Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD18-03098
StatusIssued
Name NORTHERN CONSTRUCTION LLC
Site Address 825 N TROUTNER WAY
Project NameKissler Residence
Customer Number 
ePlanReviewYes
Description
*** PLAN MODIFICATION 5-29-19 - GRADING PLAN MODIFICATION-CAT II ***HILLSIDE, WUI FOOTHILLS, ZONE "A" REQUIREMENTS, CLASS "A" ROOF REQUIRED, FIRE SPRINKLERS REQUIRED, SPECIAL INSPECTIONS REQUIRED. DEFERRED SUBMITTALS APPROVED FOR INTERIOR STAIRWAY AND RAILING SYSTEM (90 DAYS) AND FOR WELD DESIGN CALCULATIONS (WITHIN 14 DAYS) OF ISSUANCE OF PERMIT. Permit for the construction of a new 8,389 sq. ft., two story (first story 5,972 sq. ft., second story 1,668sq. ft., below grade 747 sq. ft.) single family dwelling with 3 bedrooms, 4 and a half bathrooms, approximately 267 sq. ft. of covered patio/porch and a 5,866-sq. ft. attached garage per the approved plans and any notations. R-1B zoning and setbacks per planning. Prescriptive Energy Code proposed. ***BJM***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/11/20205/12/20205/12/2020APASS
DetailsBrandon Shaw
Garage Code # 2891
Certificate of Occupancy - House Phone #: ###-#### Inspection requested via web by Tammy Schacher
BLD-Final5/1/20205/1/20205/1/2020PFAIL
DetailsBrandon Shaw
No approved plans or permit found on site...
Address to be readily visable...
Per 308.4.5- Glazing and wet sufaces- bathroom 1, tub area to be tempered...
Per 314.3 Smoke alarms- to be outside each seperate sleeping area in the immediate vicinity of the bedroom...
PubWorks Occupancy Approval4/29/20204/29/20204/29/2020 DONE
DetailsMelissa Jannusch
*Main House Only* A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Aging Inspection1/10/20201/10/20201/10/2020 DEFR
DetailsBrandon Shaw
Extend Permit 90/180 days1/10/20201/10/20201/10/2020PDONE
DetailsBrandon Shaw
BLD-Wall cover8/28/20198/29/20198/29/2019APASS
DetailsDave Hannah
Contact Joey 208.859.8173 to meet inspector Phone #: ###-#### Inspection requested via web by Gary Schacher
BLD-Energy code compliance8/28/20198/29/20198/29/2019APASS
DetailsDave Hannah
Contact Joey 208.859.8173 to meet inspector Phone #: ###-#### Inspection requested via web by Gary Schacher
BLD-Framing/Rough-in8/28/20198/29/20198/29/2019APASS
DetailsDave Hannah
Contact Joey 208.859.8173 to meet inspector Phone #: ###-#### Inspection requested via web by Gary Schacher
BLD-Framing/Rough-in7/30/20197/31/20197/31/2019APASS
DetailsBrandon Shaw
B03 truss, need Engineering approval...
OK to insulate...
BLD-Framing/Rough-in7/25/20197/26/20197/26/2019ANR
DetailsDave Hannah
Contact Joey 208.859.8173 to meet inspector on site Phone #: ###-#### Inspection requested via web by Gary Schacher
CHANGE STATUS TO (ISS)  6/11/2019 DONE
plan mod
Inspection Record Card- Bld  6/11/2019 DONE
OVERRIDE  6/3/2019  
Plan assigned to (BJM)1/3/20191/3/20196/3/2019 DONE
DetailsBrian McGowan
05/23 -Plan Mod - Hillside
Routing - PLAN CHECK5/16/2019 6/3/2019 PASS
DetailsBrian McGowan
plan mod- grade notations changed around home, no structure was modified. See Hillside
Permit Ready to Issue  6/3/2019 DONE
Plan mod fee-do not issue
Routing PW Grading-Hillside5/16/2019 5/31/2019 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Routing - PLANNING5/16/2019 5/20/2019 PASS
DetailsCeline Acord
Routing - PUBLIC WORKS5/16/2019 5/16/2019 PASS
DetailsMorgan Webb
CHANGE STATUS TO (REV)  5/13/2019 DONE
Not sure why it was changed to Issued. There is a plan mod that is being done.
