Second Notice | | 4/18/2019 | 4/22/2019 | | DONE |
|
|
|
This permit finaled on the web by Clayn Sonderegger
|
First Notice | 3/20/2019 | 3/20/2019 | 4/8/2019 | | DONE |
Mike Jordan
|
|
|
mailed 4-11-19
|
BLD-Final | 3/20/2019 | 3/20/2019 | 3/20/2019 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 3/20/2019 | 3/20/2019 | 3/20/2019 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 3/18/2019 | 3/19/2019 | 3/19/2019 | P | PEND |
Mike Jordan
|
|
|
Ask for Stacie at the front desk. Plans are on the shelf by the new foundation Phone #: ###-#### Inspection requested via web by Clayn Sonderegger. Structural final ok. Will fianl when public works finals, mech and electrical finals.
|
FIRE-Final Inspection | 3/18/2019 | 3/18/2019 | 3/18/2019 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 3/14/2019 | 3/15/2019 | 3/15/2019 | A | FAIL |
Jim Page
|
|
|
Waiting for verification of class 1 wiring and need suppression permit finaled.
Ask for Aaron or Mike at the front desk when you arrive. Phone #: ###-#### Inspection requested via web by Clayn Sonderegger
|
FIRE-Final Inspection | 3/13/2019 | 3/14/2019 | 3/14/2019 | P | FAIL |
Troy Cobbley
|
|
|
Waiting for verification of class 1 wiring and need suppression permit finaled.
|
FIRE-Final Inspection | 3/4/2019 | 3/5/2019 | 3/5/2019 | A | FAIL |
Troy Cobbley
|
|
|
See the city approved notes for items marked that need corrected. Items included exhaust clearance from hvac intake, 3' housekeeping clearance, signage, class 1 electrical and ventilation interlock.....ect.
Plans are on-site. Ask for Stacie at the front desk. Phone #: ###-#### Inspection requested via web by Clayn Sonderegger
|
BLD-Energy code compliance | 2/14/2019 | 2/15/2019 | 2/15/2019 | A | PASS |
Jim Sly
|
|
|
Plans are on rack by new foundation. Ask for Stacie at the front desk. We infilled the ceiling and exterior walls with insulation. Phone #: ###-#### Inspection requested via web by Clayn Sonderegger
|
BLD-Final | 2/14/2019 | 2/15/2019 | 2/15/2019 | A | NR |
Jim Sly
|
|
|
Plans are on rack by new foundation. Ask for Stacie at the front desk. We infilled the ceiling and exterior walls with insulation. Ready for final. Phone #: ###-#### Inspection requested via web by Clayn Sonderegger Talked to Clayn.........Gave him the list ......For finals to be completed, prior to calling for Structural final.
|
BLD-Foundation | 1/28/2019 | 1/29/2019 | 1/29/2019 | A | PASS |
Mike Jordan
|
|
|
We have concrete scheduled for 1:00pm. We should have the rebar in place by 10:00am. We do have MTI scheduled for rebar and cylinders, if required. This inspection is for one column footing. Phone #: ###-#### Inspection requested via web by Clayn Sonderegger
|
Inspection Record Card- Bld | | | 1/16/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/16/2019 | | DONE |
|
|
|
emailed curtis@brsarchitects.com (GC doens't have an email on file) to see if he'll have the GC sign and send back the permit
|
Plan assigned to (JHB) | 9/4/2018 | 9/4/2018 | 11/13/2018 | | PASS |
Joe Bruce
|
|
|
*(2nd Rev Comp) 09/18 (L2) - VibraPro2 ePlan (Struc)
|
Routing Off Site - STRUCTURAL | 11/5/2018 | | 11/13/2018 | | PASS |
Joe Bruce
|
|
|
AHJ - Dave Haugland
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/13/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/13/2018 | | DONE |
|
|
|
MET clayn@benchmarkconstruction.com
NEED
GC FORM
REVISED VALUE
|
Plan resubmittals received | | | 11/5/2018 | | DONE |
Joe Bruce
|
|
|
Received additional structural information. **JHB**
|
Routing - FIRE | 10/10/2018 | 10/10/2018 | 10/24/2018 | | PASS |
Erika Akin
|
|
|
Attached revised comments to case
|
Plan resubmittals requested | | | 10/24/2018 | | FAIL |
Joe Bruce
|
|
|
Returned to applicant in Eplan. Need Structural info. **JHB**
|
Routing Off Site - STRUCTURAL | 10/10/2018 | | 10/22/2018 | | FAIL |
Joe Bruce
|
|
|
AHJ Engineers - Dave Haugland
|
Routing - Design Review | 10/10/2018 | | 10/10/2018 | | PASS |
Katelyn Menuge
|
|
|
DRH18-00259
|
Plan resubmittals received | | | 10/9/2018 | | DONE |
|
|
|
|
Route to Impact Fee Review | 9/19/2018 | 9/22/2018 | 9/19/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 9/4/2018 | 9/4/2018 | 9/19/2018 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
1st review completed | | | 9/19/2018 | | DONE |
Joe Bruce
|
|
|
|
Plan resubmittals requested | | | 9/19/2018 | | DONE |
Joe Bruce
|
|
|
|
Routing - PLAN CHECK | 9/4/2018 | | 9/19/2018 | | PASS |
Joe Bruce
|
|
|
|
Routing Off Site - STRUCTURAL | 9/4/2018 | | 9/17/2018 | | FAIL |
Joe Bruce
|
|
|
Dave Haugland - AHJ Engineers
|
Routing - Design Review | 9/4/2018 | | 9/4/2018 | | FAIL |
Katelyn Menuge
|
|
|
Screening of new mechanical/rooftop equipment is required.
|
Routing - MECHANICAL | 9/4/2018 | | 9/4/2018 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 9/4/2018 | | 9/4/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 9/4/2018 | | 9/4/2018 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 8/30/2018 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 8/27/2018 | | FAIL |
Joe Bruce
|
|
|
To complete your application, provide the following:
1. Provide Planning & Zoning Letters of approval
2. Architectural plans must be stamped and signed by an Architect.
3. Provide portable fire extinguisher locations on the plans
4. Provide form #310 Statement of Special Inspections form completed by structural engineer.
5. Each plan must have a space reserved for City approval stamps as specified in the "Electronic Plan Review Submittal Standards" document.
6. Sheet M2 denotes flammable storage cabinets. Please submit a list identifying all expected quantities of hazardous / flammable materials to be stored for this use.
|
Intake Approval | | | 8/27/2018 | | FAIL |
Joe Bruce
|
|
|
To complete your application, provide the following:
1. Provide Planning & Zoning Letters of approval
2. Architectural plans must be stamped and signed by an Architect.
3. Provide portable fire extinguisher locations on the plans
4. Provide form #310 Statement of Special Inspections form completed by structural engineer.
5. Each plan must have a space reserved for City approval stamps as specified in the "Electronic Plan Review Submittal Standards" document.
6. Sheet M2 denotes flammable storage cabinets. Please submit a list identifying all expected quantities of hazardous / flammable materials to be stored for this use.
Thank you,
Joe Bruce
|
Application received | | | 8/24/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 24 2018 2:11PM
|
Zoning Approval | 1/31/2019 | 1/31/2019 | | | PASS |
|
|
|
No inspection required.
|