BLD-Conference | 6/19/2019 | 6/20/2019 | 6/20/2019 | A | PASS |
Tony Young
|
|
|
Inspection requested via web by Tory Smith
|
DOC - Permit Finaled | 6/20/2019 | 6/20/2019 | 6/20/2019 | P | PASS |
Tony Young
|
|
|
final ok,, c of c-o issued
|
BLD-Final | 6/11/2019 | 6/12/2019 | 6/12/2019 | A | NR |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Tory Smith,, needs fire seperation
|
BLD-Energy code compliance | 1/9/2019 | 1/10/2019 | 1/11/2019 | P | PASS |
Dave Hannah
|
|
|
Tory Phone #: ###-####
|
BLD-Framing/Rough-in | 1/3/2019 | 1/4/2019 | 1/4/2019 | P | PASS |
Tony Young
|
|
|
Tory Phone #: ###-####,, verify egress
|
BLD-Wall Bracing | 11/13/2018 | 11/13/2018 | 11/13/2018 | P | PASS |
Tony Young
|
|
|
Tory Phone #: ###-####
|
BLD-Framing/Rough-in | 11/9/2018 | 11/13/2018 | 11/13/2018 | A | NR |
Tony Young
|
|
|
Tory Phone #: ###-####,, walk through only before the framer leaves job
|
BLD-Foundation | 10/10/2018 | 10/10/2018 | 10/10/2018 | P | PASS |
Tony Young
|
|
|
Tory Phone #: ###-####
|
BLD-Footing | 10/8/2018 | 10/9/2018 | 10/9/2018 | A | PASS |
Brandon Shaw
|
|
|
call when on way // Tory Phone #: ###-####
|
OVERRIDE | | | 9/11/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 9/4/2018 | 9/4/2018 | 9/11/2018 | | PASS |
Josh Bogle
|
|
|
09/10 addition, paper - 1st done
|
Routing - PLAN CHECK | 9/11/2018 | | 9/11/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 9/11/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/11/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/11/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 9/11/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/11/2018 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/10/2018 | | DONE |
|
|
|
Two copies of sheet A4 and A6, multiple copies of truss calcs taken to Josh
|
Routing Walk-In (Zoning) | 9/4/2018 | 9/4/2018 | 9/4/2018 | A | PASS |
KayCee Babb
|
|
|
|
Routing Walk-In (BLD) | 9/4/2018 | 9/4/2018 | 9/4/2018 | A | PASS |
Josh Bogle
|
|
|
took in as a level 2 for big structural
|
Routing - MECHANICAL | 9/4/2018 | | 9/4/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 9/4/2018 | | 9/4/2018 | | FAIL |
Josh Bogle
|
|
|
missing point load info - truss engineering
|
1st review completed | | | 9/4/2018 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 9/4/2018 | | | |
|
|
|
|