Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-03091
StatusFinaled
Name NORTHWEST POWER SYSTEMS
Site Address 6893 S SUPPLY WAY
Project NameNorthwest Power Systems
Customer Number 
ePlanReviewNo
Description
**(NORTHWEST POWER SYSTEMS)** Application for inspection to determine requirements for issuance of a Certificate of Occupancy for a 4,000 sq. ft. existing tenant space previously occupied by “Access Van” under BLD08-00011. NO NEW WORK IS AUTHORIZED UNDER THIS PERMIT. There will be no change to the occupancy. This building is Not Fire Sprinklered**JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  2/4/2019 DONE
BLD-Conference2/1/20192/1/20192/1/2019PPASS
DetailsJim Storey
Vicki Phone #: ###-####
BLD-Final2/1/20192/1/20192/1/2019PPASS
DetailsJim Storey
Vicki Phone #: ###-####
FIRE-Final Inspection1/31/20191/31/20191/31/2019PPASS
DetailsJim Page
Previously noted items have been corrected, final life fire safety inspection complete. Noted that main entry has thumbturn deadbolt on door.

Mark Phone #: ###-####
FIRE-Final Inspection1/29/20191/30/20191/30/2019AFAIL
DetailsJim Page
Fire extinguishers need to be inspected and tagged with a current inspection tag, last inspection on extinguisher tags was 2015. Slide bolt on rear door of warehouse needs to be removed. Install addressing on building with a minimum of 4 inches tall, 1/2 inch wide numbering as discussed to be code compliant.

Mark Phone #: ###-####
BLD-Final1/29/20191/30/20191/30/2019PCANC
DetailsJim Storey
Mark Phone #: ###-#### cancel per Mark fire lift didn't pass
Issue PAID IN FULL permit  1/29/2019 DONE
Expiration Notice1/24/20192/14/20191/24/2019 DONE
DetailsBrittany Hill
Plan assigned to (JG)8/24/20188/24/20188/29/2018 PASS
DetailsJavier Guzman
8/30 L2 Northwest Power Systems Paper Occ Eval
Routing - PLAN CHECK8/28/2018 8/29/2018 PASS
DetailsJavier Guzman
Case Summary (BLD)  8/29/2018 DONE
DetailsJavier Guzman
1st review completed  8/29/2018 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  8/29/2018 DONE
Permit Ready to Issue  8/29/2018 DONE
Print Occupancy Form  8/29/2018 DONE
Telephone call  8/29/2018 DONE
Spoke with Mark informing him that this permit is ready and one of the techs will go over the required inspections when he comes in
Routing - FIRE8/24/20188/24/20188/28/2018 PASS
DetailsErika Akin
No work to be done under this permit. No change of use or occupancy. No comments attached. Inspector to field verify fire extinguishers and life safety.
Routing PW Environmental8/24/2018 8/28/2018 PASS
DetailsRick Christenson
Routing - PUBLIC WORKS8/24/2018 8/28/2018 PASS
DetailsRachael Beierle
Routing - Addressing8/24/2018 8/24/2018 PASS
DetailsDoug Chausow
Plans ACCEPTED BY PLAN TECH  8/24/2018 DONE
Recd Pcfee & Taken To Pln CK  8/24/2018 DONE
Intake Approval  8/24/2018 PASS
per JG
Application received 8/24/2018