BLD-Final | 10/16/2019 | 10/16/2019 | 10/16/2019 | P | PASS |
Tell Riley
|
|
|
PAT Phone #: ###-####//trades finals complete//signatures required complete//final complete//archtect approved alternate on type a unit//
|
Zoning Approval | 10/16/2019 | 10/16/2019 | 10/16/2019 | | PASS |
Katelyn Menuge
|
|
|
|
Permanent Occupancy | | | 10/16/2019 | | |
|
|
|
|
BLD-Final | 10/14/2019 | 10/15/2019 | 10/15/2019 | P | CANC |
Tell Riley
|
|
|
Pat Phone #: ###-####
|
PubWorks Occupancy Approval | 10/14/2019 | 10/14/2019 | 10/14/2019 | | DONE |
Tiffany Lowery
|
|
|
|
Temporary Occupancy | 8/23/2019 | 11/21/2019 | 8/23/2019 | | DONE |
Brittany Hill
|
|
|
|
Meeting | | | 8/23/2019 | | DONE |
|
|
|
per candy temp gave ok on temp. full occupancy will be granted once ALL BUILDING finals has been completed
|
BLD-Final | 8/20/2019 | 8/21/2019 | 8/21/2019 | A | PART |
Tell Riley
|
|
|
Matt Phone #: ###-####//final 12 units walk through//still need plan review approval of architects change to type A unit///
ok for temp c of o once we get changes architure
|
FIRE-Final Inspection | 8/19/2019 | 8/21/2019 | 8/21/2019 | A | PASS |
Troy Cobbley
|
|
|
life safety passed.
Matt Phone #: ###-####
|
Zoning Approval Temp | 8/21/2019 | 8/21/2019 | 8/21/2019 | | DONE |
Andrea Tuning
|
|
|
|
FIRE-Hydro test above ground | 8/20/2019 | 8/20/2019 | 8/20/2019 | P | FAIL |
Troy Cobbley
|
|
|
One pendant sprinkler head needs adjusted in the second floor, west side, south end apartment.
|
BLD-Final | 8/20/2019 | 8/20/2019 | 8/20/2019 | P | CANC |
Tell Riley
|
|
|
Matt Phone #: ###-####//cancel per Matt//
|
BLD-Final | 8/15/2019 | 8/16/2019 | 8/16/2019 | A | PART |
Tell Riley
|
|
|
Matt Phone #: ###-####//105,106,205,206,305,306//ok for temp occupancy//get plan review approval on letter of type A unit from architect//
|
BLD-Final | 8/5/2019 | 8/5/2019 | 8/5/2019 | P | PART |
Tell Riley
|
|
|
Matt Phone #: ###-####//first six units temp occupancy ok//
|
FIRE-Final Inspection | 8/2/2019 | 8/5/2019 | 8/5/2019 | A | PART |
Troy Cobbley
|
|
|
The second group (six) of apartments to the north of the central breeze way life safety is passed. Matt Phone #: ###-####
|
BLD-Final | 7/26/2019 | 7/29/2019 | 7/29/2019 | A | NR |
Tell Riley
|
|
|
Matt Phone #: ###-####//need final plumbing on units 107,108,207,208,307,308//
|
BLD-Final | 7/22/2019 | 7/23/2019 | 7/23/2019 | A | FAIL |
Tell Riley
|
|
|
Bill Phone #: ###-####//7's and 8's// see list onsite for corrections//
|
FIRE-Final Inspection | 7/22/2019 | 7/22/2019 | 7/22/2019 | P | PART |
Troy Cobbley
|
|
|
Life safety is passed for the six north nmost apartments. Bill Phone #: ###-####
|
PubWorks Temp Occupancy Appr | 7/18/2019 | 7/18/2019 | 7/18/2019 | | DONE |
Tiffany Lowery
|
|
|
|
Print Occupancy Form | | | 6/18/2019 | | DONE |
|
|
|
|
BLD-Energy code compliance | 6/6/2019 | 6/6/2019 | 6/6/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Energy code compliance | 6/5/2019 | 6/5/2019 | 6/5/2019 | P | NR |
Mike Jordan
|
|
|
Bill Phone #: ###-####
|
BLD-Framing/Rough-in | 6/4/2019 | 6/4/2019 | 6/4/2019 | P | PART |
Tony Young
|
|
|
Bill Phone #: ###-####,, ok to insulate only. check truss bracing and fire penetrations at energy.
