Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-03123
StatusIssued
Name SRM CONSTRUCTION
Site Address 3217 W OVERLAND RD
Project NameSt. Vincent de Paul
Customer Number 
ePlanReviewNo
Description
(ST. VINCENT de PAUL OFFICE – INTERIOR AND EXTERIOR REMODEL) (DRH18-00343) This building does not have a fire sprinkler system. To remodel an existing 956 square foot office building that originally was a service station. Interior work includes removing some interior nonbearing walls and constructing new interior nonbearing walls, installing new or relocating existing interior doors, and upgrading a toilet room to be accessible to the disabled. Exterior work includes removing some exterior windows and doors, installing new or relocating existing windows and doors, and constructing exterior wall infills. All exterior openings are within former service bay openings. Existing exterior masonry walls are required to be maintained without new openings. New exterior siding will match the existing. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Other4/26/20194/29/20194/29/2019PCANC
DetailsJim Sly
fire culking // Steve Phone #: ###-####
Plan Reviewer's activity  12/21/2018 DONE
Paper drawings taken to Records
BLD-Final10/18/201810/19/201810/19/2018APASS
DetailsJim Sly
Steve Phone #: 208-250-
OK for Perm Occ.
BLD-Final10/16/201810/17/201810/17/2018PPART
DetailsJim Storey
Steve Phone #: ###-#### temp ok need lever hardware for office doors.
FIRE-Final Inspection10/16/201810/16/201810/16/2018PPASS
DetailsTroy Cobbley
life safety passed

Steve Phone #: ###-####
Zoning Approval10/16/201810/16/201810/16/2018 DONE
DetailsAndrea Tuning
FIRE-Final Inspection10/12/201810/15/201810/15/2018AFAIL
DetailsTroy Cobbley
Mount the fire extinguisher as discussed, provide ADA compliant hardware on the new and relocated doors as per the approved plans.

Steve Phone #: ###-####
BLD-Final10/12/201810/12/201810/12/2018PCANC
DetailsJim Storey
Steve Phone #: ###-#### needs fire life safety and P & Z- called Steve to let know that P&Z did not do inspection
BLD-Framing/Rough-in9/19/20189/20/20189/20/2018APASS
DetailsJim Storey
Steve Phone #: ###-####
Issue PAID IN FULL permit  9/12/2018 DONE
OVERRIDE  9/10/2018  
OVERRIDE  9/10/2018  
OVERRIDE  9/10/2018  
Plan assigned to (CJW)8/27/20188/27/20189/10/2018 PASS
DetailsCarl Westfall
(1st done) Minor TI - St Vincent
Routing - Design Review9/10/2018 9/10/2018 PASS
DetailsAndrea Tuning
Routing - PLAN CHECK9/10/2018 9/10/2018 DONE
DetailsCarl Westfall
Routing complete
1st review completed  9/10/2018 DONE
PLANS/APPL TAKEN TO FRONT DESK  9/10/2018 DONE
Override - Parcel Holds  9/10/2018  
Permit Ready to Issue  9/10/2018 DONE
MET
Need
GC form
Print Occupancy Form  9/10/2018 DONE
Telephone call  9/10/2018 DONE
called applicant and left vm permit is ready, fee due and need GC form
Routing - FIRE9/6/20189/7/20189/7/2018 PASS
DetailsErika Akin
Attached comments to case and plans
Routing - PLAN CHECK8/30/2018 9/6/2018 PASS
DetailsCarl Westfall
Routing - Addressing8/27/2018 8/30/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS  8/30/2018 PASS
Plans ACCEPTED BY PLAN TECH  8/27/2018 DONE
Intake Approval  8/27/2018 PASS
DetailsCarl Westfall
Override - Parcel Holds  8/27/2018  
Recd Pcfee & Taken To Pln CK  8/27/2018 DONE
Application received 8/27/2018