Second Notice | | 2/17/2019 | 3/8/2019 | | DONE |
|
|
|
This permit finaled on the web by Will Thomason
|
First Notice | | 1/21/2019 | 2/7/2019 | | DONE |
|
|
|
mailed 2-11-19
|
BLD-Final | 1/11/2019 | 1/11/2019 | 1/11/2019 | P | PASS |
Mike Jordan
|
|
|
Will Phone #: ###-####. Ok for prm occ.
|
Permanent Occupancy | | | 1/11/2019 | | DONE |
|
|
|
|
BLD-Final | 1/9/2019 | 1/9/2019 | 1/9/2019 | P | PEND |
Brandon Shaw
|
|
|
Need MECh final... Temp C. of O. is OK...
|
FIRE-Final Inspection | 1/8/2019 | 1/9/2019 | 1/9/2019 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 1/4/2019 | 1/7/2019 | 1/7/2019 | A | FAIL |
Jim Page
|
|
|
Could not find city approved drawings, emergency illumination for exit discharge needs to be installed on main entry on the north side as well as desiganted exit on the south side. Fire extinguisher needs to be inspected and tagged as well as lowered to below 48 inches to be code compliant.
Phone #: ###-#### Inspection requested via web by Will Thomason
|
BLD-Final | 1/4/2019 | 1/7/2019 | 1/7/2019 | P | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Will Thomason
|
BLD-Ceiling Grid Inspection | 12/28/2018 | 12/28/2018 | 12/28/2018 | P | PASS |
Brandon Shaw
|
|
|
Will Phone #: ###-####
|
BLD-Framing/Rough-in | 11/19/2018 | 11/20/2018 | 11/20/2018 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Will Thomason. Inteior steel stud framed walls only ok.
|
BLD-Framing/Rough-in | 11/19/2018 | 11/19/2018 | 11/19/2018 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Will Thomason. Needs to provide the city approved plans.
|
Print Occupancy Form | | | 10/29/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/29/2018 | | |
|
|
|
|
Plan assigned to (JAR) | 9/1/2018 | 9/1/2018 | 10/15/2018 | | DONE |
Julie Romig
|
|
|
10/19 - 4th Rev - 1st Rev Comp - L3 Golftech
|
Routing - PLAN CHECK | 10/15/2018 | | 10/15/2018 | | PASS |
Julie Romig
|
|
|
|
Routing - Design Review | 10/15/2018 | | 10/15/2018 | | PASS |
Katelyn Menuge
|
|
|
Per KayCee CZC18-00237
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/15/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/15/2018 | | DONE |
|
|
|
Need- all met
GC Form
Revised Cert of Value
(DO NOT ISSUE WITHOUT BLD18-03690)
|
Routing - PLAN CHECK | 10/8/2018 | | 10/10/2018 | | PASS |
Julie Romig
|
|
|
Passed pending design review approval.
|
Routing - Design Review | 10/8/2018 | | 10/8/2018 | | FAIL |
Katelyn Menuge
|
|
|
Please submit proposal for meeting DR conditions to Design Review Planner KayCee Babb (kbabb@cityofboise.org) and obtain approval prior to resubmitting for building permit.
|
Routing - PLAN CHECK | 10/2/2018 | | 10/6/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing - Design Review | 10/2/2018 | | 10/2/2018 | | FAIL |
Katelyn Menuge
|
|
|
Submit proposal for storefront graphics to Design Review per Zoning Certificate conditions.
|
Route to Impact Fee Review | 9/29/2018 | 10/2/2018 | 10/1/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 9/29/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | 9/1/2018 | | 9/29/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing - FIRE | 9/1/2018 | 9/1/2018 | 9/28/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing - PLANNING | 9/1/2018 | | 9/26/2018 | | PASS |
Katelyn Menuge
|
|
|
No review required.
|
Routing - Design Review | 9/26/2018 | | 9/26/2018 | | FAIL |
Katelyn Menuge
|
|
|
Update sheets to show north correctly. A Zoning Certificate is required prior to building permit issuance.
|
Routing - Addressing | 9/1/2018 | | 9/4/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 9/1/2018 | | 9/4/2018 | | PASS |
Rachael Beierle
|
|
|
|
Plan Reviewer's activity | | | 9/1/2018 | | DONE |
|
|
|
Katie, as this is a change in use for this space please contact ACHD to verify if any impact fees are due an provide documentation of fees due or not. If ACHD fees are due provide a receipt of fees paid or fees can be paid at the time of permit issuance. Building permits cannot be issued without documentation of fees or that no fees are due.
|
Intake Approval | | | 8/28/2018 | | PASS |
|
|
|
|
Intake Approval | | | 8/24/2018 | | FAIL |
Joe Bruce
|
|
|
This prescreen has failed due to the following:
1.Drawing files must be uploaded individually and follow the electronic plan submittal standards.
2.Complete and upload form #520 – Major TI Submittal Checklist
3.Provide site specific fire flow at hydrants letter from Suez Water or other public water provider.
4.Provide a key plan on the plans showing the tenant space location within the existing building.
5.Show exit signs and emergency lighting locations on plans.
6.Show portable fire extinguisher locations on plans.
7.Provide mechanical plans if new unit(s) are being installed.
8.Show exhaust fan locations, CFM, for restroom.
|
Application received | | | 8/23/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 23 2018 3:46PM
|