BLD-Final | 11/26/2018 | 11/27/2018 | 11/27/2018 | A | PASS |
Brandon Shaw
|
|
|
Jim Phone #: ###-####
|
DOC - Permit Finaled | 11/27/2018 | 11/27/2018 | 11/27/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Footing | 9/20/2018 | 9/21/2018 | 9/21/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: 2088703686 >> Inspection requested via mobile web by Jim Schmidt
|
PubWorks Subgrade Approval | 9/20/2018 | 9/20/2018 | 9/20/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 9/18/2018 | 9/19/2018 | 9/19/2018 | P | FAIL |
Brandon Shaw
|
|
|
Need subgrade submitted and approved by PW...
|
OVERRIDE | | | 8/29/2018 | | |
|
|
|
|
Routing Walk-In (BLD) | 8/29/2018 | 8/29/2018 | 8/29/2018 | P | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 8/27/2018 | 8/27/2018 | 8/29/2018 | | PASS |
Josh Bogle
|
|
|
08/31 pool, paper
|
Routing - PLAN CHECK | 8/28/2018 | | 8/29/2018 | | PASS |
Josh Bogle
|
|
|
|
Issue PAID IN FULL permit | | | 8/29/2018 | | DONE |
|
|
|
|
1st review completed | | | 8/29/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 8/29/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 8/29/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/29/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 8/29/2018 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 8/27/2018 | | 8/28/2018 | | PASS |
Michael Zawacki
|
|
|
Waiver approved
|
Routing Walk-In (Zoning) | 8/27/2018 | 8/27/2018 | 8/27/2018 | P | DONE |
Nicolette Womack
|
|
|
|
Routing Walk-In (BLD) | 8/27/2018 | 8/27/2018 | 8/27/2018 | P | PASS |
Josh Bogle
|
|
|
took in as a level two - routed
|
Routing PW Grading-Hillside | 8/27/2018 | | 8/27/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling inspections. Please allow 24 hours for subgrade approval processing. If you have any questions call Melissa Jannusch ###-####.
|
Application received | | 8/23/2018 | | | |
|
|
|
|