BLD-Final | 2/25/2019 | 2/25/2019 | 2/25/2019 | P | PASS |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
DOC - Permit Finaled | 2/25/2019 | 2/25/2019 | 2/25/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 2/25/2019 | 2/25/2019 | 2/25/2019 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 2.34
|
PubWorks Occupancy Approval | 1/15/2019 | 1/15/2019 | 1/15/2019 | | DONE |
Melissa Jannusch
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Energy code compliance | 11/30/2018 | 11/30/2018 | 11/30/2018 | P | PASS |
Brandon Shaw
|
|
|
OK to cover
|
BLD-Framing/Rough-in | 11/30/2018 | 11/30/2018 | 11/30/2018 | P | CANC |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Energy code compliance | 11/27/2018 | 11/28/2018 | 11/28/2018 | A | CANC |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
BLD-Framing/Rough-in | 11/27/2018 | 11/28/2018 | 11/28/2018 | A | PASS |
Brandon Shaw
|
|
|
As per plans, (2) 9 1/2 LVL header needed at master closet... OK to insulate
|
BLD-Other | 11/21/2018 | 11/23/2018 | 11/23/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Wall Bracing | 10/29/2018 | 10/30/2018 | 10/30/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Foundation | 10/4/2018 | 10/4/2018 | 10/4/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Foundation | 10/3/2018 | 10/3/2018 | 10/3/2018 | A | NR |
Brandon Shaw
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Footing | 10/3/2018 | 10/3/2018 | 10/3/2018 | A | CANC |
Brandon Shaw
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Footing | 10/2/2018 | 10/2/2018 | 10/2/2018 | A | PASS |
Jim Storey
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Footing | 10/1/2018 | 10/1/2018 | 10/1/2018 | P | NR |
Brandon Shaw
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
PubWorks Subgrade Approval | 9/28/2018 | 9/28/2018 | 9/28/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 9/18/2018 | | |
|
|
|
|
Plan assigned to (J_N) | 8/31/2018 | 8/31/2018 | 9/18/2018 | | DONE |
|
|
|
09/7 sfd L1 ePlan. 1st review complete 9/5 structural deficiencies, roof trusses, shear wall,
|
Routing - PLAN CHECK | 9/18/2018 | | 9/18/2018 | | PASS |
Michael Hanson
|
|
|
Per JJN review. MDH
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/18/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/18/2018 | | DONE |
|
|
|
met
|
Issue PAID IN FULL permit | | | 9/18/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/18/2018 | | |
|
|
|
|
Routing - FIRE | 9/10/2018 | 9/10/2018 | 9/10/2018 | | PASS |
Tim Frost
|
|
|
See review and alternate letter
|
Routing - FIRE | 8/27/2018 | 8/27/2018 | 9/5/2018 | | FAIL |
Tim Frost
|
|
|
New SFH ePlan
See Review
|
1st review completed | | | 9/5/2018 | | FAIL |
|
|
|
Roof structural deficiencies, shear wall calculations, retaining wall
|
Routing - PLAN CHECK | 8/27/2018 | | 9/5/2018 | | FAIL |
Rob Patrick
|
|
|
Corrections Required
|
Plan assigned to (RDP) | 8/27/2018 | 8/27/2018 | 8/31/2018 | | DEFR |
Rob Patrick
|
|
|
9/7 sfd L1 ePlan
|
Route to Impact Fee Review | 8/27/2018 | 8/30/2018 | 8/28/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing PW Grading-Hillside | 8/27/2018 | | 8/28/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing - MECHANICAL | 8/27/2018 | | 8/27/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 8/27/2018 | | 8/27/2018 | | PASS |
Sue Cummings
|
|
|
Keep the projections on the garage no more than 2 ft.
|
Routing - Addressing | 8/27/2018 | | 8/27/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/27/2018 | | 8/27/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 8/27/2018 | | 8/27/2018 | | PASS |
Michael Zawacki
|
|
|
Foothills lot, site prep inspection required.
|
Plans ACCEPTED BY PLAN TECH | | | 8/27/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/27/2018 | | DONE |
|
|
|
|
Intake Approval | | | 8/27/2018 | | PASS |
|
|
|
|
Application received | | | 8/24/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 24 2018 1:30PM
|
Intake Approval | | | 8/24/2018 | | FAIL |
|
|
|
NEED
FIRE FLOW LETTER FROM SUEZ
ESC PLAN
SOIL AND GEOTECH REPORT
|