Permit NumberBLD18-03043
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 2313 S TRAPPER PL
Project NameHN 22-1
Customer Number 
ePlanReviewYes
Description
W.U.I. Zone A. Class A Roof Required. Permit for the construction of a new 3597 sq. ft., two story (first story 1894 sq. ft., second story 1703 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 272 sq. ft. of covered patio/porch and a 846 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. SP-01 zoning and setbacks per planning. ***RDP***

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/29/20194/30/20194/30/2019APASS
DetailsDave Hannah
Les Phone #: ###-####
DOC - Permit Finaled4/30/20194/30/20194/30/2019PPASS
DetailsDave Hannah
BLD-Blower Door Test Results4/30/20194/30/20194/30/2019APASS
DetailsDave Hannah
3.1
PubWorks Occupancy Approval1/29/20191/29/20191/29/2019 DONE
DetailsMelissa Jannusch

A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.

BLD-Energy code compliance1/16/20191/16/20191/16/2019PPASS
DetailsBrandon Shaw
Les Phone #: ###-####
BLD-Framing/Rough-in1/11/20191/11/20191/11/2019PPASS
DetailsBrandon Shaw
OK to insulate...
BLD-Ceiling Grid Inspection1/2/20191/3/20191/3/2019APASS
DetailsBrandon Shaw
Soffit
BLD-Wall Bracing12/6/201812/6/201812/6/2018PPASS
DetailsBrandon Shaw
Work in progress...
Floor to floor straps to be installed before framing rough-in...
BLD-Foundation10/19/201810/19/201810/19/2018PPART
DetailsTony Young
edger Phone #: ###-####,, work in progress,, ok after adding to missed footings, tie with rebar
BLD-Footing10/18/201810/18/201810/18/2018PPART
DetailsTony Young
Edgar Phone #: ###-####,, work in progress, ok
PubWorks Subgrade Approval10/15/201810/15/201810/15/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

Issue PAID IN FULL permit  10/4/2018 DONE
Inspection Record Card- Bld  10/4/2018 DONE
OVERRIDE  9/27/2018  
Plan assigned to (RDP)8/27/20188/27/20189/27/2018 DONE
DetailsRob Patrick
09/13 sfd L2 ePlan...9/14 Failed for Braced Wall Tables. 9/27 Failed: confirm 2x10 header for loading
Routing - PLAN CHECK9/27/2018 9/27/2018 FAIL
DetailsRob Patrick
Confirm 2x10 header for loading on sht S1.1
Routing - PLAN CHECK9/27/2018 9/27/2018 PASS
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  9/27/2018 DONE
DetailsRob Patrick
Permit Ready to Issue  9/27/2018 DONE
1st review completed  9/14/2018 FAIL
DetailsRob Patrick
Brace Wall tables need changed.
Routing - PLAN CHECK8/27/2018 9/14/2018 FAIL
DetailsRob Patrick
Braced Wall tables need changed
Routing - FIRE8/27/20188/27/20189/6/2018 PASS
DetailsTim Frost
New SFH ePlan

Fire Sprinkers are being provided.
Route to Impact Fee Review8/27/20188/30/20188/28/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - Addressing8/27/2018 8/28/2018 PASS
DetailsDoug Chausow
Routing PW Grading-Hillside8/27/2018 8/28/2018 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Routing - MECHANICAL8/27/2018 8/28/2018 PASS
DetailsTroy James
Routing - PLANNING8/27/2018 8/27/2018 PASS
DetailsColleen T Carroll
Intake Approval  8/27/2018 FAIL
only satisfied 1 of the 5 items required for intake
Plans ACCEPTED BY PLAN TECH  8/27/2018 DONE
Intake Approval  8/27/2018 PASS
Recd Pcfee & Taken To Pln CK  8/27/2018 DONE
Routing - Erosion and Sediment8/27/2018 8/27/2018 PASS
DetailsMichael Zawacki
Foothills lot, site prep inspection required.
Routing - PUBLIC WORKS8/27/2018 8/27/2018 PASS
DetailsMorgan Webb
Intake Approval  8/22/2018 FAIL
Missing
Cross section/full wall details
Application received  8/21/2018 DONE
Application submitted via PDS Online on Aug 21 2018 4:15PM