Permit Information
Permit NumberBLD18-03097
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 5849 E HOOTOWL DR
Project NameSUN VALLEY HN 60-1
Customer Number 
ePlanReviewYes
Description
***PRESCRIPTIVE COMPONENT ENERGY APPROACH***WUI ZONE A REQUIREMENTS*** Permit for the construction of a new 3191 sq. ft., one story single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 323 sq. ft. of covered patio/porch and a 824 sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning. MDH

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/24/20194/24/20194/24/2019PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
DOC - Permit Finaled4/24/20194/24/20194/24/2019PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results4/24/20194/24/20194/24/2019PDONE
DetailsBrandon Shaw
ACH50- 3.89
PubWorks Occupancy Approval4/24/20194/24/20194/24/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.

BLD-Final3/11/20193/11/20193/11/2019PNR
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Kyle Seick no public works sign off to allow final insp.
BLD-Final3/7/20193/8/20193/8/2019ANR
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Kyle Seick needs mec final first
BLD-Other1/9/20191/9/20191/9/2019PPASS
DetailsBrandon Shaw
Soffit Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Energy code compliance1/2/20191/3/20191/3/2019PPASS
DetailsBrandon Shaw
Corrections SAT...
BLD-Framing/Rough-in12/31/201812/31/201812/31/2018PFAIL
DetailsBrandon Shaw
Per plans- (2) 9 1/2 LVL's required at bearing wall header, Master closet...
Break in double top plates, bearing wall, Master closet...
Need Engineering approval for A3 truss, bottom cord broken...
Truss engineering packet frozen, not able to review any pages...
BLD-Wall Bracing12/3/201812/3/201812/3/2018PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Foundation10/25/201810/25/201810/25/2018PPASS
DetailsBrandon Shaw
Work in progress
BLD-Foundation10/25/201810/25/201810/25/2018ACANC
DetailsBrandon Shaw
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
BLD-Footing10/24/201810/24/201810/24/2018PPASS
DetailsBrandon Shaw
Work in progress
PubWorks Subgrade Approval10/17/201810/17/201810/17/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

OVERRIDE  10/3/2018  
Issue PAID IN FULL permit  10/3/2018 DONE
Inspection Record Card- Bld  10/3/2018 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/3/2018 DONE
DetailsMichael Hanson
Permit Ready to Issue  10/3/2018 DONE
Met
Plan assigned to (M_H)9/7/2018 10/3/2018 DONE
DetailsMichael Hanson
09/12 #404 L2 ePlan. 1st review completed - Fire flow letter required. MDH
Routing - PLAN CHECK9/12/2018 10/3/2018 PASS
DetailsMichael Hanson
Routing - FIRE10/2/201810/2/201810/2/2018 PASS
DetailsTim Frost
Routing - FIRE9/19/20189/19/20189/19/2018 FAIL
DetailsTim Frost
Please, show the WUI defensible zone on the drawings,
1st review completed  9/12/2018 DONE
DetailsMichael Hanson
Routing - PLAN CHECK8/24/2018 9/12/2018 FAIL
DetailsMichael Hanson
Need fire flow letter. MDH
Plan assigned to (BJM)8/24/20188/24/20189/7/2018 DEFR
DetailsBrian McGowan
09/12 sfd L2 ePlan
Routing - FIRE8/24/20188/24/20189/5/2018 FAIL
DetailsTim Frost
New SFH ePlan

A fire flow availability letter is required from the water purveyor.
Routing PW Grading-Hillside8/24/2018 8/28/2018 PASS
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Route to Impact Fee Review8/24/20188/27/20188/27/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - Erosion and Sediment8/24/2018 8/27/2018 PASS
DetailsMichael Zawacki
Foothills lot, site prep inspection required.
Application received  8/24/2018 DONE
Application submitted via PDS Online on Aug 24 2018 12:03PM
Plans ACCEPTED BY PLAN TECH  8/24/2018 DONE
Intake Approval  8/24/2018 PASS
Recd Pcfee & Taken To Pln CK  8/24/2018 DONE
Routing - MECHANICAL8/24/2018 8/24/2018 PASS
DetailsTroy James
Routing - PLANNING8/24/2018 8/24/2018 PASS
DetailsSue Cummings
Routing - Addressing8/24/2018 8/24/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS8/24/2018 8/24/2018 PASS
DetailsMorgan Webb