BLD-Aging Inspection | 1/24/2019 | 1/24/2019 | 1/24/2019 | | CANC |
Brandon Shaw
|
|
|
|
BLD-Aging Inspection | 1/23/2019 | 1/23/2019 | 1/23/2019 | | CANC |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Foundation | 9/10/2018 | 9/11/2018 | 9/11/2018 | P | PASS |
Brandon Shaw
|
|
|
Ryan Phone #: ###-####
|
PubWorks Subgrade Approval | 9/11/2018 | 9/11/2018 | 9/11/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 8/31/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 8/30/2018 | 8/30/2018 | 8/31/2018 | | PASS |
Josh Bogle
|
|
|
09/05 pool, paper - Hillside
|
1st review completed | | | 8/31/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 8/31/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 8/31/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/31/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 8/31/2018 | | DONE |
|
|
|
met
|
Telephone call | | | 8/31/2018 | | DONE |
|
|
|
Spoke with Ryan to inform him the permit is ready and what fees are due.
|
Issue PAID IN FULL permit | | | 8/31/2018 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 8/30/2018 | | 8/31/2018 | | PASS |
Andy J. Long
|
|
|
Approval to include pool into original ESC plan document and same permit # as issued initially. Pool company RP added and Modification fee assessed to exisiting ESC permit.
|
Routing - PLAN CHECK | 8/30/2018 | | 8/31/2018 | | PASS |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 8/30/2018 | 8/30/2018 | 8/30/2018 | P | PASS |
Nicolette Womack
|
|
|
|
Routing Walk-In (BLD) | 8/30/2018 | 8/30/2018 | 8/30/2018 | P | PASS |
Josh Bogle
|
|
|
took in as a level two
|
Routing PW Grading-Hillside | 8/30/2018 | | 8/30/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling inspections. Please allow 24 hours for subgrade approval processing. If you have any questions call Melissa Jannusch ###-####.
|
Routing - PUBLIC WORKS | 8/30/2018 | | 8/30/2018 | | PASS |
Morgan Webb
|
|
|
|
Application received | | 8/30/2018 | | | |
|
|
|
|