Permit Information
Permit NumberBLD18-03129
StatusFinaled
Name MICHELE LATTER
Site Address 2001 N HILLWAY DR
Project NameLatter ADU
Customer NumberCAA18-00079
ePlanReviewYes
Description
WUI - HILLSIDE - Permit to build a 594sq' Accessory Dwelling Unit. All work per plans, notations, attachments, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB**
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.



All disturbed slopes included in the construction of this project must be stabilized and approved by Public Works before a Final Occupancy Permit is granted. If weather conditions prohibit revegetation and stabilization activities, the contractor shall provide a bond/surety agreement or an irrevocable letter of credit in the amount of 110% of the cost estimated by the project engineer to enable stabilization of the site. Call 208-608-7168 for an inspection.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance/Occupancy  6/8/2020 DONE
BLD-Final5/22/20205/28/20205/28/2020APASS
DetailsTony Young
// Ryan Phone #: ###-####// need to verify posted address
DOC - Permit Finaled5/28/20205/28/20205/28/2020PPASS
DetailsTony Young
BLD-Final5/26/20205/26/20205/26/2020PPASS
DetailsTony Young
BLD-Final5/18/20205/22/20205/22/2020PNR
DetailsTony Young
call for access - screened // Ryan Phone #: ###-####// still no address posted
BLD-Final5/15/20205/18/20205/18/2020ANR
DetailsTony Young
call for access - screened // Ryan Phone #: ###-####
BLD-Final5/14/20205/15/20205/15/2020APART
DetailsTony Young
call for access - screened // Ryan Phone #: ###-####// ok,, needs address posted
PubWorks Occupancy Approval5/1/20205/1/20205/1/2020 DONE
DetailsMelissa Jannusch
A letter from the applicant’s design professional indicating that the final grading, drainage, and stabilization is acceptable and landscaping photos have been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Energy code compliance1/23/20201/24/20201/30/2020PPASS
DetailsDave Hannah
John Phone #: ###-####
BLD-Energy code compliance1/28/20201/29/20201/29/2020APEND
DetailsDave Hannah
Jon Phone #: ###-####
BLD-Framing/Rough-in1/21/20201/21/20201/21/2020PPASS
DetailsTony Young
Ren Phone #: ###-####
BLD-Framing/Rough-in1/17/20201/17/20201/17/2020PNR
DetailsDave Hannah
Ren Phone #: ###-#### needs air seal and fireblocking
BLD-Wall Bracing12/27/201912/27/201912/27/2019PPASS
DetailsTony Young
Ren Phone #: ###-####
BLD-Concrete10/4/201910/7/201910/7/2019PPASS
DetailsTony Young
stem wall-Steve Phone #: ###-####
BLD-Footing9/27/201910/1/201910/1/2019APASS
DetailsTony Young
Ren Phone #: ###-####
BLD-Footing9/30/20199/30/20199/30/2019PPART
DetailsTony Young
John Phone #: ###-####,, work in progress
BLD-Footing9/30/20199/30/20199/30/2019APART
DetailsTony Young
Ren Phone #: ###-####,, work in progress,, setbacks appear ok,, will re-check rebar Tuesday morning prior to pouring
BLD-Aging Inspection9/25/20199/25/20199/27/2019 PEND
DetailsTony Young
BLD-Aging Inspection9/24/20199/24/20199/27/2019 PEND
DetailsTony Young
BLD-Conference9/26/20199/26/20199/27/2019PPEND
DetailsTony Young
follow up
PubWorks Subgrade Approval9/27/20199/27/20199/27/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####
Meeting  9/26/2019 DONE
Per Noah, RCH Construction is no longer working on the project and gave the approved plans and documents to the parcel owners. see email in documents
BLD-Conference9/17/20199/18/20199/18/2019PDONE
DetailsTony Young
Call about possible work being done differently then what is on approved plans and being to close to property line// talked to the contractor,, sounds like a surveyer will shoot in the building
BLD-Conference9/17/20199/17/20199/17/2019PNH
DetailsTony Young
Call about possible work being done differently then what is on approved plans and being to close to property line.. no one home to see plans,,
Issue PAID IN FULL permit  11/9/2018 DONE
Inspection Record Card- Bld  11/9/2018 DONE
Meeting  11/8/2018 DONE
sent email to derek about fees still due and who will be the GC
OVERRIDE  11/7/2018  
Plan assigned to (JAB) Josh9/4/20189/4/201811/7/2018 PASS
DetailsJosh Bogle
09/17 ADU, ePlan - Hillside - 1st done
Routing - PLAN CHECK10/29/2018 11/7/2018 PASS
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  11/7/2018 DONE
DetailsJosh Bogle
Permit Ready to Issue  11/7/2018 DONE
NEED
RP
Routing PW Grading-Hillside10/29/2018 11/6/2018 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call ###-#### to schedule an inspection.

Plan Reviewer's activity  10/16/2018 DONE
DetailsJosh Bogle
did Review Complete task, Hillside review finished
Routing PW Grading-Hillside10/8/2018 10/16/2018 FAIL
DetailsMelissa Jannusch
Please revise retaining wall calculations per changemark
Routing - PLAN CHECK10/8/2018 10/10/2018 PASS
DetailsJosh Bogle
Plan Reviewer's activity  10/8/2018 DONE
DetailsJosh Bogle
resubmittal accepted, routed to Hillside and Plan Review
1st review completed  9/17/2018 FAIL
DetailsJosh Bogle
Routing - PLAN CHECK9/4/2018 9/17/2018 FAIL
DetailsJosh Bogle
see e-mail 9-17-18
Routing - FIRE9/4/20189/4/20189/7/2018 PASS
DetailsTim Frost
New SFH ADU
Routing PW Grading-Hillside9/4/2018 9/7/2018 FAIL
DetailsMelissa Jannusch
See changemarks in ePlan and e-mail dated 9-7-2018
Route to Impact Fee Review9/4/20189/7/20189/5/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - Addressing9/4/2018 9/5/2018 PASS
DetailsDoug Chausow
ADU address: 2001 N Hillway Dr
Routing - Erosion and Sediment9/4/2018 9/5/2018 PASS
DetailsMichael Zawacki
RP needed. Site prep inspection required.
Routing - PUBLIC WORKS9/4/2018 9/4/2018 PASS
DetailsRachael Beierle
Routing - MECHANICAL9/4/2018 9/4/2018 PASS
DetailsTroy James
Mechanical ventilation shall be provided by a energy star fan or an ERV system
Routing - PLANNING9/4/2018 9/4/2018 PASS
DetailsBrent Moore
Intake Approval  9/4/2018 FAIL
Please provide a site plan of the whole parcel with the set backs.
Plans ACCEPTED BY PLAN TECH  9/4/2018 DONE
Intake Approval  9/4/2018 PASS
Recd Pcfee & Taken To Pln CK  9/4/2018 DONE
Intake Approval  8/28/2018 FAIL
PW hillside failed so sent back for corrections for PW before we do the prescreen
Application received  8/27/2018 DONE
Application submitted via PDS Online on Aug 27 2018 2:27PM