plan review report. Scope of work includes: construction of footing foundation, concrete basement walls, concrete slab floor, engineered floor joist at mezzanine, construction of 2x exterior envelope walls, pre-engineered roof trusses, metal roof assembly, stairway, construction of interior nonbearing walls in the basement to create a storage room, a mechanical room and a restroom, construction of interior nonbearing on the main floor to create a storage room a service area and an accessible restroom, construction of interior nonbearing at the mezzanine to create an office, millwork, gypsum ceiling, light fixtures, electrical work, plumbing work, mechanical work and interior finishes to be in compliance with Ch. 8 of the current IBC. Note: Special inspection required see attached 310 form. This building is Not Fire Sprinklered. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  11/27/2019 DONE
1ST NOTICE
Print Statement  11/6/2019 DONE
Second Notice 8/15/20199/20/2019 DONE
mailed 9-23-19
First Notice 7/25/20198/5/2019 DONE
mailed 8-6-19
Permanent Occupancy  7/15/2019 DONE
BLD-Final6/19/20196/19/20196/19/2019PPASS
DetailsTony Young
Josh Phone #: ###-####
Zoning Approval6/17/20196/17/20196/17/2019 PASS
DetailsKatelyn Menuge
Telephone call  6/17/2019 DONE
Matt emailed in the temp
C of O sign off card but the building final had not been done so i emailed him back and told him once the building final inspection wasa requested and passed he can email the sign off card back in to permits@cityofboise.org
Temporary Occupancy6/7/20199/5/20196/7/2019 DONE
DetailsJudith Amador
PubWorks Occupancy Approval6/7/20196/7/20196/7/2019 DONE
DetailsTiffany Lowery
Zoning Approval Temp6/7/20196/7/20196/7/2019 PASS
DetailsKatelyn Menuge
Will finalize landscape by 6-12-19. All plant materials on site.
BLD-Final6/6/20196/6/20196/6/2019PPART
DetailsTony Young
for Temp CO Phone #: ###-#### Inspection requested via web by Josh Strasser,, temp. occupancy ok
FIRE-Final Inspection6/4/20196/5/20196/5/2019APASS
DetailsJim Page
No fire sprinklers, no fire alarms, fire extinguishers are placed with current inspection tags, addressing will be installed when received. Final life fire safety inspection complete.

Josh Phone #: ###-####
BLD-Wall cover4/17/20194/18/20194/18/2019APASS
DetailsJim Sly
Anchor bolts (2) installed
Beam to wall has strap ontop of wall and beam
Shear locations (2) nailed Phone #: ###-#### Inspection requested via web by Josh Strasser
all Framing.....OK.
BLD-Framing/Rough-in4/16/20194/16/20194/16/2019PPART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Josh Strasser,, ok to insulate pending trades
BLD-Wall Bracing4/5/20194/5/20194/5/2019PPASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Josh Strasser,, exterior ok
BLD-Concrete2/28/20193/1/20193/1/2019APART
DetailsTony Young
Concrete pour is at 11:00 AM Phone #: ###-#### Inspection requested via web by Josh Strasser,, slab work,, SI report
BLD-Foundation2/5/20192/8/20192/8/2019APART
DetailsTony Young
Concrete scheduled for 12:30 PM Phone #: ###-#### Inspection requested via web by Josh Strasser,, ok pending special inspection report
BLD-Footing2/5/20192/8/20192/8/2019APEND
DetailsTony Young
This was poured and inspected by All West Inspections Phone #: ###-#### Inspection requested via web by Josh Strasser,, pending special inspection report
Print Occupancy Form  1/18/2019 DONE
Issue PAID IN FULL permit  11/28/2018 DONE
emailed Jeff LIkes the permits to be signed-JSTRASSER@WBTBC.COM wanted them so also emailed them to him for signatures
Print Occupancy Form  11/28/2018 DONE
OVERRIDE  11/7/2018  
OVERRIDE  11/7/2018  
Plan assigned to (JG)8/29/20188/29/201811/7/2018 PASS
