BLD-Final | 6/12/2019 | 6/13/2019 | 6/13/2019 | A | DONE |
Tony Young
|
|
|
Tom Phone #: ###-####
|
DOC - Permit Finaled | 6/13/2019 | 6/13/2019 | 6/13/2019 | P | PASS |
Tony Young
|
|
|
c of c issued,, prior issues ok now
|
BLD-Final | 6/3/2019 | 6/4/2019 | 6/4/2019 | A | FAIL |
Tony Young
|
|
|
Tom Phone #: ###-####- please call for access ,, needs guard rails, hand rails per code,, needs egress
|
BLD-Final | 5/17/2019 | 5/24/2019 | 5/24/2019 | P | CANC |
Tony Young
|
|
|
as late as possible // Tom Phone #: ###-#### canel per tom mcfarland
|
Routing - MECHANICAL | 5/6/2019 | | 5/6/2019 | | PASS |
Troy James
|
|
|
Revised manual j report
|
BLD-Energy code compliance | 1/17/2019 | 1/18/2019 | 1/18/2019 | P | PASS |
Brandon Shaw
|
|
|
Tom Phone #: ###-####
|
BLD-Foundation | 1/9/2019 | 1/10/2019 | 1/15/2019 | A | PEND |
Tony Young
|
|
|
Tommy Phone #: ###-####,, poured,,
|
BLD-Framing/Rough-in | 1/9/2019 | 1/10/2019 | 1/10/2019 | A | PART |
Tony Young
|
|
|
Tommy Phone #: ###-####,, ok to insulate,, need to verify seal package,, strap plates
|
PubWorks Subgrade Approval | 10/23/2018 | 10/23/2018 | 10/23/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Plan assigned to (M_H) | 9/5/2018 | | 10/17/2018 | | DONE |
Michael Hanson
|
|
|
09/11 #406 L2 Paper. 1st review completed - See email for corrections required. MDH 2nd review completed - See email for correction required. MDH
|
OVERRIDE | | | 10/12/2018 | | |
|
|
|
|
Routing Walk-In (BLD) | 10/12/2018 | 10/12/2018 | 10/12/2018 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 10/12/2018 | | 10/12/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 10/12/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/12/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/12/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 10/12/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/12/2018 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 10/11/2018 | | 10/11/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Routing - PLANNING | 9/5/2018 | | 10/11/2018 | | PASS |
Sue Cummings
|
|
|
|
Plan Reviewer's activity | | | 10/10/2018 | | DONE |
Josh Bogle
|
|
|
took plans to Planning
|
Routing Walk-In (BLD) | 10/9/2018 | 10/9/2018 | 10/9/2018 | P | PASS |
Josh Bogle
|
|
|
wanted to talk to Josh about resubmittals (Michael out of office)
|
Plan resubmittals received | | | 10/9/2018 | | DONE |
|
|
|
Resubmittal received 2 of 8 sheets 2 beam post & pad footings & 2 struc calcs-was told to put on JAB's chair
|
Routing - PLAN CHECK | 10/5/2018 | | 10/5/2018 | | FAIL |
Michael Hanson
|
|
|
Addition of WUI compliant deck requiring corrections and more information on the remodel required. MDH
|
Routing Walk-In (BLD) | 10/4/2018 | 10/4/2018 | 10/4/2018 | P | FAIL |
Josh Bogle
|
|
|
talked about Tommy's resubmittals
|
Plan resubmittals received | | | 10/4/2018 | | DONE |
|
|
|
two copies of calcs and whole new plans, stamped and taken to plan reviewer
|
1st review completed | | | 9/12/2018 | | FAIL |
Michael Hanson
|
|
|
See email for corrections required. MDH
|
Routing - PLAN CHECK | 9/5/2018 | | 9/12/2018 | | FAIL |
Michael Hanson
|
|
|
See email for corrections required. MDH
|
Routing - MECHANICAL | 9/10/2018 | | 9/10/2018 | | PASS |
Troy James
|
|
|
Manual j report
|
Routing Walk-In (BLD) | 9/5/2018 | 9/5/2018 | 9/5/2018 | A | PASS |
Michael Hanson
|
|
|
|
Intake Approval | | | 9/5/2018 | | PASS |
Michael Hanson
|
|
|
|
Routing - Erosion and Sediment | 9/5/2018 | | 9/5/2018 | | PASS |
Michael Zawacki
|
|
|
Waiver approved, owner to act as RP.
|
Routing Walk-In (BLD) | 8/28/2018 | 8/28/2018 | 8/28/2018 | P | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 8/28/2018 | | 8/28/2018 | | FAIL |
Josh Bogle
|
|
|
applicant getting better plans
|
1st review completed | | | 8/28/2018 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 8/28/2018 | | | |
|
|
|
|