Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD18-03126
StatusFinaled
Name CASCADE BUILDERS
Site Address 476 S THOREAU WAY
Project NameKreegar PV
Customer Number 
ePlanReviewYes
Description
Permit for 158sq' of roof-mounted, grid-tied Photo-voltaic panels with optimizers; 18 panels in 2 arrays. All work per plans, manufacturer’s specs, & local code. Separate electrical permit required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Change Expiration Date Only  9/20/2019 DONE
change back exp date to first time permit issued
BLD-Final9/21/20189/24/20189/24/2018ADONE
DetailsMike Jordan
The electrical final was already done. They just need to mark it done in the system. Phone #: ###-#### Inspection requested via web by Sarah Schuller
DOC - Permit Finaled9/24/20189/24/20189/24/2018PPASS
DetailsMike Jordan
BLD-Final9/20/20189/21/20189/21/2018ANR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Sarah Schuller. Needs electrical final.
CHANGE STATUS TO (ISS)  9/20/2018 DONE
plan mod
Plan assigned to (JAB) Josh9/18/20189/18/20189/19/2018 PASS
DetailsJosh Bogle
Routing - PLAN CHECK9/18/2018 9/19/2018 PASS
DetailsJosh Bogle
PLAN MOD
PLANS/APPL TAKEN TO FRONT DESK  9/19/2018 DONE
DetailsJosh Bogle
Permit Ready to Issue  9/19/2018 DONE
PLAN MOD
Routing - PLANNING9/18/2018 9/18/2018 PASS
DetailsColleen T Carroll
PLAN MOD
Plan Modification Accepted  9/18/2018 DONE
Started Eplan work flow- Changing layout of roof plan
Plan assigned to (JAB) Josh9/5/20189/5/20189/14/2018 PASS
DetailsJosh Bogle
09/11 PV, ePlan - 1st done
Routing - PLAN CHECK9/14/2018 9/14/2018 PASS
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  9/14/2018 DONE
DetailsJosh Bogle
ESC no - Energy no
Permit Ready to Issue  9/14/2018 DONE
All requirements met
Issue PAID IN FULL permit  9/14/2018 DONE
CHANGE ISSUED DATE  9/14/2018 DONE
issued second time on 9/20 by error
Routing - PLAN CHECK9/13/2018 9/13/2018 FAIL
DetailsJosh Bogle
needs UL1703 listing for panel
Routing - PLAN CHECK9/10/2018 9/10/2018 FAIL
DetailsJosh Bogle
missing or mismatched specs
1st review completed  9/7/2018 FAIL
DetailsJosh Bogle
Routing - PLAN CHECK9/5/2018 9/7/2018 FAIL
DetailsJosh Bogle
no specification sheets
Routing - PLANNING9/5/2018 9/5/2018 PASS
DetailsColleen T Carroll
Intake Approval  9/5/2018 FAIL
Need to rotate plans
Plans ACCEPTED BY PLAN TECH  9/5/2018 DONE
Intake Approval  9/5/2018 PASS
Recd Pcfee & Taken To Pln CK  9/5/2018 DONE
Intake Approval  9/4/2018 FAIL
NEED
UPLOAD INDIVIDUAL
DOCUMENTS NEED TO BE IN CORRECT FOLDER
Application received  8/27/2018 DONE
Application submitted via PDS Online on Aug 27 2018 1:18PM