DetailsJavier Guzman
1st rev comp, 09/28 Einsteins Oilery
CHANGE STATUS TO (FEE)  11/7/2018 DONE
changed out of ready status until changemarks resolved and batch stamp is complete
Permit Ready to Issue  11/7/2018 DONE
ALL MET-NEED
ACHD
RP
GC FORM
REVISED VALUE
Routing - PLAN CHECK11/6/2018 11/7/2018 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  11/7/2018 DONE
Permit Ready to Issue  11/7/2018 DONE
MET JSTRASSER@WBTBC.COM
Need
GC Form
Revised Cert of Value
MET
RP
ACHD
Routing - PLAN CHECK11/1/2018 11/5/2018 FAIL
DetailsJavier Guzman
Routing - Design Review11/1/2018 11/1/2018 PASS
DetailsKatelyn Menuge
Routing PW Sewer Design11/1/2018 11/1/2018 PASS
DetailsDeAnn Brown
Routing - PLAN CHECK10/18/2018 10/24/2018 FAIL
DetailsJavier Guzman
Routing Off Site - STRUCTURAL10/18/2018 10/24/2018 PASS
DetailsJavier Guzman
signed off in ePlan by KPFF Cory Harelson

Routing PW Sewer Design10/18/2018 10/24/2018 FAIL
DetailsDeAnn Brown
Changemarks from first review were not addressed. Please refer to changemarks in eplanreview for corrections required.
Routing - PUBLIC WORKS10/24/2018 10/24/2018 PASS
DetailsBrian Murphy
Routing - Design Review10/18/2018 10/18/2018 FAIL
DetailsKatelyn Menuge
Bike racks cannot obstruct pedestrian path.
Route to Impact Fee Review10/9/201810/12/201810/11/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - FIRE8/29/20188/29/201810/9/2018 PASS
DetailsErika Akin
Attached comments to case
1st review completed  10/9/2018 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK8/29/2018 10/2/2018 FAIL
DetailsJavier Guzman
Routing Off Site - STRUCTURAL8/29/2018 9/21/2018 FAIL
DetailsJavier Guzman
Failed in ePlan by KPFF Cory Harelson
Routing PW Environmental8/29/2018 9/6/2018 PASS
DetailsRick Christenson
Routing PW Sewer Design8/29/2018 9/5/2018 FAIL
DetailsDeAnn Brown
Update demolition plan and utility plan per PW Sewer changemarks in eplanreview.
Routing PW Street Lights8/29/2018 9/5/2018 PASS
DetailsTom Marshall
Routing PW Drainage8/29/2018 9/5/2018 PASS
DetailsBrian Murphy
Routing - MECHANICAL8/29/2018 9/4/2018 PASS
DetailsTroy James
Routing - PLUMBING8/29/2018 9/4/2018 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - Addressing8/29/2018 8/30/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS8/29/2018 8/30/2018 PASS
DetailsRachael Beierle
Routing - Design Review8/29/2018 8/30/2018 FAIL
DetailsKatelyn Menuge
DRH18-00091 See changemarks for required modifications to site, landscape, lighting.
Routing PW Solid Waste8/29/2018 8/30/2018 PASS
DetailsEvan Carpenter
Routing - Erosion and Sediment8/29/2018 8/29/2018 PASS
DetailsMichael Zawacki
RP needed prior to any site work relating to new building.
ESC has been issued for demo ESC18-01064 for daystar excavation and demolition work.
Routing - PLANNING8/29/2018 8/29/2018 PASS
DetailsNicolette Womack
Work with Design Review regarding planter widths.
Intake Approval  8/27/2018 PASS
Intake Approval  8/22/2018 FAIL
DetailsBrian McGowan
Please provide the following information for your prescreen to be approved:
1. Form #310 must be completely filled out.
2. Show the location of fire hydrants on the Site Plan. Or indicate how far from the proposed site they are located.
3. Your Drainage Plan is proposing a seepage pit. Please provide a completed "Shallow Injection Well Inventory" form.
4. Hazardous Material Inventory and Classification Report. Provide quantities and types of hazardous materials to be used/stored on site.
5. Please show Accessibility clearances on the floor plan.
6. No Sheet E3.2 was provided.
Application received  8/21/2018 DONE
Application submitted via PDS Online on Aug 21 2018 3:25PM