BLD-Final | 5/9/2019 | 5/13/2019 | 5/13/2019 | A | FAIL |
Mike Jordan
|
|
|
Tiffany Phone #: ###-####. Needs zoning final. Provide ADA required grab bars/mirror and install boot under sink. Install the additional handrail on stairs. main doors- either remove harware on inactive leaf or make single action hardware. Bottom of glass guardrails exceeds the 4 inch gap. Also provide engineering showing glass guards meet the minimum required lineal fdt.lbs. Correction notice issued.
|
BLD-Conference | 5/10/2019 | 5/13/2019 | 5/13/2019 | A | DONE |
Mike Jordan
|
|
|
Tiffany Phone #: ###-####
|
FIRE-Final Inspection | 5/9/2019 | 5/10/2019 | 5/10/2019 | P | FAIL |
Troy Cobbley
|
|
|
Mount the fire extinguishers as discussed, provide single action hardware as discussed and marked on the plans, provide missing exit sign, contact plan review about the second floor wall/door that is not shown on the plans. Provide sticker at the main exit. Phone #: ###-####
|
BLD-Framing/Rough-in | 2/4/2019 | 2/4/2019 | 2/4/2019 | P | PASS |
Mike Jordan
|
|
|
Tiffany Phone #: ###-####. Mezzanine framing ok.
|
BLD-Framing/Rough-in | 1/17/2019 | 1/17/2019 | 1/17/2019 | P | NR |
Mike Jordan
|
|
|
Tiffany Phone #: ###-####. Needs MEPS. first.
|
BLD-Footing | 12/7/2018 | 12/7/2018 | 12/7/2018 | P | PASS |
Mike Jordan
|
|
|
Tiffany Phone #: ###-####
|
BLD-Footing | 12/6/2018 | 12/7/2018 | 12/7/2018 | A | NR |
Mike Jordan
|
|
|
Tiffany ###-####. Will recall when ready.
|
Telephone call | | | 12/7/2018 | | DONE |
|
|
|
called GC to see if they would sign the building permit-she will come down after inspection and sign permit. 12/7/18 CAN signed and in docs
|
(F) Reprint permit | | | 12/6/2018 | | DONE |
|
|
|
need GC to sign permit - I had Architect sign so emailed to GC to sign another one for me so we have the correct signature on file
|
Issue PAID IN FULL permit | | | 11/26/2018 | | DONE |
|
|
|
emailed permit to be signed to Jeff Likes
|
Print Occupancy Form | | | 11/26/2018 | | DONE |
|
|
|
|
Plan assigned to (JHB) | 8/29/2018 | 8/29/2018 | 10/25/2018 | | PASS |
Joe Bruce
|
|
|
(4th Rev Comp) - 09/24 (L3) - Overland Barn L-3 (Struc)
|
Routing Off Site - STRUCTURAL | 10/24/2018 | | 10/25/2018 | | PASS |
Joe Bruce
|
|
|
Chris Holladay - AHJ Engineers
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/25/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/25/2018 | | DONE |
|
|
|
email permit to tdacustomdesignco@q.com
|
Routing Off Site - STRUCTURAL | 10/23/2018 | | 10/24/2018 | | FAIL |
Joe Bruce
|
|
|
Chris Holladay - AHJ
|
Plan resubmittals requested | | | 10/24/2018 | | FAIL |
Joe Bruce
|
|
|
Need additional information for structural detail. **JHB**
|
Plan resubmittals received | | | 10/24/2018 | | DONE |
Joe Bruce
|
|
|
|
Plan resubmittals requested | | | 10/23/2018 | | FAIL |
Joe Bruce
|
|
|
|
Plan resubmittals received | | | 10/23/2018 | | DONE |
Joe Bruce
|
|
|
Received A0.1 from architect. **JHB**
|
Routing Off Site - STRUCTURAL | 10/15/2018 | | 10/23/2018 | | FAIL |
Joe Bruce
|
|
|
Chris Holladay - AHJ - Additional information request on structural. -See changemarks on 2nd Review. **JHB**
|
Routing - PLAN CHECK | 10/15/2018 | | 10/22/2018 | | PASS |
Joe Bruce
|
|
|
|
Routing - Design Review | 10/15/2018 | | 10/19/2018 | | PASS |
Katelyn Menuge
|
|
|
|
Plan resubmittals received | | | 10/15/2018 | | DONE |
Joe Bruce
|
|
|
|
Route to Impact Fee Review | 9/25/2018 | 9/28/2018 | 9/26/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 8/29/2018 | 8/29/2018 | 9/25/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
1st review completed | | | 9/25/2018 | | FAIL |
Joe Bruce
|
|
|
|
Plan resubmittals requested | | | 9/25/2018 | | DONE |
Joe Bruce
|
|
|
Emailed architect plan review report. **JHB**
|
Routing - PLAN CHECK | 8/29/2018 | | 9/25/2018 | | FAIL |
Joe Bruce
|
|
|
|
Routing Off Site - STRUCTURAL | 8/29/2018 | | 9/11/2018 | | FAIL |
Joe Bruce
|
|
|
|
Routing - Addressing | 8/29/2018 | | 8/30/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/29/2018 | | 8/30/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Design Review | 8/29/2018 | | 8/30/2018 | | FAIL |
Katelyn Menuge
|
|
|
See changemarks regarding site plan and retaining wall.
|
Routing - PLANNING | 8/29/2018 | | 8/29/2018 | | PASS |
Nicolette Womack
|
|
|
Retaining wall in the rear setback shall remain under 6' in exposed height.
|
Intake Approval | | | 8/28/2018 | | PASS |
|
|
|
|
Intake Approval | | | 8/23/2018 | | FAIL |
Joe Bruce
|
|
|
Please submit the following information for prescreen approval:
1) Plans must have an architectural stamp and signature by an Idaho licensed architect.
2) Structural plans must be stamped and signed by and Idaho licensed engineer.
3) Structural calculations must be stamped and signed by and Idaho licensed engineer.
|
Application received | | | 8/22/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 22 2018 3:07PM
|