BLD-Final | 4/22/2019 | 4/23/2019 | 4/23/2019 | A | PASS |
Brandon Shaw
|
|
|
Rebecca Phone #: ###-####
|
DOC - Permit Finaled | 4/23/2019 | 4/23/2019 | 4/23/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Aging Inspection | 1/24/2019 | 1/24/2019 | 1/24/2019 | | CANC |
Brandon Shaw
|
|
|
|
BLD-Aging Inspection | 1/23/2019 | 1/23/2019 | 1/23/2019 | | CANC |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Framing/Rough-in | 9/11/2018 | 9/11/2018 | 9/11/2018 | P | PASS |
Brandon Shaw
|
|
|
OK to insulate
|
BLD-Footing | 9/11/2018 | 9/11/2018 | 9/11/2018 | P | PASS |
Brandon Shaw
|
|
|
Please call Mike Phone #: ###-#### Inspection requested via web by Michael Larson
|
PubWorks Subgrade Approval | 9/10/2018 | 9/10/2018 | 9/10/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 9/6/2018 | 9/6/2018 | 9/6/2018 | P | NR |
Brandon Shaw
|
|
|
Need soil subgrade submitted and approved by PW...
|
Plan assigned to (JAB) Josh | 8/30/2018 | 8/30/2018 | 9/4/2018 | | PASS |
Josh Bogle
|
|
|
09/05 repairs, Paper
|
Routing PW Grading-Hillside | 8/30/2018 | | 9/4/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor ###-####.
|
Routing - PLAN CHECK | 8/30/2018 | | 9/4/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 9/4/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 9/4/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/4/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/4/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 9/4/2018 | | DONE |
|
|
|
|
Telephone call | | | 9/4/2018 | | DONE |
|
|
|
spoke with mike informing him this permit is ready and the fee amount due for issuace
|
Issue PAID IN FULL permit | | | 9/4/2018 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 8/30/2018 | 8/30/2018 | 8/30/2018 | P | PASS |
Josh Bogle
|
|
|
took in and routed - Hillside
|
Routing - Erosion and Sediment | 8/30/2018 | | 8/30/2018 | | PASS |
Andy J. Long
|
|
|
No ESC permit required. Minimal exterior excavation.
|
Application received | | 8/30/2018 | | | |
|
|
|
|