BLD-Wall Bracing4/4/20194/5/20194/5/2019APASS
DetailsBrandon Shaw
Contact Joey 208.859.8173 to meet inspector on site. Phone #: ###-#### Inspection requested via web by Gary Schacher
MISC ACTIONS  1/7/2019 FAIL
Failed Plan Mod intake - need Cat ll for plan mod as it's for grading and has significant changes- see Melissa's notes
Plan Modification Accepted  1/3/2019 DONE
Updating grading plans
BLD-Foundation12/17/201812/18/201812/18/2018APEND
DetailsDave Hannah
wall-Jared Phone #: ###-#### ok but needs geo tec report for upper ftgs
BLD-Footing12/11/201812/12/201812/12/2018APASS
DetailsBrandon Shaw
Work in progress
BLD-Foundation11/16/201811/16/201811/16/2018PPASS
DetailsDave Hannah
Jared Phone #: ###-####
BLD-Foundation11/13/201811/14/201811/14/2018APART
DetailsDave Hannah
Jared Phone #: ###-#### part two of basement wall ok to pour
BLD-Foundation11/13/201811/13/201811/13/2018PNR
DetailsTony Young
Jared Phone #: ###-####
BLD-Foundation11/6/201811/6/201811/6/2018PPASS
DetailsDave Hannah
Jared Phone #: ###-#### basement wall south side
BLD-Footing10/29/201810/30/201810/30/2018APASS
DetailsDave Hannah
Jared Phone #: ###-####
PubWorks Subgrade Approval10/30/201810/30/201810/30/2018 DONE
DetailsMelissa Jannusch
Baasement footings. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
Issue PAID IN FULL permit  10/3/2018 DONE
Inspection Record Card- Bld  10/3/2018 DONE
OVERRIDE  10/1/2018  
Plan assigned to (BJM)8/30/20188/30/201810/1/2018 DONE
DetailsBrian McGowan
09/18 sfd L2 ePlan-1st Review Complete, Corrections Required.
Routing PW Grading-Hillside10/1/2018 10/1/2018 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call ###-#### to schedule an inspection.

PLANS/APPL TAKEN TO FRONT DESK  10/1/2018 DONE
DetailsBrian McGowan
Permit Ready to Issue  10/1/2018 DONE
Routing - PLAN CHECK9/28/2018 9/28/2018 PASS
DetailsBrian McGowan
DEFERRED SUBMITTALS APPROVED FOR INTERIOR STAIRWAY AND RAILING SYSTEM (90 DAYS) AND FOR WELD DESIGN CALCULATIONS (WITHIN 14 DAYS) OF ISSUANCE OF PERMIT.
Routing - FIRE9/26/20189/26/20189/26/2018 PASS
DetailsTim Frost
1st review completed  9/21/2018 FAIL
DetailsBrian McGowan
Routing - PLAN CHECK8/30/2018 9/21/2018 FAIL
DetailsBrian McGowan
Routing - FIRE8/30/20188/30/20189/14/2018 FAIL
DetailsTim Frost
New SFH ePlan

Please, see attached review.
Routing PW Grading-Hillside8/30/2018 9/7/2018 FAIL
DetailsMelissa Jannusch
1. The sand window for the swale will need to extend 7’ below ground surface per the geotechnical report update letter
2. Show foundation drain outlet location and piping
Routing - MECHANICAL8/30/2018 9/5/2018 PASS
DetailsTroy James
Mechanical engineered plans
Route to Impact Fee Review8/30/20189/2/20188/31/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - PLANNING8/30/2018 8/31/2018 PASS
DetailsCeline Acord
per CFH18-00041
Routing - Addressing8/30/2018 8/30/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS8/30/2018 8/30/2018 PASS
DetailsMorgan Webb
Routing - Erosion and Sediment8/30/2018 8/30/2018 PASS
DetailsMichael Zawacki
Site prep inspection required. Due to site being over 1 acre it will need an EPA NOI in addition to Boise City permit.
Plans ACCEPTED BY PLAN TECH  8/30/2018 DONE
Intake Approval  8/30/2018 PASS
Recd Pcfee & Taken To Pln CK  8/30/2018 DONE
Intake Approval  8/28/2018 FAIL
-CFH approval letter
-Spray Foam Insulation details
-MEC plans stamped by an MEC engineer or Manual J.
(-The report update/site suitability letter from MTI dated July 2, 2018
Melissa Jannusch ###-####)
Application received  8/24/2018 DONE
Application submitted via PDS Online on Aug 24 2018 12:27PM