BLD-Final | 2/6/2019 | 2/7/2019 | 2/7/2019 | A | PASS |
Dave Hannah
|
|
|
Install 8 cantilever mounted white cabinets (special Inspection). 1 set of letters reading Main Marketplace and 2 M logos. Phone #: ###-#### Inspection requested via web by Ken Olsen
|
DOC - Permit Finaled | 2/7/2019 | 2/7/2019 | 2/7/2019 | P | PASS |
Dave Hannah
|
|
|
|
Plan assigned to (BJM) | 9/19/2018 | 9/19/2018 | 10/25/2018 | | DONE |
Brian McGowan
|
|
|
CSN18-00220 sign permit - Corrections Required (Engineering)
|
Intake Approval | | | 10/25/2018 | | FAIL |
Brian McGowan
|
|
|
|
Plan Reviewer's activity | | | 10/25/2018 | | |
Brian McGowan
|
|
|
Spoke with Tod to clarify that we do not have engineering for the structure his sign is being attached to and we will need it.
|
Intake Approval | | | 10/25/2018 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 10/25/2018 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 10/25/2018 | | 10/25/2018 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/25/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 10/25/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/25/2018 | | DONE |
|
|
|
|
Intake Approval | | | 10/12/2018 | | FAIL |
Brian McGowan
|
|
|
Mr. Taylor,
Thank you for the engineering you provided. I need some engineering on how the HS 2x2x1/8 frame is attached to the building or beam shown as well. The entire sign hangs from these attachments so we will need verification it complies with code.
Please respond to all the corrections requested.
|
Intake Approval | | | 9/25/2018 | | FAIL |
Brian McGowan
|
|
|
|
Application received | | | 8/27/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 27 2018 1:34PM
|
First Notice | 2/7/2019 | 2/7/2019 | | | |
Dave Hannah
|
|
|
|