|
BLD-Energy code compliance | 5/24/2019 | 5/24/2019 | 5/24/2019 | P | PASS |
Jim Sly
|
|
|
Bill Phone #: ###-####
|
BLD-Framing/Rough-in | 5/23/2019 | 5/23/2019 | 5/23/2019 | P | PASS |
Jim Sly
|
|
|
Bill Phone #: ###-####
|
BLD-Energy code compliance | 5/10/2019 | 5/10/2019 | 5/10/2019 | P | PART |
Jim Sly
|
|
|
Bill Phone #: ###-#### OK for 6 units listed on prior inspection
|
BLD-Framing/Rough-in | 5/9/2019 | 5/9/2019 | 5/9/2019 | P | PASS |
Jim Sly
|
|
|
Bill-6 units-105,205,305,106,206,306 Phone #: ###-####
|
BLD-Energy code compliance | 4/26/2019 | 4/26/2019 | 4/26/2019 | P | PART |
Dave Hannah
|
|
|
Bill Phone #: ###-#### first six units
|
BLD-Framing/Rough-in | 4/24/2019 | 4/24/2019 | 4/24/2019 | P | PASS |
Jim Sly
|
|
|
Bill- inspection for units 107, 108, 207, 208, 308 Phone #: ###-####
|
Meeting | | | 4/22/2019 | | DONE |
|
|
|
Chad S. emailed me to delete 20 manual J docs in the approved folder and upload 9 new manual j's into the approved folder-so i did-emailed Tisha to see if we had to assess a fee
|
BLD-Wall Bracing | 4/11/2019 | 4/12/2019 | 4/15/2019 | A | PASS |
Jim Sly
|
|
|
Bill Phone #: ###-####
|
BLD-Conference | 3/26/2019 | 3/27/2019 | 3/27/2019 | A | CANC |
Jim Sly
|
|
|
Bill Phone #: ###-####
|
BLD-Foundation | 2/4/2019 | 2/4/2019 | 2/4/2019 | P | PASS |
Jim Sly
|
|
|
Dane Phone #: ###-####
|
BLD-Foundation | 1/30/2019 | 1/31/2019 | 2/1/2019 | P | PART |
Tony Young
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 1/29/2019 | 1/30/2019 | 1/30/2019 | P | PASS |
Jim Sly
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 1/28/2019 | 1/28/2019 | 1/28/2019 | P | PART |
Brandon Shaw
|
|
|
BLDG A... Work in progress...
|
Issue PAID IN FULL permit | | | 1/25/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/25/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 1/18/2019 | | |
|
|
|
|
Plan assigned to (JAR) | 9/26/2018 | 9/26/2018 | 1/18/2019 | | DONE |
Julie Romig
|
|
|
1st Rev Comp - 2nd Rev Comp - 506 Fairview Apartments Bldg 1
|
Routing - PLAN CHECK | 1/18/2019 | | 1/18/2019 | | PASS |
Julie Romig
|
|
|
|
Routing PW Street Lights | 1/18/2019 | | 1/18/2019 | | PASS |
Tom Marshall
|
|
|
Street Lights will be tracked on BLD18-03485.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/18/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/18/2019 | | DONE |
|
|
|
all met-NEED
GC form
Rev cert of val
|
Routing Off Site - STRUCTURAL | 1/10/2019 | | 1/17/2019 | | PASS |
Julie Romig
|
|
|
AHJ
|
Routing - PLAN CHECK | 1/10/2019 | | 1/17/2019 | | FAIL |
Julie Romig
|
|
|
|
Routing - PLANNING | 1/10/2019 | | 1/11/2019 | | PASS |
Susan Riggs
|
|
|
|
Route to Impact Fee Review | 11/13/2018 | 11/16/2018 | 11/14/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 9/26/2018 | 9/26/2018 | 11/13/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
1st review completed | | | 11/13/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | 9/26/2018 | | 11/8/2018 | | FAIL |
Julie Romig
|
|
|
Plan Review report emailed to applicant.
