BLD-Final | 4/29/2019 | 4/30/2019 | 4/30/2019 | A | PASS |
Dave Hannah
|
|
|
Les Phone #: ###-####
|
DOC - Permit Finaled | 4/30/2019 | 4/30/2019 | 4/30/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Blower Door Test Results | 4/30/2019 | 4/30/2019 | 4/30/2019 | A | PASS |
Dave Hannah
|
|
|
3.1
|
PubWorks Occupancy Approval | 1/29/2019 | 1/29/2019 | 1/29/2019 | | DONE |
Melissa Jannusch
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Energy code compliance | 1/16/2019 | 1/16/2019 | 1/16/2019 | P | PASS |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
BLD-Framing/Rough-in | 1/11/2019 | 1/11/2019 | 1/11/2019 | P | PASS |
Brandon Shaw
|
|
|
OK to insulate...
|
BLD-Ceiling Grid Inspection | 1/2/2019 | 1/3/2019 | 1/3/2019 | A | PASS |
Brandon Shaw
|
|
|
Soffit
|
BLD-Wall Bracing | 12/6/2018 | 12/6/2018 | 12/6/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress... Floor to floor straps to be installed before framing rough-in...
|
BLD-Foundation | 10/19/2018 | 10/19/2018 | 10/19/2018 | P | PART |
Tony Young
|
|
|
edger Phone #: ###-####,, work in progress,, ok after adding to missed footings, tie with rebar
|
BLD-Footing | 10/18/2018 | 10/18/2018 | 10/18/2018 | P | PART |
Tony Young
|
|
|
Edgar Phone #: ###-####,, work in progress, ok
|
PubWorks Subgrade Approval | 10/15/2018 | 10/15/2018 | 10/15/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 10/4/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/4/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 9/27/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 8/27/2018 | 8/27/2018 | 9/27/2018 | | DONE |
Rob Patrick
|
|
|
09/13 sfd L2 ePlan...9/14 Failed for Braced Wall Tables. 9/27 Failed: confirm 2x10 header for loading
|
Routing - PLAN CHECK | 9/27/2018 | | 9/27/2018 | | FAIL |
Rob Patrick
|
|
|
Confirm 2x10 header for loading on sht S1.1
|
Routing - PLAN CHECK | 9/27/2018 | | 9/27/2018 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/27/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 9/27/2018 | | DONE |
|
|
|
|
1st review completed | | | 9/14/2018 | | FAIL |
Rob Patrick
|
|
|
Brace Wall tables need changed.
|
Routing - PLAN CHECK | 8/27/2018 | | 9/14/2018 | | FAIL |
Rob Patrick
|
|
|
Braced Wall tables need changed
|
Routing - FIRE | 8/27/2018 | 8/27/2018 | 9/6/2018 | | PASS |
Tim Frost
|
|
|
New SFH ePlan
Fire Sprinkers are being provided.
|
Route to Impact Fee Review | 8/27/2018 | 8/30/2018 | 8/28/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 8/27/2018 | | 8/28/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing PW Grading-Hillside | 8/27/2018 | | 8/28/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing - MECHANICAL | 8/27/2018 | | 8/28/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 8/27/2018 | | 8/27/2018 | | PASS |
Colleen T Carroll
|
|
|
|
Intake Approval | | | 8/27/2018 | | FAIL |
|
|
|
only satisfied 1 of the 5 items required for intake
|
Plans ACCEPTED BY PLAN TECH | | | 8/27/2018 | | DONE |
|
|
|
|
Intake Approval | | | 8/27/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/27/2018 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 8/27/2018 | | 8/27/2018 | | PASS |
Michael Zawacki
|
|
|
Foothills lot, site prep inspection required.
|
Routing - PUBLIC WORKS | 8/27/2018 | | 8/27/2018 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 8/22/2018 | | FAIL |
|
|
|
Missing
Cross section/full wall details
|
Application received | | | 8/21/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 21 2018 4:15PM
|