BLD-Final | 7/10/2019 | 7/11/2019 | 7/11/2019 | A | PASS |
Brandon Shaw
|
|
|
Ethan Phone #: ###-####
|
DOC - Permit Finaled | 7/11/2019 | 7/11/2019 | 7/11/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 7/11/2019 | 7/11/2019 | 7/11/2019 | A | DONE |
Brandon Shaw
|
|
|
ACH 50- 3.5
|
PubWorks Occupancy Approval | 7/9/2019 | 7/9/2019 | 7/9/2019 | | DONE |
Jason C. Taylor
|
|
|
Recieved all floodplain requirements. JCT
|
Elevation Cert Rec'd-Final | | | 7/9/2019 | | DONE |
|
|
|
Recieved Final Elevation Certificate. JCT
|
BLD-Energy code compliance | 4/12/2019 | 4/12/2019 | 4/12/2019 | P | PASS |
Dave Hannah
|
|
|
Nate Phone #: ###-####
|
BLD-Framing/Rough-in | 4/9/2019 | 4/10/2019 | 4/10/2019 | A | PART |
Dave Hannah
|
|
|
Nate Phone #: ###-#### ok to insulate but needs to fire block fur downs and fur outsand above fire place
|
Elevation Cert Rec'd-Midconst | | | 4/9/2019 | | DONE |
|
|
|
Recieved EC #2. Framing inspection may be scheduled. JCT
|
Routing PW Flood Plain | 4/9/2019 | | 4/9/2019 | | PASS |
Jason C. Taylor
|
|
|
Recieved EC #2
|
BLD-Framing/Rough-in | 4/8/2019 | 4/9/2019 | 4/8/2019 | A | CANC |
Dave Hannah
|
|
|
Nate Phone #: ###-####
Nate cancel this inspection, needs more time to be make it ready.
|
BLD-Framing/Rough-in | 4/3/2019 | 4/4/2019 | 4/5/2019 | P | NR |
Dave Hannah
|
|
|
Nate Phone #: ###-#### needs flood plan cert
|
BLD-Wall Bracing | 3/13/2019 | 3/14/2019 | 3/14/2019 | A | PART |
Dave Hannah
|
|
|
Cory Phone #: ###-#### second floor ok ground floor ok but needs to nail type3 install holddowns and floor to floor stapes
|
BLD-Foundation | 1/2/2019 | 1/3/2019 | 1/3/2019 | P | PASS |
Dave Hannah
|
|
|
Willy Phone #: ###-####
|
BLD-Footing | 12/28/2018 | 12/31/2018 | 12/31/2018 | A | PASS |
Dave Hannah
|
|
|
Willie Phone #: ###-#### footing are covered and heaters running ok to place concrete
|
BLD-Footing | 12/27/2018 | 12/28/2018 | 12/28/2018 | A | FAIL |
Dave Hannah
|
|
|
Willie Phone #: ###-#### ground is frozen
|
BLD-Foundation | 12/7/2018 | 12/7/2018 | 12/10/2018 | P | PART |
Dave Hannah
|
|
|
wall // Sergio Phone #: ###-#### crew will cover and heat
|
BLD-Footing | 11/21/2018 | 11/21/2018 | 11/21/2018 | P | PART |
Brandon Shaw
|
|
|
Retaining walls...
|
Issue PAID IN FULL permit | | | 11/5/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 11/1/2018 | | |
|
|
|
|
Plan assigned to (J_N) | 10/5/2018 | 10/5/2018 | 11/1/2018 | | DONE |
Jenny Nelson
|
|
|
10/18 sfd L1 ePlan. 1st review done 10/18, 2nd story wall bracing plan, code year, engineering for steel beams and columns
|
Routing - PLAN CHECK | 11/1/2018 | | 11/1/2018 | | PASS |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/1/2018 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 11/1/2018 | | DONE |
|
|
|
NEED RP
|
1st review completed | | | 10/18/2018 | | FAIL |
Jenny Nelson
|
|
|
2nd story wall bracing plan, code year, engineering for steel beams and columns
|
Routing - PLAN CHECK | 10/5/2018 | | 10/18/2018 | | FAIL |
Jenny Nelson
|
|
|
|
Routing PW Flood Plain | 10/8/2018 | | 10/11/2018 | | PASS |
Jason C. Taylor
|
|
|
NOTE:
Two Elevation Certificates will be required; one prior to any vertical construction, and one based upon finished construction. These certificates will need to be reviewed and approved by Public Works staff prior to framing/occupancy approval. Jason Taylor ###-####
|
Route to Impact Fee Review | 10/5/2018 | 10/8/2018 | 10/8/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 10/5/2018 | | 10/8/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 10/5/2018 | | 10/8/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - MECHANICAL | 10/5/2018 | | 10/8/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 10/5/2018 | | 10/5/2018 | | PASS |
Brent Moore
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/5/2018 | | DONE |
|
|
|
|
Intake Approval | | | 10/5/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/5/2018 | | DONE |
|
|
|
|
Intake Approval | | | 10/2/2018 | | FAIL |
|
|
|
nothing has changed-still need CFH permit to pass
|
Intake Approval | | | 9/25/2018 | | FAIL |
|
|
|
still need approval letter for CFH18-00090. As of today it still shows FAILED
|
Intake Approval | | | 9/13/2018 | | FAIL |
|
|
|
CFH18-00090 failed intake-need approval letter for floodplain in the docs before we can approve intake
|
Intake Approval | | | 9/5/2018 | | FAIL |
|
|
|
CFH18-00090 (floodplain development application) must be approved and approval letter uploaded to documents folder prior to acceptance of building permit application.
|
Intake Approval | | | 9/4/2018 | | FAIL |
|
|
|
all code years need to be 2015 IRC, drawing file names (A1.0 Floor plan) and need elevation cert for floodplain.
|
Application received | | | 8/23/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 23 2018 8:28AM
|
Intake Approval | | | 8/23/2018 | | FAIL |
|
|
|
need prescrip or res check-plans are drawn to the wrong code
|