|
Routing PW Solid Waste | 9/26/2018 | | 10/15/2018 | | PASS |
Peter J. McCullough
|
|
|
|
Routing Off Site - STRUCTURAL | 9/26/2018 | | 10/10/2018 | | FAIL |
Julie Romig
|
|
|
AHJ - Corrections Required per ePlanReview
|
Routing PW Drainage | 9/26/2018 | | 10/4/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing - Design Review | 9/26/2018 | | 10/2/2018 | | PASS |
Andrea Tuning
|
|
|
DRH17-532 Andrea
|
Routing - MECHANICAL | 9/26/2018 | | 10/1/2018 | | PASS |
Troy James
|
|
|
See eplan for manual j reports and mechanical ventilaton design to mechanical detail sheet.
|
Routing - PLUMBING | 9/26/2018 | | 10/1/2018 | | PASS |
Dan Ediger
|
|
|
Per ISPC
|
Routing PW Sewer Design | 9/26/2018 | | 10/1/2018 | | PASS |
DeAnn Brown
|
|
|
|
Routing PW Sewer Rating | 9/26/2018 | | 10/1/2018 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Addressing | 9/26/2018 | | 9/28/2018 | | PASS |
Doug Chausow
|
|
|
Please note updated parcel number/ New address: 11792 W King St, Apts 101-108
|
Routing - Erosion and Sediment | 9/26/2018 | | 9/27/2018 | | PASS |
Andy J. Long
|
|
|
SWPPP approved. Valid stormwater team designated. Site already started under GRD18-00035, no site prep required.
|
Routing PW Street Lights | 9/26/2018 | | 9/27/2018 | | FAIL |
Tom Marshall
|
|
|
Need to update sheet SE-1
|
Routing - PLANNING | 9/26/2018 | | 9/27/2018 | | FAIL |
Susan Riggs
|
|
|
PUD17-22 Susan
APPLICANT MUST POST BOND FOR AMENITIES.
|
Routing - PUBLIC WORKS | 9/26/2018 | | 9/26/2018 | | PASS |
Beverly Mountain
|
|
|
|
Intake Approval | | | 9/21/2018 | | PASS |
|
|
|
|
Intake Approval | | | 8/28/2018 | | FAIL |
Joe Bruce
|
|
|
1. Verification of legal lot or parcel form must be signed/dated by PDS subdivision staff.
2. Sheet A-1.1 does not call out or designate any fire hydrants. Resubmit with this information.
3. Provide architectural stamp / signature on (A-205, A-402, A402.1, A-403, A-404, A-405, A-406)
4. Provide and upload form #310 - Statement of Special Inspections completed and stamped by the design engineer for all special inspections noted on sheet S0.01
5. Incorrect codes are referenced on sheet G002. Resubmit with currently adopted codes by City of Boise. (see redlines)
6. Incorrect version of IECC is used on G008 and G009. Resubmit with 2015 IECC
7. I did not see the Manual J report in the "Documents" folder or referenced on the drawings. Please upload the Manual J , Manual D, and Manual S reports noted on the checklist.
|
Application received | | | 8/27/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 27 2018 9:33AM
|
First Notice | | 10/26/2019 | | | |
|
|
|
|