BLD-Aging Inspection | 2/7/2020 | 2/7/2020 | 2/7/2020 | | PASS |
Tell Riley
|
|
|
WIP
|
BLD-Final | 12/17/2019 | 12/18/2019 | 12/18/2019 | A | NR |
Tell Riley
|
|
|
Call for access- Cory Phone #: ###-####//exterior incomplete-need mech inspection for wood stove//
|
BLD-Framing/Rough-in | 9/25/2019 | 9/26/2019 | 9/26/2019 | A | PASS |
Tell Riley
|
|
|
Cory Phone #: ###-####//shear corrections made//framing ok//
|
BLD-Wall Bracing | 6/18/2019 | 6/18/2019 | 6/18/2019 | P | PART |
Tell Riley
|
|
|
add shear blocks//finish truss bracing//call for framing.//
|
BLD-Framing/Rough-in | 6/14/2019 | 6/18/2019 | 6/18/2019 | P | CANC |
Tell Riley
|
|
|
Cory Phone #: ###-####//change to wall bracing//
|
BLD-Wall cover | 6/14/2019 | 6/18/2019 | 6/18/2019 | P | PART |
Tell Riley
|
|
|
Cory Phone #: ###-####//ok to cover exterior once shear blocks have been installed//
|
BLD-Footing | 9/24/2018 | 9/26/2018 | 9/26/2018 | A | PASS |
Jim Sly
|
|
|
call when you on your way- Cory Phone #: ###-#### Mono pour footing and slab......OK.
|
OVERRIDE | | | 8/23/2018 | | |
|
|
|
|
Routing Walk-In (Zoning) | 8/23/2018 | 8/23/2018 | 8/23/2018 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 8/23/2018 | 8/23/2018 | 8/23/2018 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 8/23/2018 | | 8/23/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 8/23/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 8/23/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 8/23/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/23/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 8/23/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/23/2018 | | DONE |
|
|
|
|
Application received | | 8/23/2018 | | | |
|
|
|
|