Print Statement | | | 1/16/2019 | | DONE |
|
|
|
|
First Notice | | 12/30/2018 | 1/7/2019 | | DONE |
|
|
|
mailed 1-11-19
|
Permanent Occupancy | | | 12/20/2018 | | DONE |
|
|
|
|
BLD-Final | 12/18/2018 | 12/19/2018 | 12/19/2018 | P | PASS |
Jim Sly
|
|
|
John Phone #: ###-####
|
FIRE-Final Inspection | 12/18/2018 | 12/19/2018 | 12/19/2018 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
John Phone #: ###-####
|
BLD-Final | 11/29/2018 | 11/30/2018 | 11/30/2018 | A | PEND |
Dave Hannah
|
|
|
John Phone #: ###-#### ok for tco ok for perm co after fire fina;ls
|
FIRE-Final Inspection | 11/29/2018 | 11/30/2018 | 11/30/2018 | A | PART |
Troy Cobbley
|
|
|
A temporary for life safety is being given with Ron's approval until the project related fire alarm permit is finaled. FIR18-00909
John Phone #: ###-####
|
BLD-Final | 11/27/2018 | 11/29/2018 | 11/29/2018 | A | NR |
Mike Jordan
|
|
|
John Phone #: ###-####. Needs fire alarm permit. Fire/life/safety fianl failed.
|
FIRE-Final Inspection | 11/28/2018 | 11/29/2018 | 11/29/2018 | A | FAIL |
Troy Cobbley
|
|
|
The exit signs and emergency lights need to be repaired or replaced in both east facing and north facing entry lobby's. Also need a fire alarm permit for the modifications required.
Call 10 mins away- John Phone #: ###-####
|
FIRE-Final Inspection | 11/27/2018 | 11/28/2018 | 11/28/2018 | P | FAIL |
Troy Cobbley
|
|
|
Need the exit sign relocated as discussed and a fire alarm permit for the required modifications.
John Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 11/6/2018 | 11/7/2018 | 11/7/2018 | P | PASS |
Jim Sly
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 10/9/2018 | 10/10/2018 | 10/10/2018 | A | PASS |
Jim Sly
|
|
|
John Phone #: ###-####
|
Print Occupancy Form | | | 10/9/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/28/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/28/2018 | | DONE |
|
|
|
|
Plan assigned to (JG) | 9/12/2018 | 9/12/2018 | 9/25/2018 | | PASS |
Javier Guzman
|
|
|
9/24 L2 Connect Youth Care ePlan
|
Routing - PLAN CHECK | 9/12/2018 | | 9/25/2018 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 9/25/2018 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/25/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/25/2018 | | DONE |
|
|
|
NEED
GC FORM - met
REVISED VALUE - met
All met -
DO NOT ISSUE W/OUT BLD18-03324
|
Routing - Addressing | 9/12/2018 | | 9/12/2018 | | PASS |
Doug Chausow
|
|
|
Suite 120
|
Routing - PUBLIC WORKS | 9/12/2018 | | 9/12/2018 | | PASS |
Morgan Webb
|
|
|
sign off also indemark BLD18-03324
|
Intake Approval | | | 9/11/2018 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 9/7/2018 | | FAIL |
Joe Bruce
|
|
|
1) Form #304 Registered Design Professional form is missing the owner information.
2) Incorrect codes are referenced on Sheet G001. The adopted building codes are incorrectly listed for the NEC and IMC codes. Resubmit sheet with correct code references.
3) Provide exit signs and emergency lighting locations (existing and new) on plan.
4) Sheet A613 does not have the required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheets with a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block.
|
Application received | | | 8/30/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 30 2018 2:42PM
|